[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-586-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":617},{"id":5,"name":6,"category":7,"favorite":8},586,"建设工程技术与计量（土建）","建筑工程",0,12,50,2410,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,453,462,474,486,498,510,522,534,546,558,570,582,594,606],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},906030,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），墙面抹灰工程量的计算，说法正确的是（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","墙面抹灰工程量应扣除墙与构件交接处面积",false,{"key":24,"text":25,"correct":26},"B","有墙裙的内墙抹灰按主墙间净长乘以墙裙顶至天棚底高度以面积计算",true,{"key":28,"text":29,"correct":22},"C","内墙抹灰不单独计算",{"key":31,"text":32,"correct":22},"D","外墙抹灰按外墙展开面积计算","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":28,"analysis":33},906031,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于地基处理，说法正确的是（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"铺设木工合成材料按设计长度计算",{"key":24,"text":41,"correct":22},"强夯地基按设计图示处理范围乘以深度以体积计算",{"key":28,"text":43,"correct":26},"填料振冲桩按设计图示尺寸以体积计算",{"key":31,"text":45,"correct":22},"砂石桩按设计数量以根计算",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},906032,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于砌墙工程量计算，说法正确的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"扣除凹进墙内的管槽，暖气槽所占体积",{"key":24,"text":53,"correct":22},"扣除伸入墙内的梁头、板头所占体积",{"key":28,"text":55,"correct":22},"扣除凸出墙面砖垛体积",{"key":31,"text":57,"correct":22},"扣除擦头、垫木所占体积",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":20,"analysis":33},906033,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于预制混凝土构件工程量计算，说法正确的是（ ）。",[62,64,66,68],{"key":20,"text":63,"correct":26},"预制组合屋架，按设计图示尺寸以体积计算，不扣除预埋铁件所占体积",{"key":24,"text":65,"correct":22},"预制网架板，按设计图示尺寸以体积计算，不扣除空洞占体积",{"key":28,"text":67,"correct":22},"预制空心板，按设计图示尺寸以体积计算，不扣除空心板空洞占体积",{"key":31,"text":69,"correct":22},"预制混凝土楼梯，按设计图示尺寸以体积计算，不扣除空心踏步板空洞体积",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":28,"analysis":33},906034,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）,钢筋工程中钢筋网片工程量（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"不单独计算",{"key":24,"text":77,"correct":22},"按设计图以数量计算",{"key":28,"text":79,"correct":26},"按设计图示面积乘以单位理论质量计算",{"key":31,"text":81,"correct":22},"按设计图示尺寸以片计算",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":24,"analysis":33},906035,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），斜屋面的卷材防水工程量应（ ）。",[86,88,90,92],{"key":20,"text":87,"correct":22},"按设计图示尺寸以水平投影面积计算",{"key":24,"text":89,"correct":26},"按设计图示尺寸以斜面积计算",{"key":28,"text":91,"correct":22},"扣除房上烟囱，风帽底座所占面积",{"key":31,"text":93,"correct":22},"扣除屋面小气窗，斜沟所占面积",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":24,"analysis":33},906036,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），某钢筋混凝土梁长为12000mm，设计保护层厚为25mm，箍筋为Φ10@200，则该梁所配箍筋数量应是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":22},"60根",{"key":24,"text":101,"correct":26},"61根",{"key":28,"text":103,"correct":22},"62根",{"key":31,"text":105,"correct":22},"200根",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":20,"analysis":33},906037,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，有关楼地面防水防潮工程量计算，说法正确的是（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":26},"按设计图示尺寸以面积计算",{"key":24,"text":113,"correct":22},"按主墙间净面积计算，搭接和反边部分不计",{"key":28,"text":115,"correct":22},"反边高度≦300mm部分不计算",{"key":31,"text":117,"correct":22},"反边高度>300mm部分计入楼地面防水",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":31,"analysis":33},906038,"根据《建设工程工程量清单计价规范》。平整场地工程量计算规则是（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"按建筑物外围面积乘以平均挖土厚度计算",{"key":24,"text":125,"correct":22},"按建筑物外边线外加2m以平面面积计算",{"key":28,"text":127,"correct":22},"按建筑物首层面积乘以平均挖土厚度计算",{"key":31,"text":129,"correct":26},"按设计图示尺寸以建筑物首层面税计算",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":28,"analysis":33},906039,"某工业车间，设计轴线尺寸为6.0m×8.0m，墙体厚度为240mm，地面做水乳型再生胶沥青聚脂布二布三涂防水层，设计要求与墙面连接上弯高度为400mm，则其防水工程量为（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"平面55.52m2",{"key":24,"text":137,"correct":22},"平面59.20m2",{"key":28,"text":139,"correct":26},"平面44.70m2，立面10.82m2",{"key":31,"text":141,"correct":22},"平面48.00m2，立面11.20m2",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":20,"analysis":33},906040,"某管沟直埋工程，设计图示管道中心线长250m，水平最大宽度1．