[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-21":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":607},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,21,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,210,222,234,246,258,269,281,289,301,313,323,335,347,359,371,383,395,407,419,431,443,453,465,477,489,501,513,525,537,549,561,573,585,595],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},906490,1,"单选题","下列关于钻孔压浆桩的施工要点描述不正确的是（ ）。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","能在冬季严寒气候条件下施工",false,{"key":24,"text":25,"correct":22},"B","钻进过程中，应及时清理孔口周围积土",{"key":27,"text":28,"correct":29},"C","一般情况下冬季施工成桩时混凝土温度不应低于-20℃",true,{"key":31,"text":32,"correct":22},"D","制备浆液用的水泥宜采用强度等级不低于32．5的硅酸盐水泥","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":20,"analysis":33},906491,"下列关于先张法预应力施工说法错误的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":29},"锚具作为预应力构件的一个组成部分，不能重复使用",{"key":24,"text":41,"correct":22},"重叠法生产构件时，下层构件的混凝土强度达到5MPa后方可浇筑上层构件的混凝土",{"key":27,"text":43,"correct":22},"混凝土可采用自然养护或湿热养护",{"key":31,"text":45,"correct":22},"预应力筋放张时不应低于30MPa",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},906492,"下列关于钢结构单层厂房的描述错误的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"一般钢柱吊装时通常采用一点起吊",{"key":24,"text":53,"correct":22},"钢吊车梁均为简支梁",{"key":27,"text":55,"correct":22},"钢桁架多用悬空吊装",{"key":31,"text":57,"correct":29},"钢屋架侧向刚度好",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":31,"analysis":33},906493,"下列对于水泥砂浆施工应注意的情况描述错误的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"水泥砂浆的配制，应按所掺材料的技术要求准确计量",{"key":24,"text":65,"correct":22},"防水层各层应紧密粘合，每层宜连续施工",{"key":27,"text":67,"correct":22},"水泥砂浆终凝后应及时进行养护，养护温度不宜低于5℃",{"key":31,"text":69,"correct":29},"掺外加剂、掺合料等的水泥砂浆防水层厚度宜为10～12mm",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":24,"analysis":33},906494,"下列不属于水泥砂浆防水层施工特点的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"取材容易，施工方便",{"key":24,"text":77,"correct":29},"抵抗变形能力强",{"key":27,"text":79,"correct":22},"防水效果好",{"key":31,"text":81,"correct":22},"成本较低",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},906495,"屋面防水工程中，混凝土结构层宜采用结构找坡，坡度不应小于（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"2％",{"key":24,"text":89,"correct":29},"3％",{"key":27,"text":91,"correct":22},"4％",{"key":31,"text":93,"correct":22},"5％",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":31,"analysis":33},906496,"为了提高铲运机的生产率，适宜采用的铲运方法为（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"上坡铲土",{"key":24,"text":101,"correct":22},"并列铲土",{"key":27,"text":103,"correct":22},"斜向铲土",{"key":31,"text":105,"correct":29},"助铲法",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":27,"analysis":33},906497,"为便于直接观察井点抽水状况，南方地区可用（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"钢塑管",{"key":24,"text":113,"correct":22},"PVC-U管",{"key":27,"text":115,"correct":29},"塑料软管",{"key":31,"text":117,"correct":22},"橡胶软管",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},906498,"推土机施工时，可使铲刀的推送数量增大，缩短运输时间，提高生产效率12％～18％的是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"沟槽推土法",{"key":24,"text":125,"correct":22},"斜角推土法",{"key":27,"text":127,"correct":22},"下坡推土法",{"key":31,"text":129,"correct":29},"分批集中，一次推送法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":31,"analysis":33},906499,"推土机的经济运距在100m以内，以（ ）m为最佳运距。",[134,136,138,140],{"key":20,"text":135,"correct":22},"20～40",{"key":24,"text":137,"correct":22},"20～50",{"key":27,"text":139,"correct":22},"30～50",{"key":31,"text":141,"correct":29},"30～60",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":27,"analysis":33},906500,"涂膜防水时，防水层必须翻至墙面并做到离地面（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"100mm",{"key":24,"text":149,"correct":22},"1m",{"key":27,"text":151,"correct":29},"150mm",{"key":31,"text":153,"correct":22},"1．5m",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":31,"analysis":33},906501,"通常情况下，基坑土方开挖的明排水法主要适用于（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"细砂土层",{"key":24,"text":161,"correct":22},"粉砂土层",{"key":27,"text":163,"correct":22},"淤泥土层",{"key":31,"text":165,"correct":29},"渗水量小的黏土层",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},906502,"水泥砂浆终凝后应及时进行养护，养护温度不宜低于（ ）℃，养护时间不得少于（ ）d。",[170,172,174,176],{"key":20,"text":171,"correct":29},"5，14",{"key":24,"text":173,"correct":22},"10，14",{"key":27,"text":175,"correct":22},"5．28",{"key":31,"text":177,"correct":22},"10．28",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":20,"analysis":33},906503,"适用于振捣基础、柱、梁、墙等深度或厚度较大的结构构件的振捣机械是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":29},"内部振动器",{"key":24,"text":185,"correct":22},"表面振动器",{"key":27,"text":187,"correct":22},"附着式振动器",{"key":31,"text":189,"correct":22},"振动台",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},906504,"轻质隔墙工程，安装竖向龙骨应垂直，龙骨间距应符合设计要求，潮湿房间和钢板网抹灰墙，龙骨间距不宜大于（ ）mm。",[194,196,198,200],{"key":20,"text":195,"correct":22},"100",{"key":24,"text":197,"correct":22},"200",{"key":27,"text":199,"correct":22},"300",{"key":31,"text":201,"correct":29},"400",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":27,"analysis":33},906505,"轻型井点施工，冲孔孔径不应小于（ ）mm，并保持垂直，上下一致，使滤管有一定厚度的砂滤层。",[206,207,208,209],{"key":20,"text":195,"correct":22},{"key":24,"text":197,"correct":22},{"key":27,"text":199,"correct":29},{"key":31,"text":201,"correct":22},{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},906506,"砌体水平灰缝的砂浆饱满度，按净面积不能低于（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"70％",{"key":24,"text":217,"correct":22},"75％",{"key":27,"text":219,"correct":22},"80％",{"key":31,"text":221,"correct":29},"90％",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":20,"analysis":33},906507,"目前多用于钢网架结构的吊装方法是（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":29},"大跨度结构高空拼装法施工",{"key":24,"text":229,"correct":22},"大跨度结构整体吊装法施工",{"key":27,"text":231,"correct":22},"大跨度结构整体顶升法施工",{"key":31,"text":233,"correct":22},"大跨度结构滑移法施工",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":27,"analysis":33},906508,"地下室底层和上部结构首层柱、墙混凝土带模的自然养护时间不宜少于（ ）d。",[238,240,242,244],{"key":20,"text":239,"correct":22},"7",{"key":24,"text":241,"correct":22},"14",{"key":27,"text":243,"correct":29},"3",{"key":31,"text":245,"correct":22},"28",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":27,"analysis":33},906509,"地下水位以下或含水量超过（ ）的土，不宜采用土桩或灰土桩。",[250,252,254,256],{"key":20,"text":251,"correct":22},"15％",{"key":24,"text":253,"correct":22},"20％",{"key":27,"text":255,"correct":29},"25％",{"key":31,"text":257,"correct":22},"30％",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":260,"options":261,"answer":24,"analysis":33},906510,"对跨度不小于（ ）m的钢筋混凝土梁、板，其模板应要求起拱。",[262,263,265,267],{"key":20,"text":243,"correct":22},{"key":24,"text":264,"correct":29},"4",{"key":27,"text":266,"correct":22},"5",{"key":31,"text":268,"correct":22},"6",{"id":270,"libraryId":5,"type":15,"typeLabel":16,"stem":271,"options":272,"answer":27,"analysis":33},906511,"对有抗震设防要求的结构，其纵向受力钢筋的抗拉强度实测值与屈服强度实测值的比值不应小于（ ）。",[273,275,277,279],{"key":20,"text":274,"correct":22},"1．