[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-24":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,24,50,2410,[13,34,46,58,70,78,90,102,114,126,138,150,162,174,186,198,210,222,234,246,258,270,282,294,306,318,330,342,354,366,378,390,402,414,424,436,448,458,466,478,490,502,514,526,538,550,562,574,586,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":20,"analysis":33},906650,1,"单选题","根据《建设工程工程量清单计价规范》，实心砖外墙高度的计算，正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","坡屋面无檐口天棚的算至屋面板底",true,{"key":24,"text":25,"correct":26},"B","坡屋面有屋架且有天棚的算至屋架下弦底",false,{"key":28,"text":29,"correct":26},"C","坡屋面有屋架无天棚的算至屋架下弦底另加200mm",{"key":31,"text":32,"correct":26},"D","平屋面算至钢筋混凝土板顶","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},906651,"根据《房屋建筑与装饰工程量计算规范》GB50854—2013，关于金属结构工程量计算的说法，正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"钢吊车梁工程量包括制动梁、制动桁架工程量",{"key":24,"text":41,"correct":26},"钢管柱按设计力求尺寸以质量计算，扣除加强环、内衬管工程量",{"key":28,"text":43,"correct":26},"空腹钢柱按设计图示尺寸以长度计算",{"key":31,"text":45,"correct":26},"实腹钢柱按图示尺寸的长度计算，牛腿和悬臂梁质量另计",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},906652,"基坑与边坡支护中，钢支撑按设计图示尺寸以（ ）计算。",[50,52,54,56],{"key":20,"text":51,"correct":26},"面积",{"key":24,"text":53,"correct":26},"体积",{"key":28,"text":55,"correct":26},"桩长",{"key":31,"text":57,"correct":22},"质量",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},906653,"基坑与边坡支护计算时以立方米为单位的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"咬合灌注桩",{"key":24,"text":65,"correct":26},"型钢桩",{"key":28,"text":67,"correct":26},"钢支撑",{"key":31,"text":69,"correct":22},"钢筋混凝土支撑",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},906654,"基地处理中深层搅拌桩，按设计图示尺寸以（ ）计算。",[74,75,76,77],{"key":20,"text":51,"correct":26},{"key":24,"text":53,"correct":26},{"key":28,"text":55,"correct":22},{"key":31,"text":57,"correct":26},{"id":79,"libraryId":5,"type":15,"typeLabel":16,"stem":80,"options":81,"answer":28,"analysis":33},906655,"后张法预应力钢筋混凝土梁长6m，留设直线孔道，选用低合金钢筋作预应力筋，一端采用帮条锚具，另一端采用镦头插片，则预应力钢筋单根长度为（ ）m。",[82,84,86,88],{"key":20,"text":83,"correct":26},"5．65",{"key":24,"text":85,"correct":26},"6．00",{"key":28,"text":87,"correct":22},"6．15",{"key":31,"text":89,"correct":26},"6．30",{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":28,"analysis":33},906656,"关于涂膜防水屋面工程量计算方法正确的是（ ）。",[94,96,98,100],{"key":20,"text":95,"correct":26},"平屋顶找坡按斜面积计算",{"key":24,"text":97,"correct":26},"应扣除房上烟囱、屋面小气窗及0．3m2以上的孔洞面积",{"key":28,"text":99,"correct":22},"女儿墙、伸缩缝处弯起部分并入屋面工程量计算",{"key":31,"text":101,"correct":26},"斜屋面按水平投影面积计算",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":24,"analysis":33},906657,"关于石砌体工程量计算，基础与勒脚应以（ ）为界。",[106,108,110,112],{"key":20,"text":107,"correct":26},"设计室内地面",{"key":24,"text":109,"correct":22},"设计室外地坪",{"key":28,"text":111,"correct":26},"以设计室内与室外的地面相比地坪较高者",{"key":31,"text":113,"correct":26},"以设计室内与室外的地面相比地坪较低者",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},906658,"关于螺栓、铁件工程量计量的说法，正确的是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":26},"螺栓以个计量，按数量计算",{"key":24,"text":121,"correct":26},"机械连接，按设计图示尺寸以质量计算",{"key":28,"text":123,"correct":22},"预埋铁件，按设计图示尺寸以质量计算",{"key":31,"text":125,"correct":26},"螺栓、预埋铁件和机械连接以个计量，按数量计算",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":24,"analysis":33},906659,"根据《房屋建筑与装饰工程工程量计算规范》GB 