[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-31":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":597},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,31,50,2410,[13,34,44,56,68,78,88,100,112,124,136,148,160,172,184,196,208,220,228,236,244,256,268,280,292,304,316,328,340,352,364,376,388,400,412,424,436,448,460,472,484,496,508,520,532,544,556,568,576,585],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},907004,1,"单选题","（2014年真题）拌制外墙保温砂浆多用（）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","玻化微珠",true,{"key":24,"text":25,"correct":26},"B","石棉",false,{"key":28,"text":29,"correct":26},"C","膨胀蛭石",{"key":31,"text":32,"correct":26},"D","玻璃棉","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},907005,"（2013年真题）高速公路的防潮保温一般选用（）。",[38,39,40,42],{"key":20,"text":29,"correct":26},{"key":24,"text":21,"correct":26},{"key":28,"text":41,"correct":22},"聚苯乙烯板",{"key":31,"text":43,"correct":26},"矿渣棉",{"id":45,"libraryId":5,"type":15,"typeLabel":16,"stem":46,"options":47,"answer":28,"analysis":33},907006,"（2018年真题）使木材物理力学性质变化发生转折的指标为（）。",[48,50,52,54],{"key":20,"text":49,"correct":26},"平衡含水率",{"key":24,"text":51,"correct":26},"顺纹强度",{"key":28,"text":53,"correct":22},"纤维饱和点",{"key":31,"text":55,"correct":26},"横纹强度",{"id":57,"libraryId":5,"type":15,"typeLabel":16,"stem":58,"options":59,"answer":20,"analysis":33},907007,"（2018年真题）对中、高频均有吸声效果且安拆便捷，间距装饰效果的吸声结构应为（）。",[60,62,64,66],{"key":20,"text":61,"correct":22},"帘幕吸声结构",{"key":24,"text":63,"correct":26},"柔性吸声结构",{"key":28,"text":65,"correct":26},"薄板振动吸声结构",{"key":31,"text":67,"correct":26},"悬挂空间吸结构",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":28,"analysis":33},907009,"（2019年真题）下列纤维状绝热材料中，最高使用温度限值最低的是（）。",[72,74,75,76],{"key":20,"text":73,"correct":26},"岩棉",{"key":24,"text":25,"correct":26},{"key":28,"text":32,"correct":22},{"key":31,"text":77,"correct":26},"陶瓷纤维",{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":28,"analysis":33},907010,"（2020年真题）下列绝热材料中可使用温度最高的是（）。",[82,83,85,86],{"key":20,"text":32,"correct":26},{"key":24,"text":84,"correct":26},"泡沫塑料",{"key":28,"text":77,"correct":22},{"key":31,"text":87,"correct":26},"泡沫玻璃",{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":28,"analysis":33},907011,"（2017年真题）基坑采用轻型井点降水，其井点布置应考虑的主要因素是（）。",[92,94,96,98],{"key":20,"text":93,"correct":26},"水泵房的位置",{"key":24,"text":95,"correct":26},"土方机械型号",{"key":28,"text":97,"correct":22},"地下水位流向",{"key":31,"text":99,"correct":26},"基坑边坡支护形式",{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":31,"analysis":33},907012,"（2017年真题）电渗井点降水的井点管应（）。",[104,106,108,110],{"key":20,"text":105,"correct":26},"布置在地下水流上游侧",{"key":24,"text":107,"correct":26},"布置在地下水流下游侧",{"key":28,"text":109,"correct":26},"沿基坑中线布置",{"key":31,"text":111,"correct":22},"沿基坑外围布置",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":24,"analysis":33},907013,"（2017年真题）土石方在填筑施工时应（）。",[