15",{"key":24,"text":276,"correct":22},"1．20",{"key":27,"text":278,"correct":29},"1．25",{"key":31,"text":280,"correct":22},"1．30",{"id":282,"libraryId":5,"type":15,"typeLabel":16,"stem":283,"options":284,"answer":24,"analysis":33},906512,"对于大跨度的焊接球节点钢管网架的吊装，出于防火等考虑，一般选用（ ）。",[285,286,287,288],{"key":20,"text":227,"correct":22},{"key":24,"text":229,"correct":29},{"key":27,"text":231,"correct":22},{"key":31,"text":233,"correct":22},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":31,"analysis":33},906513,"钢管桩常分别由一根上节桩，一根下节桩和若干根中节桩组合而成，每节的长度一般为（ ）m。",[293,295,297,299],{"key":20,"text":294,"correct":22},"10或12",{"key":24,"text":296,"correct":22},"11或13",{"key":27,"text":298,"correct":22},"12或14",{"key":31,"text":300,"correct":29},"13或15",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":24,"analysis":33},906514,"钢结构涂装施工顺序的描述，不正确的是（ ）。",[305,307,309,311],{"key":20,"text":306,"correct":22},"先左后右",{"key":24,"text":308,"correct":29},"先下后上",{"key":27,"text":310,"correct":22},"先里后外",{"key":31,"text":312,"correct":22},"先难后易",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},906515,"钢筋混凝土预制桩应在混凝土达到设计强度的（ ）方可起吊。",[317,318,320,321],{"key":20,"text":257,"correct":22},{"key":24,"text":319,"correct":22},"60％",{"key":27,"text":215,"correct":29},{"key":31,"text":322,"correct":22},"100％",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":27,"analysis":33},906516,"关于钢筋混凝土预制桩加工制作，说法正确的是（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"长度在10m以上的桩必须工厂预制",{"key":24,"text":330,"correct":22},"重叠法预制不宜超过6层",{"key":27,"text":332,"correct":29},"桩的强度达到设计强度的100％方可运输和打桩",{"key":31,"text":334,"correct":22},"重叠法预制下层桩强度达到设计强度70％时方可灌注上层桩",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":24,"analysis":33},906517,"灌注桩后压浆正确的施工工艺流程是（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":22},"准备工作→灌注桩施工→施工桩检测→拌制水泥浆液→压注水泥浆液",{"key":24,"text":342,"correct":29},"准备工作→灌注桩施工→拌制水泥浆液→压注水泥浆液→桩检测",{"key":27,"text":344,"correct":22},"准备工作→拌制水泥浆液→灌注桩施工→压注水泥浆液→桩检测",{"key":31,"text":346,"correct":22},"准备工作→灌注桩施工→拌制水泥浆液→桩检测→压注水泥浆液",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":20,"analysis":33},906518,"灰土地基适用于加固深（ ）m厚的软弱土、湿陷性黄土、杂填土等，还可用作结构的辅助防渗层。",[351,353,355,357],{"key":20,"text":352,"correct":29},"1～4",{"key":24,"text":354,"correct":22},"3～5",{"key":27,"text":356,"correct":22},"4～6",{"key":31,"text":358,"correct":22},"2～6",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":20,"analysis":33},906519,"混凝土或抹灰基层涂刷溶剂型涂料时，含水率不得大于（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":29},"8％",{"key":24,"text":366,"correct":22},"9％",{"key":27,"text":368,"correct":22},"10％",{"key":31,"text":370,"correct":22},"12％",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},906520,"基底标高不同时，砌体结构施工应（ ）。",[375,377,379,381],{"key":20,"text":376,"correct":22},"从短边砌起，并从低处向高处搭砌",{"key":24,"text":378,"correct":29},"从低处砌起，并从高处向低处搭砌",{"key":27,"text":380,"correct":22},"从长边砌起。