50584 2013规定，关于金属结构工程量计算，说法正确的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":26},"钢管柱牛腿工程量列入其他项目中",{"key":24,"text":133,"correct":22},"钢网架按设计图示尺寸以质量计算",{"key":28,"text":135,"correct":26},"金属结构工程量应扣除孔眼、切边质量",{"key":31,"text":137,"correct":26},"金属结构工程量应增加铆钉、螺栓质量",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},906660,"根据《房屋建筑与装饰工程工程量计算规范》GB 508542013规定，关于楼地面防水防潮工程量计算，说法正确的是（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":22},"按设计图示尺寸以面积计算",{"key":24,"text":145,"correct":26},"按主墙间净面积计算，搭接和反边部分不计",{"key":28,"text":147,"correct":26},"反边高度≤300mm部分不计算",{"key":31,"text":149,"correct":26},"反边高度>300mm部分计入楼地面防水",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":31,"analysis":33},906661,"根据《房屋建筑与装饰工程工程量计算规范》GB 508542013规定，有关防腐程量计算，说法正确的是（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":26},"隔离层平面防腐，洞口开口部分按图示面积计入",{"key":24,"text":157,"correct":26},"隔离层立面防腐，门洞口侧壁部分不计算",{"key":28,"text":159,"correct":26},"砌筑沥青浸渍砖，按图示水平投影面积计算",{"key":31,"text":161,"correct":22},"立面防腐涂料，门洞侧壁按展开面积并入墙面积内",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":24,"analysis":33},906662,"根据《房屋建筑与装饰工程工程量计算规范》GB 50584-2013，某钢筋混凝土梁长为12000mm。设计保护层厚度为25mm，钢筋为Φ10@300，则该梁所配箍筋数量应为（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":26},"40根",{"key":24,"text":169,"correct":22},"41根",{"key":28,"text":171,"correct":26},"42根",{"key":31,"text":173,"correct":26},"300根",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":20,"analysis":33},906663,"根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，关于油漆、涂料工程量计算，说法正确的是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"木材料构件喷刷防火涂料按设计图示以面积计算",{"key":24,"text":181,"correct":26},"金属构件刷防火涂料按构件单面外围面积计算",{"key":28,"text":183,"correct":26},"空花格、栏杆刷涂料按设计图示尺寸以双面面积计算",{"key":31,"text":185,"correct":26},"线条刷涂料按设计展开面积计算",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":20,"analysis":33},906664,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于石方的项目列项或工程量计算正确的为（ ）。",[190,192,194,196],{"key":20,"text":191,"correct":22},"山坡凿石按一般石方列项",{"key":24,"text":193,"correct":26},"考虑石方运输，石方体积需折算为虚方体积计算",{"key":28,"text":195,"correct":26},"管沟石方均按一般石方列项",{"key":31,"text":197,"correct":26},"基坑底面积超过120㎡的按一般石方列项",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":24,"analysis":33},906665,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，若开挖设计长为20m，宽为6m，深度为0.8m的土方工程，在清单中列项应为（ ）。",[202,204,206,208],{"key":20,"text":203,"correct":26},"平整场地",{"key":24,"text":205,"correct":22},"挖沟槽",{"key":28,"text":207,"correct":26},"挖基坑",{"key":31,"text":209,"correct":26},"挖一般土方",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},906666,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于地基处理工程量计算正确的为（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":26},"振冲桩（填料）按设计图示处理范围以面积计算",{"key":24,"text":217,"correct":26},"砂石桩按设计图示尺寸以桩长（不包括桩尖）计算",{"key":28,"text":219,"correct":26},"水泥粉煤灰碎石桩按设计图示尺寸以体积计算",{"key":31,"text":221,"correct":22},"深层搅拌桩按设计图示尺寸以桩长计算",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":24