[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-22":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,22,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,234,246,258,270,282,294,306,318,330,342,352,364,376,388,400,408,420,432,442,454,466,478,490,502,514,526,538,550,562,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},906540,1,"单选题","关于地基夯实加固处理成功的经验是（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","沙土、杂填土和软黏土层适宜采用重锤夯实",false,{"key":24,"text":25,"correct":22},"B","地下水距地面0.8m以上的湿陷性黄土不宜采用重锤夯实",{"key":27,"text":28,"correct":22},"C","碎石土、砂土、粉土不宜采用强夯法",{"key":30,"text":31,"correct":32},"D","杂填土以及“围海造地”地基适宜采用强夯法",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},906541,"钢筋混凝土预制桩的运输和堆放应满足以下要求（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"混凝土强度达到设计强度的70%方可运输",{"key":24,"text":41,"correct":32},"混凝土强度达到设计强度的100%方可运输",{"key":27,"text":43,"correct":22},"堆放层数不宜超过10层",{"key":30,"text":45,"correct":22},"不同规格的桩按上小下大的原则堆放",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},906542,"跨度18m以内的钢柱拼装应采用（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":32},"构件平装法",{"key":24,"text":53,"correct":22},"构件立装法",{"key":27,"text":55,"correct":22},"利用模具拼装法",{"key":30,"text":57,"correct":22},"利用桁架拼装法",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},906543,"钢结构单层厂房，安装前（ ）是需要进行吊装稳定性验算的钢结构构件。",[62,64,66,68],{"key":20,"text":63,"correct":22},"钢柱",{"key":24,"text":65,"correct":32},"钢屋架",{"key":27,"text":67,"correct":22},"吊车梁",{"key":30,"text":69,"correct":22},"钢桁架",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":30,"analysis":33},906544,"电渗井点降水的井点管应（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"布置在地下水流上游侧",{"key":24,"text":77,"correct":22},"布置在地下水流下游侧",{"key":27,"text":79,"correct":22},"沿基坑中线布置",{"key":30,"text":81,"correct":32},"沿基坑外围布置",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":30,"analysis":33},906545,"地基处理常采用强夯法，其特点在于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"处理速度快、工期短，适用于城市施工",{"key":24,"text":89,"correct":22},"不适用于软黏土层处理",{"key":27,"text":91,"correct":22},"处理范围应小于建筑物基础范围",{"key":30,"text":93,"correct":32},"采取相应措施还可用于水下夯实",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},906546,"钢筋混凝土预制桩锤击沉桩法施工，通常采用（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"轻锤低击的打桩方式",{"key":24,"text":101,"correct":32},"重锤低击的打桩方式",{"key":27,"text":103,"correct":22},"先四周后中间的打桩顺序",{"key":30,"text":105,"correct":22},"先打短柱后打长桩",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":30,"analysis":33},906547,"混凝土冬季施工时，应注意（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"不宜采用普通硅酸盐水泥",{"key":24,"text":113,"correct":22},"适当增加水灰比",{"key":27,"text":115,"correct":22},"适当添加缓凝剂",{"key":30,"text":117,"correct":32},"采用非加热养护时，适当添加引气剂",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":27,"analysis":33},906548,"先张法预应力混凝土构件施工，其工艺流程为（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"支底模一支侧模一张拉钢筋一浇筑混凝土一养护、拆模一放张钢筋",{"key":24,"text":125,"correct":22},"支底模一张拉钢筋一支侧模一浇筑混凝土一放张钢筋一养护、拆模",{"key":27,"text":127,"correct":32},"支底模一预应力钢筋安放一张拉钢筋一支侧模一浇筑混凝土一拆模一放张钢筋",{"key":30,"text":129,"correct":22},"支底模一钢筋安放一支侧模一张拉钢筋一浇筑混凝土一放张钢筋一拆模",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},906549,"屋面防水工程应满足的要求是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":32},"结构找坡不应小于3%",{"key":24,"text":137,"correct":22},"找平层应留设间距不小于6m的分格缝",{"key":27,"text":139,"correct":22},