并从高处向低处搭砌",{"key":31,"text":382,"correct":22},"从高处砌起，并从高处向低处搭砌",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":20,"analysis":33},906521,"跨度18m的钢屋架拼装应采用（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":29},"构件平装法",{"key":24,"text":390,"correct":22},"构件立装法",{"key":27,"text":392,"correct":22},"利用模具拼装法",{"key":31,"text":394,"correct":22},"利用桁架拼装法",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":27,"analysis":33},906522,"履带式起重机的主要参数不包括（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"起重量",{"key":24,"text":402,"correct":22},"起重高度",{"key":27,"text":404,"correct":29},"起重时间",{"key":31,"text":406,"correct":22},"起重半径",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":31,"analysis":33},906523,"模板类型较多，适用于现场浇筑高层筒仓的模板是（ ）。",[411,413,415,417],{"key":20,"text":412,"correct":22},"组合模板",{"key":24,"text":414,"correct":22},"大模板",{"key":27,"text":416,"correct":22},"台模",{"key":31,"text":418,"correct":29},"滑升模板",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":31,"analysis":33},906524,"某厂房平面宽度为70m，外搭脚手架宽度为3m，采用轨距为2．6m塔式起重机施工。塔式起重机为双侧布置，其最大起重半径不得小于（ ）m。",[423,425,427,429],{"key":20,"text":424,"correct":22},"74．3",{"key":24,"text":426,"correct":22},"74．8",{"key":27,"text":428,"correct":22},"39．3",{"key":31,"text":430,"correct":29},"39．8",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":27,"analysis":33},906525,"某大型基坑，施工场地标高为±0．000m，基坑底面标高为-6．600m，地下水位标高为-2．500m，土的渗透系数为60m／d，则应选用的降水方式是（ ）。",[435,437,439,441],{"key":20,"text":436,"correct":22},"一级轻型井点",{"key":24,"text":438,"correct":22},"喷射井点",{"key":27,"text":440,"correct":29},"管井井点",{"key":31,"text":442,"correct":22},"深井井点",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},906526,"砌筑工程中，当现场拌制水泥砂浆时，若施工期间最高温度超过30℃时，应在（ ）h内使用完毕。",[447,449,451,452],{"key":20,"text":448,"correct":22},"1",{"key":24,"text":450,"correct":29},"2",{"key":27,"text":243,"correct":22},{"key":31,"text":266,"correct":22},{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},906527,"相对其他施工方法，板柱框架结构的楼板采用升板法施工的特点是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"节约模板，造价较低",{"key":24,"text":460,"correct":22},"机械化程度高，造价较低",{"key":27,"text":462,"correct":22},"使用大型机械，适宜宽阔施工场地",{"key":31,"text":464,"correct":29},"用钢量大，造价偏高",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":24,"analysis":33},906528,"加气混凝土块和板的底层抹灰时，一般宜选用（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"水泥砂浆",{"key":24,"text":472,"correct":29},"混合砂浆",{"key":27,"text":474,"correct":22},"麻刀石灰砂浆",{"key":31,"text":476,"correct":22},"纸筋石灰浆",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},906529,"关于推土机施工作业，说法正确的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"土质较软使切土深度较大时可采用分批集中后一次推送",{"key":24,"text":484,"correct":29},"并列推土的推土机数量不宜超过4台",{"key":27,"text":486,"correct":22},"沟槽推土法是先用小型推土机推出两侧沟槽后再用大型推土机推土",{"key":31,"text":488,"correct":22},"斜角推土法是指推土机行走路线沿斜向交叉推进",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":27,"analysis":33},906530,"关于单斗挖掘机作业特点，说法正确的是（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":22},"正铲挖掘机.前进向下，自重切土",{"key":24,"text":496,"correct":22},"反铲挖掘机.后退向上，强制切土",{"key":27,"text":498,"correct":29},"拉铲挖掘机.后退向下，自重切土",{"key":31,"text":500,"correct":22},"抓铲挖掘机.