116,118,120,122],{"key":20,"text":117,"correct":26},"先将不同类别的土搅拌均匀",{"key":24,"text":119,"correct":22},"使用同类土填筑",{"key":28,"text":121,"correct":26},"分层填筑时需搅拌",{"key":31,"text":123,"correct":26},"将含水量大的黏土填筑在底层",{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":31,"analysis":33},907014,"（2017年真题）地基处理常采用强夯法，其特点在于（）。",[128,130,132,134],{"key":20,"text":129,"correct":26},"处理速度快、工期短，适用于城市施工",{"key":24,"text":131,"correct":26},"不适用于软黏土层处理",{"key":28,"text":133,"correct":26},"处理范围应小于建筑物基础范围",{"key":31,"text":135,"correct":22},"采取相应措施还可用于水下夯实",{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":24,"analysis":33},907015,"（2017年真题）钢筋混凝土预制桩锤击沉桩法施工，通常采用（）。",[140,142,144,146],{"key":20,"text":141,"correct":26},"轻锤低击的打桩方式",{"key":24,"text":143,"correct":22},"重锤低击的打桩方式",{"key":28,"text":145,"correct":26},"先四周后中间的打桩顺序",{"key":31,"text":147,"correct":26},"先打短桩后打长桩",{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":24,"analysis":33},907016,"（2017年真题）建筑主体结构采用泵送方式输送混凝土，其技术要求应满足（）。",[152,154,156,158],{"key":20,"text":153,"correct":26},"粗骨科粒径大于25mm时，出料口高度不宜超过60m",{"key":24,"text":155,"correct":22},"粗骨科最大粒径在40mm以内时可采用内径150mm的泵管",{"key":28,"text":157,"correct":26},"大体积混凝土浇筑入模温度不宜大于50℃",{"key":31,"text":159,"correct":26},"粉煤灰掺量可控制在25%～30%",{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":31,"analysis":33},907017,"（2017年真题）混凝土冬季施工时，应注意（）。",[164,166,168,170],{"key":20,"text":165,"correct":26},"不宜采用普通硅酸盐水泥",{"key":24,"text":167,"correct":26},"适当增加水灰比",{"key":28,"text":169,"correct":26},"适当添加缓凝剂",{"key":31,"text":171,"correct":22},"适当添加引气剂",{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":20,"analysis":33},907018,"（2017年真题）屋面防水工程应满足的要求是（）。",[176,178,180,182],{"key":20,"text":177,"correct":22},"结构找坡不应小于3%",{"key":24,"text":179,"correct":26},"找平层应留设间距不小于6m的分格缝",{"key":28,"text":181,"correct":26},"分格缝不宜与排气道贯通",{"key":31,"text":183,"correct":26},"涂膜防水层的无纱布，上下胎体搭接缝不应错开",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":24,"analysis":33},907019,"（2016年真题）对大面积二类土场地进行平整的主要施工机械应优先考虑（）。",[188,190,192,194],{"key":20,"text":189,"correct":26},"拉铲挖掘机",{"key":24,"text":191,"correct":22},"铲运机",{"key":28,"text":193,"correct":26},"正铲挖掘机",{"key":31,"text":195,"correct":26},"反铲挖掘机",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":31,"analysis":33},907020,"（2016年真题）在砂性土中施工直径2.5m的高压喷射注浆桩，应采用（）。",[200,202,204,206],{"key":20,"text":201,"correct":26},"单管法",{"key":24,"text":203,"correct":26},"二重管法",{"key":28,"text":205,"correct":26},"三重管法",{"key":31,"text":207,"correct":22},"多重管法",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},907021,"（2016年真题）在砂土地层中施工泥浆护壁成孔灌注桩，桩径1.8m，桩长52m，应优先考虑采用（）。",[212,214,216,218],{"key":20,"text":213,"correct":26},"正循环钻孔灌注桩",{"key":24,"text":215,"correct":22},"反循环钻孔灌注桩",{"key":28,"text":217,"correct":26},"钻孔扩底灌注桩",{"key":31,"text":219,"correct":26},"冲击成孔灌注桩",{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":24,"analysis":33},907022,"（2016年真题）墙体为构造拄砌成的马牙搓，其凹凸尺寸和高度可约为（）。 