[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-20":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":601},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,20,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,222,233,245,257,267,279,291,303,312,324,332,344,356,368,380,392,404,414,426,438,450,462,473,485,497,509,521,533,545,557,569,577,589],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},906439,1,"单选题","薄型防火涂料通常为膨胀型的，厚度为（ ）mm。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","大于1且小于3",false,{"key":24,"text":25,"correct":26},"B","大于3且小于7",true,{"key":28,"text":29,"correct":22},"C","大于7且小于15",{"key":31,"text":32,"correct":22},"D","大于15且小于45","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},906440,"某基坑为Ⅱ级砂土，地下水位较高，挖土深度为3m，且只能开挖停机面以下土层，适宜选择（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"正铲挖掘机",{"key":24,"text":41,"correct":26},"反铲挖掘机",{"key":28,"text":43,"correct":22},"拉铲挖掘机",{"key":31,"text":45,"correct":22},"抓铲挖掘机",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":31,"analysis":33},906441,"有一公路，路基为填土路基（路堤），土源为3km外的地面存土，完成这一土方作业较适合的机械选择为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":22},"铲运机",{"key":24,"text":53,"correct":22},"推土机",{"key":28,"text":55,"correct":22},"反铲挖掘机+推土机",{"key":31,"text":57,"correct":26},"正铲挖掘机+自卸汽车+推土机",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},906442,"泥浆护壁成孔灌注桩施工流程（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":22},"测量放线定位→桩机就位→埋设护筒→成孔→一次清孔→安装导管→安装钢筋笼→二次清孔→灌注水下混凝土→起拔导管、护筒→桩头混凝土养护",{"key":24,"text":65,"correct":22},"测量放线定位→埋设护筒→桩机就位→成孔→安装钢筋笼→一次清孔→安装导管→二次清孔→起拔导管、护筒→灌注水下混凝土→桩头混凝土养护",{"key":28,"text":67,"correct":26},"测量放线定位→埋设护筒→桩机就位→成孔→一次清孔→安装钢筋笼→安装导管→二次清孔→灌注水下混凝土→起拔导管、护筒→桩头混凝土养护",{"key":31,"text":69,"correct":22},"测量放线定位→埋设护筒→桩机就位→成孔→一次清孔→安装钢筋笼→安装导管→灌注水下混凝土→二次清孔→桩头混凝土养护→起拔导管、护筒",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":20,"analysis":33},906443,"在钢结构施工中，采用焊接的结构应保证（ ）材料的极限含量。",[74,76,78,80],{"key":20,"text":75,"correct":26},"碳",{"key":24,"text":77,"correct":22},"硅",{"key":28,"text":79,"correct":22},"锰",{"key":31,"text":81,"correct":22},"硫",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},906444,"后张法工艺流程（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"安装底模→埋管制孔→安钢筋骨架、支模→浇筑混凝土→养护、拆模→抽管→清理孔道→穿筋→张拉预应力筋→孔道灌浆→起吊运输",{"key":24,"text":89,"correct":26},"安装底模→安钢筋骨架、支模→埋管制孔→浇筑混凝土→抽管→养护、拆模→清理孔道→穿筋→张拉预应力筋→孔道灌浆→起吊运输",{"key":28,"text":91,"correct":22},"安钢筋骨架、支模→安装底模→埋管制孔→浇筑混凝土→抽管→养护、拆模→清理孔道→穿筋→孔道灌浆→张拉预应力筋→起吊运输",{"key":31,"text":93,"correct":22},"安装底模→安钢筋骨架、支模→浇筑混凝土→埋管制孔→抽管→养护、拆模→穿筋→清理孔道→张拉预应力筋→孔道灌浆→起吊运输",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},906445,"轻型钢结构制作流程（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"材料检验、堆放、矫正→号料→切割→矫正→成型、加工、制孔→装配→焊接→后处理→总体试验→除锈→油漆包装→库存→出厂",{"key":24,"text":101,"correct":22},"材料检验、堆放、矫正→号料→切割→成型、加工、制孔→装配→矫正→后处理→焊接→总体试验→油漆包装→除锈→库存→出厂",{"key":28,"text":103,"correct":22},"号料→材料检验、堆放、矫正→切割→矫正→成型、加工、制孔→装配→焊