前进向上，强制切土",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":31,"analysis":33},906531,"在砂性土中施工直径2.5m的高压喷射注浆桩，应采用（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"单管法",{"key":24,"text":508,"correct":22},"二重管法",{"key":27,"text":510,"correct":22},"三重管法",{"key":31,"text":512,"correct":29},"多重管法",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":24,"analysis":33},906532,"在砂土地层中施工泥浆护壁成孔灌注桩，桩径1.8m，桩长52m，应优先考虑采用（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"正循环钻孔灌注桩",{"key":24,"text":520,"correct":29},"反循环钻孔灌注桩",{"key":27,"text":522,"correct":22},"钻孔扩底灌注桩",{"key":31,"text":524,"correct":22},"冲击成孔灌注桩",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":24,"analysis":33},906533,"采用锤击法打预制钢筋混凝土桩，方法正确的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"桩重大于2t时，不宜采用“重锤低击”施工",{"key":24,"text":532,"correct":29},"桩重小于2t时，可采用1.5~2倍桩重的桩锤",{"key":27,"text":534,"correct":22},"桩重大于2t时，可采用桩重2倍以上的桩锤",{"key":31,"text":536,"correct":22},"桩重小于2t时，可采用“轻锤高击”施工",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":24,"analysis":33},906534,"打桩机正确的打桩顺序为（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":22},"先外后内",{"key":24,"text":544,"correct":29},"先大后小",{"key":27,"text":546,"correct":22},"先短后长",{"key":31,"text":548,"correct":22},"先浅后深",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":20,"analysis":33},906535,"静力压桩正确的施工工艺流程是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":29},"定位→吊桩→对中→压桩→接桩→压桩→送桩→切割桩头",{"key":24,"text":556,"correct":22},"吊桩→定位→对中→压桩→送桩→压桩→接桩→切割桩头",{"key":27,"text":558,"correct":22},"对中→吊桩→插桩→送桩→静压→接桩→压桩→切割桩头",{"key":31,"text":560,"correct":22},"吊桩→定位→压桩→送桩→接桩→压桩→切割桩头",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":24,"analysis":33},906536,"整体式结构中，预制构件的混凝土强度等级不宜低于（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":22},"C25",{"key":24,"text":568,"correct":29},"C30",{"key":27,"text":570,"correct":22},"C35",{"key":31,"text":572,"correct":22},"C40",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":24,"analysis":33},906537,"关于预应力后张法的施工工艺，下列说法正确的是（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"灌浆孔的间距，对预埋金属螺旋管不宜大于40m",{"key":24,"text":580,"correct":29},"张拉预应力筋时，设计无规定的，构件混凝土的强度不低于设计强度等级的75%",{"key":27,"text":582,"correct":22},"对后张法预应力梁，张拉时现浇结构混凝土的龄期不宜小于5d",{"key":31,"text":584,"correct":22},"孔道灌浆所用水泥浆拌和后至灌浆完毕的时间不宜超过35min",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":31,"analysis":33},906538,"可降低水位30-40m，有的甚至可达百米以上的降水形式为（ ）。",[589,591,593,594],{"key":20,"text":590,"correct":22},"轻型井点",{"key":24,"text":592,"correct":22},"电渗井点",{"key":27,"text":438,"correct":22},{"key":31,"text":442,"correct":29},{"id":596,"libraryId":5,"type":15,"typeLabel":16,"stem":597,"options":598,"answer":31,"analysis":33},906539,"单斗抓铲挖掘机的作业特点是（ ）。",[599,601,603,605],{"key":20,"text":600,"correct":22},"前进向下，自重切土",{"key":24,"text":602,"correct":22},"后退向下，自重切土",{"key":27,"text":604,"correct":22},"后退向下，强制切土",{"key":31,"text":606,"correct":29},"直上直下，自重切土",[608,611,614,617,620,623],{"id":15,"name":609,"category":7,"favorite":610},"领导干部任职前廉政法规知识测试题",92,{"id":612,"name":613,"category":7,"favorite":15},595,"建筑结构与设备",{"id":615,"name":616,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":618,"name":619,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":621,"name":622,"category":7,"favorite":8},534,"BIM工程师",{"id":624,"name":622,"category":7,"favorite":8},535]