A.60mm和345mm B.60mm和260mm C.70mm和385mmD90mm和385mm",[224,225,226,227],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":26},{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":20,"analysis":33},907023,"（2016年真题）关于基坑土石方工程采用轻型井点降水，说法正确的是（）。 A.U型布置不封闭段是为施工机械进出基坑留的开口 B.双排井点管适用于宽度小于6m的基坑 C.单排井点管应布置在基坑的地下水下游一侧D施工机械不能经U型布置的开口端进出基坑",[232,233,234,235],{"key":20,"text":20,"correct":22},{"key":24,"text":24,"correct":26},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":26},{"id":237,"libraryId":5,"type":15,"typeLabel":16,"stem":238,"options":239,"answer":24,"analysis":33},907024,"（2016年真题）关于推土机施工作业，说法正确的是（）。 A.土质较软使切土深度较大时可采用分批集中后一次推送B并列推土的推土机数量不宜超过4台C沟槽推土法是先用小型推土机推出两侧沟槽后再用大型推土机推土D斜角推土法是指推土机行走路线沿斜向交叉推进",[240,241,242,243],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":26},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":28,"analysis":33},907025,"（2016年真题）关于单斗挖掘机作业特点，说法正确的是（）。",[248,250,252,254],{"key":20,"text":249,"correct":26},"正铲挖掘机：前进向下，自重切土",{"key":24,"text":251,"correct":26},"反铲挖掘机：后退向上，强制切土",{"key":28,"text":253,"correct":22},"拉铲挖掘机：后退向下，自重切土",{"key":31,"text":255,"correct":26},"抓铲挖掘机：前进向上，强制切土",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":24,"analysis":33},907026,"（2016年真题）关于钢筋混凝土预制桩施工，说法正确的是（）。",[260,262,264,266],{"key":20,"text":261,"correct":26},"基坑较大时，打桩宜从周边向中间进行",{"key":24,"text":263,"correct":22},"打桩宜采用重锤低击",{"key":28,"text":265,"correct":26},"钢筋混凝土预制桩堆放层数不超过2层",{"key":31,"text":267,"correct":26},"桩体混凝土强度达到设计强度的70%方可运输",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":28,"analysis":33},907027,"（2015年真题）在松散土体中开挖6m深的沟槽，支护方式应优先采用（）。",[272,274,276,278],{"key":20,"text":273,"correct":26},"间断式水平挡土板横撑式支撑",{"key":24,"text":275,"correct":26},"连续式水平挡土板式支撑",{"key":28,"text":277,"correct":22},"垂直挡土板式支撑",{"key":31,"text":279,"correct":26},"重力式支护结构支撑",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":31,"analysis":33},907028,"（2015年真题）以下土层中不宜采用重锤夯实地基的是（）。",[284,286,288,290],{"key":20,"text":285,"correct":26},"砂土",{"key":24,"text":287,"correct":26},"湿陷性黄土",{"key":28,"text":289,"correct":26},"杂填土",{"key":31,"text":291,"correct":22},"软黏土",{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":31,"analysis":33},907029,"（2015年真题）以下土层中可以用灰土桩挤密地基施工的是（）。",[296,298,300,302],{"key":20,"text":297,"correct":26},"地下水位以下，深度在15m以内的湿陷性黄土地基",{"key":24,"text":299,"correct":26},"地下水位以上，含水量不超过30%的地基土层",{"key":28,"text":301,"correct":26},"地下水位以下的人工填土地基",{"key":31,"text":303,"correct":22},"含水量在25%以下的人工填土地基",{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":24,"analysis":33},907030,"（2015年真题）钢筋混凝土预制桩的运输和堆放应满足以下要求（）。",[308,310,312,314],{"key":20,"text":309,"correct":26},"混凝土强度达到设计强度的70%方可运输",{"key":24,"text":311,"correct":22},"混凝土强度达到设计强度的100%方可运输",{"key":28,"text":313,"correct":26},"堆放层数不宜超过10层",{"key":31,"text":315,"correct":26