"分格缝不宜与排气道贯通",{"key":30,"text":141,"correct":22},"涂膜防水层的无纺布，上下胎体搭接缝不应错开",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},906550,"对大面积二类土场地进行平整的主要施工机械应优先考虑（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"拉铲挖掘机",{"key":24,"text":149,"correct":32},"铲运机",{"key":27,"text":151,"correct":22},"正铲挖掘机",{"key":30,"text":153,"correct":22},"反铲挖掘机",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":24,"analysis":33},906551,"关于钢筋混凝土预制桩施工，说法正确的是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"基坑较大时，打桩宜从周边向中间进行",{"key":24,"text":161,"correct":32},"打桩宜采用重锤低击",{"key":27,"text":163,"correct":22},"钢筋混凝土预制桩堆放层数不超过2层",{"key":30,"text":165,"correct":22},"桩体混凝土强度达到设计强度的70%方可运输",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":24,"analysis":33},906552,"爆扩成孔灌注桩的主要优点在于（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"适于在软土中形成桩基础",{"key":24,"text":173,"correct":32},"扩大桩底支撑面",{"key":27,"text":175,"correct":22},"增大桩身周边土体的密实度",{"key":30,"text":177,"correct":22},"有效扩大桩柱直径",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":24,"analysis":33},906553,"混凝土小型空心砌块砌体工程中，施工采用的小砌块的产品龄期不应小于（ ）d，承重墙体使用的小砌块应完整、无破损、无裂缝。",[182,184,186,188],{"key":20,"text":183,"correct":22},"14",{"key":24,"text":185,"correct":32},"28",{"key":27,"text":187,"correct":22},"42",{"key":30,"text":189,"correct":22},"56",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":27,"analysis":33},906554,"湿度小的黏性土挖土深度小于3m时，可用（ ）",[194,196,198,200],{"key":20,"text":195,"correct":22},"悬臂式板式支护",{"key":24,"text":197,"correct":22},"垂直挡土板式支撑",{"key":27,"text":199,"correct":32},"间断式水平挡土板支撑",{"key":30,"text":201,"correct":22},"连续式水平挡土板支撑",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":24,"analysis":33},906555,"土石方工程施工中，铲运机采用8字形路线的作业条件是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"施工地形起伏不大、工作地段较长",{"key":24,"text":209,"correct":32},"施工地形起伏较大、工作地段较长",{"key":27,"text":211,"correct":22},"施工地形起伏较大、工作地段较短",{"key":30,"text":213,"correct":22},"施工地形起伏不大、工作地段较短",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},906558,"混凝土或抹灰基层涂刷水性涂料时，含水率不得大于（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":32},"8％",{"key":24,"text":221,"correct":22},"9％",{"key":27,"text":223,"correct":22},"10％",{"key":30,"text":225,"correct":22},"12％",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":27,"analysis":33},906559,"在松散潮湿的砂土中挖4m深的基槽，其支护方式不宜采用（ ）。",[230,231,232,233],{"key":20,"text":195,"correct":22},{"key":24,"text":197,"correct":22},{"key":27,"text":199,"correct":32},{"key":30,"text":201,"correct":22},{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":20,"analysis":33},906562,"桥梁上部结构采用移动模架逐孔施工，其主要特点为（ ）。",[238,240,242,244],{"key":20,"text":239,"correct":32},"节省劳力，上下部结构可以平行作业",{"key":24,"text":241,"correct":22},"地面支架体系复杂，技术要求高、",{"key":27,"text":243,"correct":22},"设备投资小，施工操作简单",{"key":30,"text":245,"correct":22},"施工工期相对较长",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},906563,"关于软土路基施工中稳定剂处置法施工，说法正确的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"该方法主要用于排出土体中的多余水分",{"key":24,"text":253,"correct":32},"该方法主要用于改善地基的压缩性和强度特性",{"key":27,"text":255,"correct":22},"压实后均不需要养护",{"key":30,"text":257,"correct":22},"稳定剂一般不用水泥作掺和料",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":20,"analysis":33},906564,"顶推法施工桥梁承载结构适用于（ ）。",[262,264,266,268],{"key":20,"text":263,"correct":32},"等截面梁",{"key":24,"text":265,"correct":22},"变截面梁",{"key":27,"text":267,"correct":22},"大跨径桥梁",{"key":30,"text":269,"correct":22},"总长1000m以上桥梁",{"id":271,"libraryId":5,"type":15,"typeLabel":16,"stem":272,"options":273,"answer":27,"analysis":33},906565,"路基开挖宜采用通道纵挖法的是（ ）。",[274,276,278,280],{"key":20,"text":275,"correct":22},"长度较小的路堑",{"key":24,"text":277,"correct":22},"深度较浅的路堑",{"key":27,"text":279,"correct":32},"两端地面纵坡较小的路堑",{"key":30,"text":281,"correct":22},"不宜采用机械开挖的路堑",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":24,"analysis":33},906566,"钢筋混凝土网涵施工工序中，（ ）是管位放样的上一步工作。",[286,288,290,292],{"key":20,"text":287,"correct":22},"抽水",{"key":24,"text":289,"correct":32},"除淤清基",{"key":27,"text":291,"correct":22},"基槽开挖",{"key":30,"text":293,"correct":22},"围堰",{"id":295,"libraryId":5,"type":15,"typeLabel":16,"stem":296,"options":297,"answer":24,"analysis":33},906567,"下面关于桥梁墩台施工的说法，正确的是（ ）。",[298,300,302,304],{"key":20,"text":299,"correct":22},"简易活动脚手架适用于25m以上的砌石墩台施工",{"key":24,"text":301,"correct":32},"当墩台高度超过30m时常用滑动模板施工",{"key":27,"text":303,"correct":22},"墩台混凝土适宜采用强度等级较高的普通水泥",{"key":30,"text":305,"correct":22},"6m以下的墩台可采用悬吊脚手架施工",{"id":307,"libraryId":5,"type":15,"typeLabel":16,"stem":308,"options":309,"answer":20,"analysis":33},906568,"桥梁承载结构施工方法中，投入施工设备和施工用钢量相对较少的是（ ）。",[310,312,314,316],{"key":20,"text":311,"correct":32},"转体施工法",{"key":24,"text":313,"correct":22},"顶推法",{"key":27,"text":315,"correct":22},"移动模架逐孔施工法",{"key":30,"text":317,"correct":22},"提升与浮运施工",{"id":319,"libraryId":5,"type":15,"typeLabel":16,"stem":320,"options":321,"answer":20,"analysis":33},906569,"石方爆破清方时，应考虑的因素是（ ）。",[322,324,326,328],{"key":20,"text":323,"correct":32},"根据爆破块度和岩堆大小选择运输机械",{"key":24,"text":325,"correct":22},"根据工地运输条件决定车辆数量",{"key":27,"text":327,"correct":22},"根据不同的装药形式选择挖掘机械",{"key":30,"text":329,"correct":22},"运距在300m以内优先选用推土机",{"id":331,"libraryId":5,"type":15,"typeLabel":16,"stem":332,"options":333,"answer":20,"analysis":33},906570,"石方爆破施工作业正确的顺序是（ ）。",[334,336,338,340],{"key":20,"text":335,"correct":32},"钻孔→装药→敷设起爆网络→起爆",{"key":24,"text":337,"correct":22},"钻孔→确定炮位→敷设起爆网络→装药→起爆",{"key":27,"text":339,"correct":22},"确定炮位→敷设起爆网络→钻孔→装药→起爆",{"key":30,"text":341,"correct":22},"设置警戒线→敷设起爆网络→确定炮位→装药→起爆",{"id":343,"libraryId":5,"type":15,"typeLabel":16,"stem":344,"options":345,"answer":20,"analysis":33},906571,"关于桥梁墩台施工的说法，正确的是（ ）。",[346,348,350,351],{"key":20,"text":347,"correct":32},"简易活动脚手架适宜于25m以下的砌石墩台施工",{"key":24,"text":349,"correct":22},"当墩台高度超过30m时宜采用固定模板施工",{"key":27,"text":303,"correct":22},{"key":30,"text":305,"correct":22},{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":24,"analysis":33},906572,"下列有关表层处理法中，砂垫层法施工的特点，表述错误的是（ ）。",[356,358,360,362],{"key":20,"text":357,"correct":22},"施工简便",{"key":24,"text":359,"correct":32},"占地较大",{"key":27,"text":361,"correct":22},"需放慢填筑速度",{"key":30,"text":363,"correct":22},"不需要特殊机具设备",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":24,"analysis":33},906573,"下列土类中宜选作路堤填料的是（ ）。",[368,370,372,374],{"key":20,"text":369,"correct":22},"粉性土",{"key":24,"text":371,"correct":32},"亚砂土",{"key":27,"text":373,"correct":22},"重黏土",{"key":30,"text":375,"correct":22},"植物土",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":24,"analysis":33},906574,"下列各项光轮压路机中不属于中型压路机的是（ ）t。",[380,382,384,386],{"key":20,"text":381,"correct":22},"8",{"key":24,"text":383,"correct":32},"6",{"key":27,"text":385,"correct":22},"10",{"key":30,"text":387,"correct":22},"11",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":30,"analysis":33},906575,"路基石方开挖，适用于土石方大量集中、地势险要或工期紧迫的路段，以及一些特殊的爆破工程的装药形式为（ ）。",[392,394,396,398],{"key":20,"text":393,"correct":22},"集中药包",{"key":24,"text":395,"correct":22},"分散药包",{"key":27,"text":397,"correct":22},"药壶药包",{"key":30,"text":399,"correct":32},"坑道药包",{"id":401,"libraryId":5,"type":15,"typeLabel":16,"stem":402,"options":403,"answer":24,"analysis":33},906576,"路基石方开挖，在高作业面施工时为保证爆破岩石块度均匀，常采用的装药形式为（ ）。",[404,405,406,407],{"key":20,"text":393,"correct":22},{"key":24,"text":395,"correct":32},{"key":27,"text":397,"correct":22},{"key":30,"text":399,"correct":22},{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":20,"analysis":33},906577,"在填石路堤施工的填筑方法中，主要用于二级及二级以下公路，施工路基压实、稳定问题较多的方法是（ ）。",[412,414,416,418],{"key":20,"text":413,"correct":32},"竖向填筑法",{"key":24,"text":415,"correct":22},"分层压实法",{"key":27,"text":417,"correct":22},"冲进压实法",{"key":30,"text":419,"correct":22},"强力夯实法",{"id":421,"libraryId":5,"type":15,"typeLabel":16,"stem":422,"options":423,"answer":24,"analysis":33},906578,"在大跨径连续桥梁施工中，施工简单且不影响通航或桥下运输的方法是（ ）。",[424,426,428,430],{"key":20,"text":425,"correct":22},"支架现浇法",{"key":24,"text":427,"correct":32},"悬臂施工法",{"key":27,"text":429,"correct":22},"预制安装法",{"key":30,"text":431,"correct":22},"顶推施工法",{"id":433,"libraryId":5,"type":15,"typeLabel":16,"stem":434,"options":435,"answer":24,"analysis":33},906579,"移动模架逐孔施工桥梁上部结构，其主要特点为（ ）。",[436,438,440,441],{"key":20,"text":437,"correct":22},"地面支架体系复杂，技术要求高",{"key":24,"text":439,"correct":32},"上下部结构可以平行作业",{"key":27,"text":243,"correct":22},{"key":30,"text":245,"correct":22},{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":30,"analysis":33},906580,"石灰稳定土路拌法施工工艺流程（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"准备下承层→施工放样→洒水闷料→粉碎土或运送、摊铺集料→整平和轻压→摆放和摊铺石灰→加水并湿拌→拌和→整型→碾压→接缝处理→养生",{"key":24,"text":449,"correct":22},"准备下承层→施工放样→粉碎土或运送、摊铺集料→整平和轻压→洒水闷料→摆放和摊铺石灰→拌和→整型→加水并湿拌→接缝处理→碾压→养生",{"key":27,"text":451,"correct":22},"准备下承层→施工放样→洒水闷料→粉碎土或运送、摊铺集料→整平和轻压→拌和→摆放和摊铺石灰→加水并湿拌→碾压→整型→接缝处理→养生",{"key":30,"text":453,"correct":32},"准备下承层→施工放样→粉碎土或运送、摊铺集料→洒水闷料→整平和轻压→摆放和摊铺石灰→拌和→加水并湿拌→整型→碾压→接缝处理→养生",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":30,"analysis":33},906581,"用于正常通车线路上的桥梁工程的换梁方法是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"顶推法施工",{"key":24,"text":461,"correct":22},"转体法施工",{"key":27,"text":463,"correct":22},"悬臂法施工",{"key":30,"text":465,"correct":32},"横移法施工",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":20,"analysis":33},906582,"填筑路堤前是否需要进行基底处理不取决于（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":32},"填料土体性质",{"key":24,"text":473,"correct":22},"基底土层松实",{"key":27,"text":475,"correct":22},"填方高度大小",{"key":30,"text":477,"correct":22},"地面横坡陡缓",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":30,"analysis":33},906583,"大跨径连续梁通常采用的安装方法是（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":22},"支架施工",{"key":24,"text":485,"correct":22},"无支架施工",{"key":27,"text":487,"correct":22},"转体施工",{"key":30,"text":489,"correct":32},"悬臂施工",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":30,"analysis":33},906584,"导向钻进法施工的特点是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"斜面钻头只给进不旋转保直钻进",{"key":24,"text":497,"correct":22},"斜面钻头只旋转不给进保直钻进",{"key":27,"text":499,"correct":22},"斜面钻头同时给进加旋转实现造斜",{"key":30,"text":501,"correct":32},"斜面钻头只给进不旋转实现造斜",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":27,"analysis":33},906585,"在深基坑支护中，下列（ ）支护类型能满足所有基坑结构的安全等级。",[506,508,510,512],{"key":20,"text":507,"correct":22},"逆作挡墙式",{"key":24,"text":509,"correct":22},"边坡稳定式",{"key":27,"text":511,"correct":32},"排桩与板墙式",{"key":30,"text":513,"correct":22},"放坡开挖式",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":20,"analysis":33},906586,"TBM法的几种不同施工机械类型中，全断面掘进机的主要优点是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":32},"适宜于打长洞",{"key":24,"text":521,"correct":22},"适宜于开挖软岩",{"key":27,"text":523,"correct":22},"适宜于开挖竖井或斜井",{"key":30,"text":525,"correct":22},"适宜于围岩是软弱破碎带情况",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":30,"analysis":33},906587,"盖挖半逆作法及类似逆作法的区别在于（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"构筑中间支撑柱及覆盖板过程",{"key":24,"text":533,"correct":22},"开挖及支撑安装过程",{"key":27,"text":535,"correct":22},"构筑侧墙、柱及楼板过程",{"key":30,"text":537,"correct":32},"顶板完成及恢复路面过程",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":20,"analysis":33},906588,"型钢水泥复合搅拌桩支护技术施工工艺流程（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":32},"消除地下障碍物、平整场地→开挖导沟→置放导轨与定位卡→SMW搅拌桩机就位→钻进与搅拌→插入型钢并固定→撇除导轨→施工顶圈梁→支护施工完毕",{"key":24,"text":545,"correct":22},"消除地下障碍物、平整场地→开挖导沟→SMW搅拌桩机就位→置放导轨与定位卡→钻进与搅拌→撇除导轨→插入型钢并固定→施工顶圈梁→支护施工完毕",{"key":27,"text":547,"correct":22},"消除地下障碍物、平整场地→置放导轨与定位卡→开挖导沟→SMW搅拌桩机就位→钻进与搅拌→插入型钢并固定→施工顶圈梁→撇除导轨→支护施工完毕",{"key":30,"text":549,"correct":22},"消除地下障碍物、平整场地→开挖导沟→施工顶圈梁→SMW搅拌桩机就位→钻进与搅拌→置放导轨与定位卡→插入型钢并固定→撇除导轨→支护施工完毕",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":27,"analysis":33},906589,"地下连续墙施工工艺流程（ ）。",[554,556,558,560],{"key":20,"text":555,"correct":22},"挖导沟→筑导墙→挖槽→吊放接头管（接头箱）→吸泥、清底、刷壁→吊放钢筋笼→浇筑混凝土→插入混凝土导管→结束",{"key":24,"text":557,"correct":22},"挖导沟→吸泥、清底、刷壁→筑导墙→挖槽→吊放钢筋笼→吊放接头管（接头箱）→插入混凝土导管→浇筑混凝土→结束",{"key":27,"text":559,"correct":32},"挖导沟→筑导墙→挖槽→吸泥、清底、刷壁→吊放接头管（接头箱）→吊放钢筋笼→插入混凝土导管→浇筑混凝土一结束",{"key":30,"text":561,"correct":22},"筑导墙→挖导沟→挖槽→吸泥、清底、刷壁→浇筑混凝土→吊放接头管（接头箱）→吊放钢筋笼→插入混凝土导管一结束",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":27,"analysis":33},906590,"泥浆护壁所需要的泥浆，在制备时，一般情况下泥浆搅拌后应静置（ ）h后使用。",[566,567,569,571],{"key":20,"text":381,"correct":22},{"key":24,"text":568,"correct":22},"12",{"key":27,"text":570,"correct":32},"24",{"key":30,"text":572,"correct":22},"48",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":30,"analysis":33},906591,"地面开阔，周围建筑物稀少，地质条件好，土质稳定且在基坑周围无较大荷载，对基坑周围的位移和沉降无严格要求的情况适用（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"TBM法",{"key":24,"text":580,"correct":22},"带盾构的TBM法",{"key":27,"text":582,"correct":22},"有围护结构的明挖",{"key":30,"text":584,"correct":32},"无围护结构的明挖",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":20,"analysis":33},906592,"地下工程的早强水泥砂浆锚杆用树脂药包的，正常温度下需要搅拌的时间为（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":32},"30s",{"key":24,"text":592,"correct":22},"45～60s",{"key":27,"text":594,"correct":22},"3min",{"key":30,"text":596,"correct":22},"5min",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":24,"analysis":33},906593,"关于浅埋暗挖法的适用条件，说法错误的是（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":22},"浅埋暗挖法不允许带水作业",{"key":24,"text":604,"correct":32},"大范围的粉细砂地层可以采用浅埋暗挖法",{"key":27,"text":606,"correct":22},"采用浅埋暗挖法要求开挖面具有一定的自立性和稳定性",{"key":30,"text":608,"correct":22},"浅埋暗挖法的前提需要对开挖面前方地层预加固和预处理",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]