,"analysis":33},906667,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于基坑支护工程量计算正确的为（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":26},"地下连续墙按设计图示墙中心线长度以m计算",{"key":24,"text":229,"correct":22},"预制钢筋混凝土板桩按设计图示数量以根计算",{"key":28,"text":231,"correct":26},"钢板桩按设计图示数量以根计算",{"key":31,"text":233,"correct":26},"喷射混凝土按设计图示面积乘以喷层厚度以体积计算",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":28,"analysis":33},906668,"根据《房屋建筑与装饰工程量计量规范》GB50854-2013，关于地基处理说法正确的是（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":26},"铺设土工合成材料按设计长度计算",{"key":24,"text":241,"correct":26},"强夯地基按设计图示处理范围乘以深度以体积计算",{"key":28,"text":243,"correct":22},"填料振冲桩按设计图示尺寸以体积计算",{"key":31,"text":245,"correct":26},"砂石桩按设计数量以根计算",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":20,"analysis":33},906669,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于桩基础的项目列项或工程量计算正确的为（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"预制钢筋混凝土管桩试验桩应在工程量清单中单独列项",{"key":24,"text":253,"correct":26},"预制钢筋混凝土方桩试验桩工程量应并入预制钢筋混凝土方桩项目",{"key":28,"text":255,"correct":26},"现场截凿桩头工程量不单独列项，并入桩工程量计算",{"key":31,"text":257,"correct":26},"挖孔桩土方按设计桩长（包括桩尖）以米计算",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},906670,"根据《房屋建筑与装饰工程量计量规范》GB50854-2013，关于砌墙工程量计算，说法正确的是（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":22},"扣除凹进墙内的管槽、暖气槽所占体积",{"key":24,"text":265,"correct":26},"扣除伸人墙内的梁头、板头所占体积",{"key":28,"text":267,"correct":26},"扣除凸出墙面砌垛体积",{"key":31,"text":269,"correct":26},"扣除檩头、垫木所占体积",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":31,"analysis":33},906671,"关于砖砌体工程量计算说法正确的为（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":26},"基础与墙身使用不同材料时，以不同材料为分界线",{"key":24,"text":277,"correct":26},"基础与墙身使用不同材料时，以设计室内地面为分界线",{"key":28,"text":279,"correct":26},"砖围墙应以设计室内地面为界",{"key":31,"text":281,"correct":22},"基础与墙（柱）身使用同一种材料时，以设计室内地面为界",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":20,"analysis":33},906672,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于现浇混凝土基础的项目列项或工程量计算正确的为（ ）。",[286,288,290,292],{"key":20,"text":287,"correct":22},"箱式满堂基础中的墙按现浇混凝土墙列项",{"key":24,"text":289,"correct":26},"箱式满堂基础中的梁按满堂基础列项",{"key":28,"text":291,"correct":26},"框架式设备基础的基础部分按现浇混凝土墙列项",{"key":31,"text":293,"correct":26},"框架式设备基础的柱和梁按设备基础列项",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":31,"analysis":33},906673,"根据《房屋建筑与装饰工程量计量规范》GB50854-2013，关于现浇混凝土柱高计算，说法正确的是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":26},"有梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":24,"text":301,"correct":26},"无梁板的柱高自楼板上表面至上一层楼板下表面之间的高度计算",{"key":28,"text":303,"correct":26},"框架柱的柱高自柱基上表面至柱顶高度减去各层板厚的高度计算",{"key":31,"text":305,"correct":22},"构造柱按全高计算",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},906674,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于预制混凝土构件工程量计算，说法正确的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":22},"如以构件数量作为计量单位，特征描述中必须说明单件体积",{"key":24,"text":313,"correct":26},"异形柱应扣除构件内预埋铁件所占体积，铁件另计",{"key":28,"text":315,"correct":26},"大型板应扣除单个尺寸≤300mm×300mm的孔洞所占体积",{"key":31,"text":317,"correct":26},"空心板不扣除空洞体积",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":28,"analysis":33},906675,"后张法施工预应力混凝土，孔道长度为12.00m，采用后张混凝土自锚低合金钢筋。