},"不同规格的桩按上小下大的原则堆放",{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":24,"analysis":33},907031,"（2015年真题）采用锤击法打预制钢筋混凝土桩，方法正确的是（）。",[320,322,324,326],{"key":20,"text":321,"correct":26},"桩重大于2t时，不宜采用“重锤低击”施工",{"key":24,"text":323,"correct":22},"桩重小于2t时，可采用1.5-2倍桩重的桩锤",{"key":28,"text":325,"correct":26},"桩重大于2t时，可采用桩重2倍以上的桩锤",{"key":31,"text":327,"correct":26},"桩重小于2t时，可采用“轻锤高击”施工",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":24,"analysis":33},907032,"（2015年真题）打桩机正确的打桩顺序为（）。",[332,334,336,338],{"key":20,"text":333,"correct":26},"先外后内",{"key":24,"text":335,"correct":22},"先大后小",{"key":28,"text":337,"correct":26},"先短后长",{"key":31,"text":339,"correct":26},"先浅后深",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":20,"analysis":33},907033,"（2015年真题）静力压桩正确的施工工艺流程是（）。",[344,346,348,350],{"key":20,"text":345,"correct":22},"定位—吊桩—对中—压桩—接桩—压桩—送桩—切割桩头",{"key":24,"text":347,"correct":26},"吊桩—定位—对中—压桩—送桩—压桩—接桩—切割桩头",{"key":28,"text":349,"correct":26},"对中—吊桩—插桩—送桩—静压—接桩—压桩—切割桩头",{"key":31,"text":351,"correct":26},"吊桩—定位—压桩—送桩—接桩—压桩—切割桩头",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},907034,"（2015年真题）爆扩成孔灌注桩的主要优点在于（）。",[356,358,360,362],{"key":20,"text":357,"correct":26},"适于在软土中形成桩基础",{"key":24,"text":359,"correct":22},"扩大桩底支撑面",{"key":28,"text":361,"correct":26},"增大桩身周边土体的密实度",{"key":31,"text":363,"correct":26},"有效扩大桩柱直径",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},907035,"（2015年真题）预应力混凝土构件先张法施工工艺流程正确的为（）。",[368,370,372,374],{"key":20,"text":369,"correct":26},"安骨架、钢筋——张拉——安底、侧模——浇灌——养护——拆模——放张",{"key":24,"text":371,"correct":22},"安底模、骨架、钢筋——张拉——支侧模——浇灌——养护——拆模——放张",{"key":28,"text":373,"correct":26},"安骨架——安钢筋——安底、侧模——浇灌——张拉——养护——放张——拆模",{"key":31,"text":375,"correct":26},"安底、侧模——安钢筋——张拉——浇灌——养护——放张——拆模",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":28,"analysis":33},907036,"（2014年真题）采用明排水法开挖基坑，在基坑开挖过程中设置的集水坑应（）。",[380,382,384,386],{"key":20,"text":381,"correct":26},"布置在基础范围以内",{"key":24,"text":383,"correct":26},"布置在基坑底部中央",{"key":28,"text":385,"correct":22},"布置在地下水走向的上游",{"key":31,"text":387,"correct":26},"经常低于挖土面1.0m以上",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":24,"analysis":33},907037,"（2014年真题）用推土机回填管沟，当无倒车余地时一般采用（）。",[392,394,396,398],{"key":20,"text":393,"correct":26},"沟槽推土法",{"key":24,"text":395,"correct":22},"斜角推土法",{"key":28,"text":397,"correct":26},"下坡推土法",{"key":31,"text":399,"correct":26},"分批集中，一次推土法",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":31,"analysis":33},907038,"（2014年真题）北方寒冷地区采用轻型井点降水时，井点管与集水总管连接应用（）。",[404,406,408,410],{"key":20,"text":405,"correct":26},"PVC—U管",{"key":24,"text":407,"correct":26},"PVC—C管",{"key":28,"text":409,"correct":26},"PP—R管",{"key":31,"text":411,"correct":22},"橡胶软管",{"id":413,"libraryId":5,"type":15,"typeLabel":16,"stem":414,"options":415,"answer":24,"analysis":33},907039,"（2014年真题）关于预应力后张法的施工工艺，下列说法正确的是（）。",[416,418,420