接→总体试验→后处理→除锈→油漆包装→库存→出厂",{"key":31,"text":105,"correct":22},"材料检验、堆放、矫正→切割→号料→矫正→成型、加工、制孔→装配→焊接→后处理→总体试验→除锈→油漆包装→出厂→库存",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":31,"analysis":33},906446,"欲加工滚制圆筒形的钢构件，可采用的加工方法是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"压弯",{"key":24,"text":113,"correct":22},"拉弯",{"key":28,"text":115,"correct":22},"热弯",{"key":31,"text":117,"correct":26},"滚弯",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},906447,"在钢结构构件连接中，（ ）连接时必须进行钢板的搭接，费钢、费工，现在已基本不用。",[122,124,126,128],{"key":20,"text":123,"correct":22},"气焊",{"key":24,"text":125,"correct":22},"接触焊",{"key":28,"text":127,"correct":22},"螺栓连接",{"key":31,"text":129,"correct":26},"铆接",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":20,"analysis":33},906448,"某跨度为20m的钢屋架进行拼装时，可以采取的拼装方法是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":26},"构件平装法",{"key":24,"text":137,"correct":22},"构件立拼法",{"key":28,"text":139,"correct":22},"构件吊装法",{"key":31,"text":141,"correct":22},"利用模具拼装法",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":24,"analysis":33},906449,"在多层及高层、高耸钢结构安装中，宜划分多个流水作业段进行安装，每节流水段内柱的分节位置宜在梁顶标高以上（ ）m处。",[146,148,150,152],{"key":20,"text":147,"correct":22},"0．5～1．0",{"key":24,"text":149,"correct":26},"1．0～1．3",{"key":28,"text":151,"correct":22},"1．3～1．8",{"key":31,"text":153,"correct":22},"1．8～2．1",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},906450,"多用于屋面板安装的压型金属板是（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"超高波板",{"key":24,"text":161,"correct":22},"高波板",{"key":28,"text":163,"correct":26},"中波板",{"key":31,"text":165,"correct":22},"低波板",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},906451,"某12层住宅楼在拟定结构吊装方案时，应选择的起重机械为（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"履带式起重机",{"key":24,"text":173,"correct":22},"塔式起重机",{"key":28,"text":175,"correct":26},"自升式塔式起重机",{"key":31,"text":177,"correct":22},"桅杆起重机",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},906452,"某建筑物的外墙外边线尺寸为60m×8m，起重机采用外单侧布置，外脚手宽1．5m，吊车轨距850mm，求塔吊的最小起重半径为（ ）m。",[182,184,186,188],{"key":20,"text":183,"correct":22},"9．725",{"key":24,"text":185,"correct":22},"10．35",{"key":28,"text":187,"correct":26},"10．425",{"key":31,"text":189,"correct":22},"10．85",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},906453,"以下土层中不宜采用重锤夯实地基的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"砂土",{"key":24,"text":197,"correct":22},"湿陷性黄土",{"key":28,"text":199,"correct":22},"杂填土",{"key":31,"text":201,"correct":26},"软黏土",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":20,"analysis":33},906454,"在填土压实施工中，适用于大面积非黏性土回填压实的方法是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":26},"振动压实法",{"key":24,"text":209,"correct":22},"内燃夯实法",{"key":28,"text":211,"correct":22},"羊足碾碾压法",{"key":31,"text":213,"correct":22},"蛙式打夯机夯实法",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":20,"analysis":33},906455,"用单斗挖掘机械施工时，如果要开挖停机面以上Ⅳ级土，应选用（ ）。",[218,219,220,221],{"key":20,"text":39,"correct":26},{"key":24,"text":41,"correct":22},{"key":28,"text":43,"correct":22},{"key":31,"text":45,"correct":22},{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},906456,"土石方填筑与压实时，（ ）适合碾压非黏性土。",[226,228,230,232],{"key":20,"text":227,"correct":22},"气胎碾",{"key":24,"text":229,"correct":22},"羊足碾",{"key":28,"text":231,"correct":22},"夯实法",{"key":31,"text":207,"correct":26},{"id":234,"libraryId":5,"type":15,"typeLabel":16,"stem":235,"options":236,"answer":24,"analysis":33},906457,"用锤击法沉桩施工时，下列叙述错误的是（ ）。",[237,239,241,243],{"key":20,"text":238,"correct":22},"锤重应大于等于桩重",{"key":24,"text":240,"correct":26},"应重锤高击",{"key":28,"text":242,"correct":22},"应重锤低击",{"key":31,"text":244,"correct":22},"当锤重大于桩重的1.5-2.0倍时，能取得良好的效果",{"id":246,"libraryId":5,"type":15,"typeLabel":16,"stem":247,"options":248,"answer":31,"analysis":33},906458,"抓铲挖掘机的作业特点是（ ）。",[249,251,253,255],{"key":20,"text":250,"correct":22},"前进向下，自重切土",{"key":24,"text":252,"correct":22},"后退向下，自重切土",{"key":28,"text":254,"correct":22},"后退向下，强制切土",{"key":31,"text":256,"correct":26},"直上直下，自重切土",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":20,"analysis":33},906459,"长18m以内的钢柱拼装应采用（ ）。",[261,262,264,265],{"key":20,"text":135,"correct":26},{"key":24,"text":263,"correct":22},"构件立装法",{"key":28,"text":141,"correct":22},{"key":31,"text":266,"correct":22},"利用桁架拼装法",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":20,"analysis":33},906460,"在坚硬土层中，桥梁墩台基础施工优先采用的主要沉桩方法为（ ）。",[271,273,275,277],{"key":20,"text":272,"correct":26},"射水沉桩",{"key":24,"text":274,"correct":22},"锤击沉桩",{"key":28,"text":276,"correct":22},"振动沉桩",{"key":31,"text":278,"correct":22},"静力压桩",{"id":280,"libraryId":5,"type":15,"typeLabel":16,"stem":281,"options":282,"answer":28,"analysis":33},906461,"通常情况下，适宜墩台基础振动沉桩法施工的土质为（ ）。",[283,285,287,289],{"key":20,"text":284,"correct":22},"中密砂类土",{"key":24,"text":286,"correct":22},"砂夹卵石层",{"key":28,"text":288,"correct":26},"较松散碎、卵石类土",{"key":31,"text":290,"correct":22},"高压缩性黏性土",{"id":292,"libraryId":5,"type":15,"typeLabel":16,"stem":293,"options":294,"answer":28,"analysis":33},906462,"当采用推土机进行管沟回填，并且无倒车余地时，可采用（ ）。",[295,297,299,301],{"key":20,"text":296,"correct":22},"下坡推土法",{"key":24,"text":298,"correct":22},"并列推土法",{"key":28,"text":300,"correct":26},"斜角推土法",{"key":31,"text":302,"correct":22},"沟槽推土法",{"id":304,"libraryId":5,"type":15,"typeLabel":16,"stem":305,"options":306,"answer":24,"analysis":33},906463,"用推土机回填管沟，当无倒车余地时一般采用（ ）。",[307,308,309,310],{"key":20,"text":302,"correct":22},{"key":24,"text":300,"correct":26},{"key":28,"text":296,"correct":22},{"key":31,"text":311,"correct":22},"分批集中，一次推土法",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":24,"analysis":33},906464,"装配整体式结构中，预制构件的混凝土强度等级不宜低于（ ）。",[316,318,320,322],{"key":20,"text":317,"correct":22},"C25",{"key":24,"text":319,"correct":26},"C30",{"key":28,"text":321,"correct":22},"C35",{"key":31,"text":323,"correct":22},"C40",{"id":325,"libraryId":5,"type":15,"typeLabel":16,"stem":326,"options":327,"answer":24,"analysis":33},906465,"桥梁墩台基础施工时，在砂夹卵石层中，优先采用的主要沉桩方法为（ ）。",[328,329,330,331],{"key":20,"text":274,"correct":22},{"key":24,"text":272,"correct":26},{"key":28,"text":276,"correct":22},{"key":31,"text":278,"correct":22},{"id":333,"libraryId":5,"type":15,"typeLabel":16,"stem":334,"options":335,"answer":28,"analysis":33},906467,"装配整体式结构中，直径大于20mm的钢筋连接时，不宜采用（ ）。",[336,338,340,342],{"key":20,"text":337,"correct":22},"机械连接",{"key":24,"text":339,"correct":22},"套筒灌浆连接",{"key":28,"text":341,"correct":26},"浆锚搭接连接",{"key":31,"text":343,"correct":22},"焊接连接",{"id":345,"libraryId":5,"type":15,"typeLabel":16,"stem":346,"options":347,"answer":20,"analysis":33},906468,"装配整体式结构中，预制构件吊装就位后，应及时校准并（ ）。",[348,350,352,354],{"key":20,"text":349,"correct":26},"采取临时固定措施，每个预制构件的临时支撑不宜少于2道",{"key":24,"text":351,"correct":22},"采取临时固定措施，每个预制构件的临时支撑不宜少于3道",{"key":28,"text":353,"correct":22},"采取永久固定措施，每个预制构件的临时支撑不宜少于2道",{"key":31,"text":355,"correct":22},"采取永久固定措施，每个预制构件的临时支撑不宜少于3道",{"id":357,"libraryId":5,"type":15,"typeLabel":16,"stem":358,"options":359,"answer":24,"analysis":33},906469,"主要用于浇筑平板式楼板或带边梁楼板的工具式模板为（ ）。",[360,362,364,366],{"key":20,"text":361,"correct":22},"大模板",{"key":24,"text":363,"correct":26},"台模",{"key":28,"text":365,"correct":22},"隧道模板",{"key":31,"text":367,"correct":22},"永久式模板",{"id":369,"libraryId":5,"type":15,"typeLabel":16,"stem":370,"options":371,"answer":31,"analysis":33},906470,"大体积混凝土入模温度不宜超过（ ）℃。",[372,374,376,378],{"key":20,"text":373,"correct":22},"15",{"key":24,"text":375,"correct":22},"20",{"key":28,"text":377,"correct":22},"25",{"key":31,"text":379,"correct":26},"30",{"id":381,"libraryId":5,"type":15,"typeLabel":16,"stem":382,"options":383,"answer":31,"analysis":33},906471,"打桩的顺序，以下说法不正确的是（ ）。",[384,386,388,390],{"key":20,"text":385,"correct":22},"基坑不大时，打桩应从中间开始分头向两边或四周进行",{"key":24,"text":387,"correct":22},"当桩基的设计标高不同时，应先深后浅",{"key":28,"text":389,"correct":22},"当桩的规格不同时，应先大后小，先长后短",{"key":31,"text":391,"correct":26},"当桩基的设计标高不同时，应先浅后深",{"id":393,"libraryId":5,"type":15,"typeLabel":16,"stem":394,"options":395,"answer":24,"analysis":33},906472,"单层钢结构厂房在安装前需要进行吊装稳定性验算的钢结构件是（ ）。",[396,398,400,402],{"key":20,"text":397,"correct":22},"钢柱",{"key":24,"text":399,"correct":26},"钢屋架",{"key":28,"text":401,"correct":22},"吊车梁",{"key":31,"text":403,"correct":22},"钢桁架",{"id":405,"libraryId":5,"type":15,"typeLabel":16,"stem":406,"options":407,"answer":28,"analysis":33},906473,"场地填筑的填料为爆破石渣、碎石类土、杂填土时，宜采用的压实机械为（ ）。",[408,410,411,413],{"key":20,"text":409,"correct":22},"平碾",{"key":24,"text":229,"correct":22},{"key":28,"text":412,"correct":26},"振动碾",{"key":31,"text":227,"correct":22},{"id":415,"libraryId":5,"type":15,"typeLabel":16,"stem":416,"options":417,"answer":28,"analysis":33},906474,"采用深层搅拌法进行地基加固处理，适用条件为（ ）。",[418,420,422,424],{"key":20,"text":419,"correct":22},"砂砾石松软地基",{"key":24,"text":421,"correct":22},"松散砂地基",{"key":28,"text":423,"correct":26},"黏土软弱地基",{"key":31,"text":425,"correct":22},"碎石土软弱地基",{"id":427,"libraryId":5,"type":15,"typeLabel":16,"stem":428,"options":429,"answer":20,"analysis":33},906475,"采用明排水法开挖基坑，在基坑开挖过程中设置的集水坑应（ ）。",[430,432,434,436],{"key":20,"text":431,"correct":26},"布置在基础范围以外",{"key":24,"text":433,"correct":22},"布置在基坑底部中央",{"key":28,"text":435,"correct":22},"布置在地下水走向的下游",{"key":31,"text":437,"correct":22},"经常低于挖土面1.0m以上",{"id":439,"libraryId":5,"type":15,"typeLabel":16,"stem":440,"options":441,"answer":31,"analysis":33},906476,"北方寒冷地区采用轻型井点降水时，井点管与集水总管连接应用（ ）。",[442,444,446,448],{"key":20,"text":443,"correct":22},"PVC-U管",{"key":24,"text":445,"correct":22},"PVC-C管",{"key":28,"text":447,"correct":22},"PP-R管",{"key":31,"text":449,"correct":26},"橡胶软管",{"id":451,"libraryId":5,"type":15,"typeLabel":16,"stem":452,"options":453,"answer":20,"analysis":33},906477,"（ ）是国内外目前最常用的一种幕墙，广泛运用于现代化高档公共建筑的外墙装饰。",[454,456,458,460],{"key":20,"text":455,"correct":26},"玻璃幕墙",{"key":24,"text":457,"correct":22},"石材幕墙",{"key":28,"text":459,"correct":22},"混凝土幕墙",{"key":31,"text":461,"correct":22},"金属幕墙",{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},906478,"（ ）连接传力可靠，韧性和塑性好，质量易于检查，抗动力荷载好。",[466,468,470,471],{"key":20,"text":467,"correct":22},"绑扎",{"key":24,"text":469,"correct":22},"焊接",{"key":28,"text":129,"correct":26},{"key":31,"text":472,"correct":22},"螺栓",{"id":474,"libraryId":5,"type":15,"typeLabel":16,"stem":475,"options":476,"answer":31,"analysis":33},906479,"在直接承受动力荷载的钢筋混凝土构件中，纵向受力钢筋的连接方式不宜采用（ ）。",[477,479,481,483],{"key":20,"text":478,"correct":22},"绑扎搭接连接",{"key":24,"text":480,"correct":22},"钢筋直螺纹套管连接",{"key":28,"text":482,"correct":22},"钢筋锥螺纹套管连接",{"key":31,"text":484,"correct":26},"闪光对焊连接",{"id":486,"libraryId":5,"type":15,"typeLabel":16,"stem":487,"options":488,"answer":31,"analysis":33},906480,"在渗透系数大、地下水量大的土层中，适宜采用的降水形式为（ ）。",[489,491,493,495],{"key":20,"text":490,"correct":22},"轻型井点",{"key":24,"text":492,"correct":22},"电渗井点",{"key":28,"text":494,"correct":22},"喷射井点",{"key":31,"text":496,"correct":26},"管井井点",{"id":498,"libraryId":5,"type":15,"typeLabel":16,"stem":499,"options":500,"answer":28,"analysis":33},906481,"在轻型井点施工中，井点系统的安装内容包括：①挖井点沟槽；②冲孔；③灌填砂滤料；④弯联管将井点管与集水管连接；⑤铺设集水总管；⑥沉设井点管；⑦安装抽水设备、试抽。其正确的安装顺序为（ ）。",[501,503,505,507],{"key":20,"text":502,"correct":22},"①②③④⑤⑥⑦",{"key":24,"text":504,"correct":22},"①②③⑥⑤④⑦",{"key":28,"text":506,"correct":26},"①⑤②⑥③④⑦",{"key":31,"text":508,"correct":22},"①②③⑤⑥④⑦",{"id":510,"libraryId":5,"type":15,"typeLabel":16,"stem":511,"options":512,"answer":28,"analysis":33},906482,"在铲运机铲土的施工方法中，跨铲法是预留土埂，间隔铲土的方法。