钢筋工程量计算的每孔钢筋长度为（ ）m。",[322,324,326,328],{"key":20,"text":323,"correct":26},"12.00",{"key":24,"text":325,"correct":26},"12.15",{"key":28,"text":327,"correct":22},"12.35",{"key":31,"text":329,"correct":26},"13.00",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":24,"analysis":33},906676,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013。某钢筋混凝土梁长为12000mm。设计保护层厚为25mm，钢筋为A10@300，则该梁所配钢筋数量应为（ ）根。",[334,336,338,340],{"key":20,"text":335,"correct":26},"40",{"key":24,"text":337,"correct":22},"41",{"key":28,"text":339,"correct":26},"42",{"key":31,"text":341,"correct":26},"300",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":24,"analysis":33},906677,"对于HPB300级光圆钢筋受拉时，钢筋末端作180°弯钩时，弯钩的弯折后平直段长度不应小于钢筋直径d的（ ）倍。",[346,348,350,352],{"key":20,"text":347,"correct":26},"2.5",{"key":24,"text":349,"correct":22},"3",{"key":28,"text":351,"correct":26},"3.5",{"key":31,"text":353,"correct":26},"4",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":28,"analysis":33},906678,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于金属结构工程量计算，说法正确的是（ ）。",[358,360,362,364],{"key":20,"text":359,"correct":26},"钢桁架工程量应增加铆钉质量",{"key":24,"text":361,"correct":26},"钢桁架工程量中应扣除切边部分质量",{"key":28,"text":363,"correct":22},"钢屋架工程量中螺栓质量不另计算",{"key":31,"text":365,"correct":26},"钢屋架工程量中应扣除孔眼质量",{"id":367,"libraryId":5,"type":15,"typeLabel":16,"stem":368,"options":369,"answer":28,"analysis":33},906679,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，有关木结构工程量计算，说法正确的是（ ）。",[370,372,374,376],{"key":20,"text":371,"correct":26},"木屋架的跨度应与墙或柱的支撑点间的距离计算",{"key":24,"text":373,"correct":26},"木屋架的马尾、折角工程量不予计算",{"key":28,"text":375,"correct":22},"钢木屋架钢拉杆、连接螺栓不单独列项计算",{"key":31,"text":377,"correct":26},"木柱区分不同规格以高度计算",{"id":379,"libraryId":5,"type":15,"typeLabel":16,"stem":380,"options":381,"answer":24,"analysis":33},906680,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于抹灰工程量说法正确的是（ ）。",[382,384,386,388],{"key":20,"text":383,"correct":26},"墙面抹灰工程量应扣除墙与构件交接处面积",{"key":24,"text":385,"correct":22},"有墙裙的内墙抹灰按主墙间净长乘以墙裙顶至天棚底高度以面积计算",{"key":28,"text":387,"correct":26},"内墙裙抹灰不单独计算",{"key":31,"text":389,"correct":26},"外墙抹灰按外墙展开面积计算",{"id":391,"libraryId":5,"type":15,"typeLabel":16,"stem":392,"options":393,"answer":20,"analysis":33},906681,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于天棚装饰工程量计算，说法正确的是（ ）。",[394,396,398,400],{"key":20,"text":395,"correct":22},"灯带（槽）按设计图示尺寸以框外围面积计算",{"key":24,"text":397,"correct":26},"灯带（槽）按设计图示尺寸以延长米计算",{"key":28,"text":399,"correct":26},"送风口按设计图示尺寸以结构内边线面积计算",{"key":31,"text":401,"correct":26},"回风口按设计图示尺寸以面积计算",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":24,"analysis":33},906682,"某建筑工程挖土方工程量需要通过现场签证核定，已知用斗容量为1.5m3的轮胎式装载机运土600车，则挖土工程量应为（ ）m3。",[406,408,410,412],{"key":20,"text":407,"correct":26},"602.30",{"key":24,"text":409,"correct":22},"692.31",{"key":28,"text":411,"correct":26},"747.78",{"key":31,"text":413,"correct":26},"900.00",{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":24,"analysis":33},906683,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，当土方开挖底长≤3倍底宽，且底面积≥150㎡，开挖深度为0.8m时，清单项目应列为（ ）。",[418,419,420,422],{"key":20,"text":203,"correct":26},{"key":24,"text":209,"correct":22},{"key":28,"text":421,"correct":26},"挖沟槽土方",{"key":31,"text":423,"correct":26},"挖基坑土方",{"id":425,"libraryId":5,"type":15,"typeLabel":16,"stem":426,"options":427,"answer":24,"analysis":33},906684,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于现浇混凝土柱的工程量计算正确的为（ ）。",[428,430,432,434],{"key":20,"text":429,"correct":26},"有梁板的柱按设计图示截面积乘以柱基以上表面或楼板上表面至上一层楼板底面之间的高度以体积计算",{"key":24,"text":431,"correct":22},"无梁板的柱按设计图示截面积乘以柱基以上表面或楼板上表面至柱帽下表面之间的高度以体积计算",{"key":28,"text":433,"correct":26},"框架柱按柱基上表面至柱顶高度以米计算",{"key":31,"text":435,"correct":26},"构造柱按设计柱高以米计算",{"id":437,"libraryId":5,"type":15,"typeLabel":16,"stem":438,"options":439,"answer":31,"analysis":33},906685,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于现浇混凝土柱工程量计算，说法正确的是（ ）。",[440,442,444,446],{"key":20,"text":441,"correct":26},"有梁板矩形独立柱工程量按柱设计截面积乘以自柱基底面至板面高度以体积计算",{"key":24,"text":443,"correct":26},"无梁板矩形柱工程量按柱设计截面积乘以自楼板上表面至柱帽上表面高度以体积计算",{"key":28,"text":445,"correct":26},"框架柱工程量按柱设计截面积乘以自柱基底面至柱顶面高度以体积计算",{"key":31,"text":447,"correct":22},"构造柱按设计尺寸自柱底面至顶面全高以体积计算",{"id":449,"libraryId":5,"type":15,"typeLabel":16,"stem":450,"options":451,"answer":24,"analysis":33},906687,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，关于金属结构工程量计算的说法正确的是（ ）。",[452,454,456,457],{"key":20,"text":453,"correct":26},"钢吊车梁工程量不包括制动梁、制动桁架工程量",{"key":24,"text":455,"correct":22},"钢管柱按设计图示尺寸以质量计算，加强环、内衬管并入钢管柱工程量内",{"key":28,"text":43,"correct":26},{"key":31,"text":45,"correct":26},{"id":459,"libraryId":5,"type":15,"typeLabel":16,"stem":460,"options":461,"answer":24,"analysis":33},906688,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于金属结构工程量计算，说法正确的是（ ）。",[462,463,464,465],{"key":20,"text":131,"correct":26},{"key":24,"text":133,"correct":22},{"key":28,"text":135,"correct":26},{"key":31,"text":137,"correct":26},{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":28,"analysis":33},906689,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854--2013，混凝土框架柱工程量应（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":26},"按设计图示尺寸扣除板厚所占部分以体积计算",{"key":24,"text":473,"correct":26},"区别不同截面以长度计算",{"key":28,"text":475,"correct":22},"按设计图示尺寸不扣除梁所占部分以体积计算",{"key":31,"text":477,"correct":26},"按柱基上表面至梁底面部分以体积计算",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":24,"analysis":33},906690,"根据《混凝土结构设计规范》GB 50010--2010，设计使用年限为50年的二b环境类别条件下，混凝土梁柱最外层钢筋保护层最小厚度应为（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"25mm",{"key":24,"text":485,"correct":22},"35mm",{"key":28,"text":487,"correct":26},"40mm",{"key":31,"text":489,"correct":26},"50mm",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":20,"analysis":33},906691,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854-2013规定，有关保温、隔热工程量计算，说法正确的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"与天棚相连的梁的保温工程量并人天棚工程量",{"key":24,"text":497,"correct":26},"与墙相连的柱的保温工程量按柱工程量计算",{"key":28,"text":499,"correct":26},"门窗洞口侧壁的保温工程量不计",{"key":31,"text":501,"correct":26},"梁保温工程量按设计图示尺寸以梁的中心线长度计算",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":28,"analysis":33},906692,"某管沟工程，设计管底垫层宽度为2.0m，开挖深度为2.0m，管径为1.2m，工作面宽为0.4m，管道中心线长为180m，管沟土方工程计量计算正确的为（ ）m3。",[506,508,510,512],{"key":20,"text":507,"correct":26},"432",{"key":24,"text":509,"correct":26},"576",{"key":28,"text":511,"correct":22},"720",{"key":31,"text":513,"correct":26},"1008",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},906693,"根据《房屋建筑与装饰工程量计量规范》GB50854-2013，关于土石方回填工程量计算，说法正确的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"回填土方项目特征应包括填方来源及运距",{"key":24,"text":521,"correct":26},"室内回填应扣除间隔墙所占体积",{"key":28,"text":523,"correct":26},"场地回填按设计回填尺寸以面积计算",{"key":31,"text":525,"correct":26},"基础回填不扣除基础垫层所占面积",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":31,"analysis":33},906694,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于现浇混凝土板的工程量计算正确的为（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":26},"栏板按设计图示尺寸以面积计算",{"key":24,"text":533,"correct":26},"雨篷按设计外墙中心线外图示体积计算",{"key":28,"text":535,"correct":26},"阳台板按设计外墙中心线外图示面积计算",{"key":31,"text":537,"correct":22},"散水按设计图示尺寸以面积计算",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},906695,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013规定，关于砖砌体工程量计算说法正确的为（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":26},"砖基础工程量中不含基础砂浆防潮层所占体积",{"key":24,"text":545,"correct":22},"使用同一种材料的基础与墙身以设计室内地面为分界",{"key":28,"text":547,"correct":26},"实心砖墙的工程量中不应计入凸出墙面的砖垛体积",{"key":31,"text":549,"correct":26},"坡屋面有屋架的外墙高由基础顶面算至屋架下弦底面",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},906696,"根据《房屋建筑与装饰工程工程量计算规范》GB50854-2013，天棚抹灰工程量计算正确的是（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":26},"带梁天棚、梁两侧抹灰面积不计算",{"key":24,"text":557,"correct":26},"板式楼梯底面抹灰按水平投影面积计算",{"key":28,"text":559,"correct":22},"锯齿形楼梯底板抹灰按展开面积计算",{"key":31,"text":561,"correct":26},"间壁墙、附墙柱所占面积应予扣除",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":28,"analysis":33},906697,"单层建筑物檐口高度超过（ ）m，可按超高部分的建筑面积计算超高施工增加。",[566,568,570,572],{"key":20,"text":567,"correct":26},"6",{"key":24,"text":569,"correct":26},"10",{"key":28,"text":571,"correct":22},"20",{"key":31,"text":573,"correct":26},"30",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":31,"analysis":33},906698,"在进行地基处理时，工程量计算既可用体积，又可用面积计算的是（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"换填垫层",{"key":24,"text":581,"correct":26},"铺设土工合成材料",{"key":28,"text":583,"correct":26},"振冲桩",{"key":31,"text":585,"correct":22},"褥垫层",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":20,"analysis":33},906699,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854-2013，地基处理工程量计算正确的是（ ）.",[590,592,594,596],{"key":20,"text":591,"correct":22},"换填垫层按设计图示尺寸以体积计算",{"key":24,"text":593,"correct":26},"强夯地基按设计图示处理范围乘以处理深度以体积计算",{"key":28,"text":595,"correct":26},"填料振冲桩以填料体积计算",{"key":31,"text":219,"correct":26},{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},906700,"根据《房屋建筑与装饰工程工程量计算规范》GB 50854-2013，打桩工程量计算正确的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":26},"打预制钢筋混凝土方桩，按设计图示尺寸桩长以米计算，送桩工程量另计",{"key":24,"text":604,"correct":22},"打预制钢筋混凝土管桩，按设计图示数量以根计算，截桩头工程量另计",{"key":28,"text":606,"correct":26},"钢管桩按设计图示截面积乘以桩长，以实体积计算",{"key":31,"text":608,"correct":26},"钢板桩按不同板幅以设计长度计算",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]