,422],{"key":20,"text":417,"correct":26},"灌浆孔的间距，对预埋金属螺旋管不宜大于40m",{"key":24,"text":419,"correct":22},"张拉预应力筋时，设计无规定的，构件混凝土的强度不低于设计强度等级的75%",{"key":28,"text":421,"correct":26},"对后张法预应力梁，张拉时现浇结构混凝土的龄期不宜小于5d",{"key":31,"text":423,"correct":26},"孔道灌浆所用水泥浆拌和后至灌浆完毕的时间不宜超过35min",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":20,"analysis":33},907040,"（2014年真题）跨度18m的钢屋架拼装应采用（）。",[428,430,432,434],{"key":20,"text":429,"correct":22},"构件平装法",{"key":24,"text":431,"correct":26},"构件立装法",{"key":28,"text":433,"correct":26},"利用模具拼装法",{"key":31,"text":435,"correct":26},"利用析架拼装法",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},907041,"（2014年真题）单斗抓铲挖掘机的作业特点是（）。",[440,442,444,446],{"key":20,"text":441,"correct":26},"前进向下，自重切土",{"key":24,"text":443,"correct":26},"后退向下，自重切土",{"key":28,"text":445,"correct":26},"后退向下，强制切土",{"key":31,"text":447,"correct":22},"直上直下，自重切土",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":31,"analysis":33},907042,"（2014年真题）相对其他施工方法，板柱框架结构的楼板采用升板法施工的优点是（）。",[452,454,456,458],{"key":20,"text":453,"correct":26},"节约模板，造价较低",{"key":24,"text":455,"correct":26},"机械化程度高，造价较低",{"key":28,"text":457,"correct":26},"用钢量小，造价较低",{"key":31,"text":459,"correct":22},"不用大型机械，适宜狭地施工",{"id":461,"libraryId":5,"type":15,"typeLabel":16,"stem":462,"options":463,"answer":31,"analysis":33},907043,"（2014年真题）关于钢筋混凝土预制桩加工制作，说法正确的是（）。",[464,466,468,470],{"key":20,"text":465,"correct":26},"长度在10cm以上的桩必须工厂预制",{"key":24,"text":467,"correct":26},"重叠法预制不宜超过5层",{"key":28,"text":469,"correct":26},"重叠法预制下层桩强度达到设计强度70%以上时方可灌注上层桩",{"key":31,"text":471,"correct":22},"桩的强度达到设计强度的70%方可起吊",{"id":473,"libraryId":5,"type":15,"typeLabel":16,"stem":474,"options":475,"answer":20,"analysis":33},907044,"（2014年真题）混凝土或抹灰基层涂刷溶剂型涂料时，含水率不得大于（）。",[476,478,480,482],{"key":20,"text":477,"correct":22},"8%",{"key":24,"text":479,"correct":26},"9%",{"key":28,"text":481,"correct":26},"10%",{"key":31,"text":483,"correct":26},"12%",{"id":485,"libraryId":5,"type":15,"typeLabel":16,"stem":486,"options":487,"answer":24,"analysis":33},907045,"（2014年真题）桥梁墩台基础施工时，在砂夹卵石层中，优先采用的主要沉桩为（）。",[488,490,492,494],{"key":20,"text":489,"correct":26},"锤击沉桩",{"key":24,"text":491,"correct":22},"射水沉桩",{"key":28,"text":493,"correct":26},"振动沉桩",{"key":31,"text":495,"correct":26},"静力压桩",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":28,"analysis":33},907046,"（2013年真题）通常情况下，基坑土方开挖的明排水法主要适用于（）。",[500,502,504,506],{"key":20,"text":501,"correct":26},"细砂土层",{"key":24,"text":503,"correct":26},"粉砂土层",{"key":28,"text":505,"correct":22},"粗粒土层",{"key":31,"text":507,"correct":26},"淤泥土层",{"id":509,"libraryId":5,"type":15,"typeLabel":16,"stem":510,"options":511,"answer":31,"analysis":33},907047,"（2013年真题）在渗透系数大，地下水量大的土层中，适宜采用的降水形式为（）。",[512,514,516,518],{"key":20,"text":513,"correct":26},"轻型井点",{"key":24,"text":515,"correct":26},"电渗井点",{"key":28,"text":517,"correct":26},"喷射井点",{"key":31,"text