可使铲运机在挖两边土槽时减少向外撒土量，挖土埂时增加了两个自由面，阻力减小，铲土容易，土埂高度应不大于（ ）mm，宽度以不大于拖拉机两履带间净距为宜。",[513,515,517,519],{"key":20,"text":514,"correct":22},"1000",{"key":24,"text":516,"correct":22},"200",{"key":28,"text":518,"correct":26},"300",{"key":31,"text":520,"correct":22},"500",{"id":522,"libraryId":5,"type":15,"typeLabel":16,"stem":523,"options":524,"answer":28,"analysis":33},906483,"预应力张拉时，下列不符合要求的是（ ）。",[525,527,529,531],{"key":20,"text":526,"correct":22},"长度为20米的有黏结预应力筋一端张拉",{"key":24,"text":528,"correct":22},"长度为30米的直线型有黏结预应力筋一端张拉",{"key":28,"text":530,"correct":26},"长度为45米的无黏结预应力筋一端张拉",{"key":31,"text":532,"correct":22},"长度为55米的无黏结预应力筋两端张拉",{"id":534,"libraryId":5,"type":15,"typeLabel":16,"stem":535,"options":536,"answer":28,"analysis":33},906484,"预应力钢筋与螺丝端杆的对接，宜采用的焊接方式是（ ）。",[537,539,541,543],{"key":20,"text":538,"correct":22},"电阻点焊",{"key":24,"text":540,"correct":22},"电渣压力焊",{"key":28,"text":542,"correct":26},"闪光对焊",{"key":31,"text":544,"correct":22},"电弧压力焊",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":31,"analysis":33},906485,"与采用综合吊装法相比，采用分件吊装法的优点是（ ）。",[549,551,553,555],{"key":20,"text":550,"correct":22},"起重机开行路线短，停机点少",{"key":24,"text":552,"correct":22},"能为后续工序提供工作面",{"key":28,"text":554,"correct":22},"有利于各工种交叉平行流水作业",{"key":31,"text":556,"correct":26},"起重机变幅和索具更换次数少，吊装效率高",{"id":558,"libraryId":5,"type":15,"typeLabel":16,"stem":559,"options":560,"answer":28,"analysis":33},906486,"有关混凝土的制备，说法正确的是（ ）。",[561,563,565,567],{"key":20,"text":562,"correct":22},"钢筋混凝土结构可以使用含氯化物的水泥",{"key":24,"text":564,"correct":22},"混凝土实心板用的骨料最大颗粒粒径不宜超过板厚的1／2",{"key":28,"text":566,"correct":26},"自落式混凝土搅拌机适用于搅拌塑性混凝土",{"key":31,"text":568,"correct":22},"对于混凝土坍落度和搅拌机出料量相同的情况，自落式比强制式搅拌机的搅拌最短时间短",{"id":570,"libraryId":5,"type":15,"typeLabel":16,"stem":571,"options":572,"answer":28,"analysis":33},906487,"压型金属板施工中，某屋面采用波高80mm的压型钢板，该钢板属于（ ）。",[573,574,575,576],{"key":20,"text":165,"correct":22},{"key":24,"text":163,"correct":22},{"key":28,"text":161,"correct":26},{"key":31,"text":159,"correct":22},{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":20,"analysis":33},906488,"下面选项，关于土石方填筑正确的是（ ）。",[581,583,585,587],{"key":20,"text":582,"correct":26},"宜采用同类土填筑",{"key":24,"text":584,"correct":22},"从上至下填筑土层的透水性应从大到小",{"key":28,"text":586,"correct":22},"含水量大的黏土宜填筑在下层",{"key":31,"text":588,"correct":22},"硫酸盐含量小于5％的土不能使用",{"id":590,"libraryId":5,"type":15,"typeLabel":16,"stem":591,"options":592,"answer":20,"analysis":33},906489,"下面关于预应力后张法的施工工艺，下列说法正确的是（ ）。",[593,595,597,599],{"key":20,"text":594,"correct":26},"灌浆孔的间距，对预埋金属螺旋管不宜大于30m",{"key":24,"text":596,"correct":22},"孔道灌浆所用水泥浆拌和后至灌浆完毕的时间不宜超过35min",{"key":28,"text":598,"correct":22},"对后张法预应力梁，张拉时现浇结构混凝土的龄期不宜小于5d",{"key":31,"text":600,"correct":22},"张拉预应力筋时，设计无规定的，构件混凝土的强度不低于设计强度等级的50％",[602,605,608,611,614,617],{"id":15,"name":603,"category":7,"favorite":604},"领导干部任职前廉政法规知识测试题",92,{"id":606,"name":607,"category":7,"favorite":15},595,"建筑结构与设备",{"id":609,"name":610,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":612,"name":613,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":615,"name":616,"category":7,"favorite":8},534,"BIM工程师",{"id":618,"name":616,"category":7,"favorite":8},535]