":519,"correct":22},"管井井点",{"id":521,"libraryId":5,"type":15,"typeLabel":16,"stem":522,"options":523,"answer":31,"analysis":33},907048,"（2013年真题）为了提高铲运机铲土效率，适宜采用的铲运方法为（）。",[524,526,528,530],{"key":20,"text":525,"correct":26},"上坡铲土",{"key":24,"text":527,"correct":26},"并列铲土",{"key":28,"text":529,"correct":26},"斜向铲土",{"key":31,"text":531,"correct":22},"间隔铲土",{"id":533,"libraryId":5,"type":15,"typeLabel":16,"stem":534,"options":535,"answer":31,"analysis":33},907049,"（2013年真题）关于地基夯实加固处理成功的经验是（）。",[536,538,540,542],{"key":20,"text":537,"correct":26},"沙土、杂填土和软粘土层适宜采用重锤夯实",{"key":24,"text":539,"correct":26},"地下水距地面0.8m以上的湿陷性黄土不宜采用重锤夯实",{"key":28,"text":541,"correct":26},"碎石土、砂土、粪土不宜采用强夯法",{"key":31,"text":543,"correct":22},"工业废渣、垃圾地基适宜采用强夯法",{"id":545,"libraryId":5,"type":15,"typeLabel":16,"stem":546,"options":547,"answer":20,"analysis":33},907050,"（2013年真题）现场采用重叠法预制钢筋混凝土桩时，上层桩的浇注应等到下层桩混凝土强度达到设计强度等级的（）。",[548,550,552,554],{"key":20,"text":549,"correct":22},"30%",{"key":24,"text":551,"correct":26},"60%",{"key":28,"text":553,"correct":26},"70%",{"key":31,"text":555,"correct":26},"100%",{"id":557,"libraryId":5,"type":15,"typeLabel":16,"stem":558,"options":559,"answer":24,"analysis":33},907051,"（2013年真题）对于大跨度的焊接球节点钢管网架的吊装，处于防火等级考虑，一般选用（）。",[560,562,564,566],{"key":20,"text":561,"correct":26},"大跨度结构高空拼装法施工",{"key":24,"text":563,"correct":22},"大跨度结构整体吊装法施工",{"key":28,"text":565,"correct":26},"大跨度结构整体顶升法施工",{"key":31,"text":567,"correct":26},"大跨度结构滑移施工法",{"id":569,"libraryId":5,"type":15,"typeLabel":16,"stem":570,"options":571,"answer":24,"analysis":33},907052,"（2018年真题）基坑开挖时，采用明排法施工，其集水坑应设置在（）。 A.基础范围以外的地下水走向的下游 B.基础范围以外的地下水走向的上游C便于布置抽水设施的基坑边角处 D.不影响施工交通的基坑边角处",[572,573,574,575],{"key":20,"text":20,"correct":26},{"key":24,"text":24,"correct":22},{"key":28,"text":28,"correct":26},{"key":31,"text":31,"correct":26},{"id":577,"libraryId":5,"type":15,"typeLabel":16,"stem":578,"options":579,"answer":24,"analysis":33},907053,"（2018年真题）在挖深3m，1-3类土砂性土壤基坑，且地下水位较高，宜优先选用（）。",[580,581,582,583],{"key":20,"text":193,"correct":26},{"key":24,"text":195,"correct":22},{"key":28,"text":189,"correct":26},{"key":31,"text":584,"correct":26},"抓铲挖掘机",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":28,"analysis":33},907054,"（2018年真题）利用爆破石渣和碎石填筑大型地基，应优先选用的压实机械为（）。",[589,591,593,595],{"key":20,"text":590,"correct":26},"羊足碾",{"key":24,"text":592,"correct":26},"平碾",{"key":28,"text":594,"correct":22},"振动碾",{"key":31,"text":596,"correct":26},"蛙式打夯机",[598,601,604,607,610,613],{"id":15,"name":599,"category":7,"favorite":600},"领导干部任职前廉政法规知识测试题",92,{"id":602,"name":603,"category":7,"favorite":15},595,"建筑结构与设备",{"id":605,"name":606,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":608,"name":609,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":611,"name":612,"category":7,"favorite":8},534,"BIM工程师",{"id":614,"name":612,"category":7,"favorite":8},535]