00m，管底外表面标高为-1．25m，地面平均标高为0．25m，埋管土壤为Ⅱ类土。根据《建设工程工程量清单计价规范》的有关规定，该管沟土方工程量为（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":26},"312.5m3",{"key":24,"text":149,"correct":22},"312.5m",{"key":28,"text":151,"correct":22},"250m3",{"key":31,"text":153,"correct":22},"250m",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":28,"analysis":33},906041,"现浇钢筋混凝土无梁楼板的混凝土工程量应（ ）。",[158,160,162,164],{"key":20,"text":159,"correct":22},"按板的体积计算",{"key":24,"text":161,"correct":22},"按板的体积乘以1.22的系数计算",{"key":28,"text":163,"correct":26},"按板和柱帽体积之和计算",{"key":31,"text":165,"correct":22},"按不同板厚水平投影面积计算",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":20,"analysis":33},906042,"据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于桩基础的项目列项或工程量计算正确的为（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":26},"预制钢筋混凝土管桩试验桩应在工程量清单中单独列顶",{"key":24,"text":173,"correct":22},"预制钢筋混凝土方桩试验桩工程量应并入预制钢筋混凝土方桩项目",{"key":28,"text":175,"correct":22},"现场截凿桩头工程量不单独列顶，并入桩工程量计算",{"key":31,"text":177,"correct":22},"挖孔桩土方按设计桩长（包括桩尖）以米计算",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":28,"analysis":33},906043,"根据《建设工程工程量清单计价规范》，以下关于砖砌体工程量计算，正确的说法是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"砖砌台阶按设计图示尺寸以体积计算",{"key":24,"text":185,"correct":22},"砖散水按设计图示尺寸以体积计算",{"key":28,"text":187,"correct":26},"砖地沟按设计图示尺寸以中心线长度计算",{"key":31,"text":189,"correct":22},"砖明沟按设计图示尺寸以水平面积计算",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":24,"analysis":33},906044,"根据《建设工程工程量清单计价规范》（GB 50854-2013），预压地基的工程量计算应按（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"设计图示以天然密实体积计算",{"key":24,"text":197,"correct":26},"设计图示处理范围以面积计算",{"key":28,"text":199,"correct":22},"设计不同孔径以孔数计算",{"key":31,"text":201,"correct":22},"设计不同孔深度以孔数计算",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},906045,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于砖砌体工程量计算的说法，正确的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"空斗墙按设计尺寸墙体外形体积计算，其中门窗洞口立边的实砌部分不计入",{"key":24,"text":209,"correct":22},"空花墙按设计尺寸以墙体外形体积计算，其中空洞部分体积应予以扣除",{"key":28,"text":211,"correct":26},"实心砖柱按设计尺寸以柱体积计算，钢筋混凝土梁垫.梁头所占体积应予以扣除",{"key":31,"text":213,"correct":22},"空心砖围墙中心线长乘以墙高以面积计算",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":24,"analysis":33},906046,"工程量按长度以米为计量单位计算的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"窗台板装饰工程",{"key":24,"text":221,"correct":26},"空花格栏杆",{"key":28,"text":223,"correct":22},"天棚灯带装饰",{"key":31,"text":225,"correct":22},"现浇水磨石台阶面",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},906047,"根据《建筑工程工程量清单计价规范》(GB 50854-2013)，按设计图示数量计算油漆工程量的是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"窗",{"key":24,"text":233,"correct":22},"木墙裙",{"key":28,"text":235,"correct":22},"踢脚线",{"key":31,"text":237,"correct":22},"木栏杆",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},906048,"根据《建设工程工程量清单计价规范》的有关规定，天棚面层工程量清单计算中，下面说法正确的是（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"天棚面中的灯槽、跌级展开增加的面积另行计算并入天棚",{"key":24,"text":245,"correct":22},"扣除间壁墙所占面积",{"key":28,"text":247,"correct":22},"天棚检查孔、灯槽单独列项",{"key":31,"text":249,"correct":26},"天棚面中的灯槽、跌级展开增加的面积不另计算",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":31,"analysis":33},906049,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），砌筑工程量计算正确的是（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"砖地沟按设计图示尺寸以水平投影面积计算",{"key":24,"text":257,"correct":22},"砖地坪按设计图示尺寸以体积计算",{"key":28,"text":259,"correct":22},"石挡土墙按设计图示尺寸以面积计算",{"key":31,"text":261,"correct":26},"石坡道按设计图示尺寸以面积计算",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":20,"analysis":33},906050,"直径为18mm 的钢筋，两端为半圆弯钩，则钢筋弯钩的增加长度为（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":26},"112.5mm",{"key":24,"text":269,"correct":22},"63mm",{"key":28,"text":271,"correct":22},"88.2mm",{"key":31,"text":273,"correct":22},"180mm",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":31,"analysis":33},906051,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），门窗工程量计算正确的是（ ）。",[278,280,282,284],{"key":20,"text":279,"correct":22},"木门框按设计图示洞口尺寸以面积计算",{"key":24,"text":281,"correct":22},"金属纱窗按设计图示洞口尺寸以面积计算",{"key":28,"text":283,"correct":22},"石材窗台板按设计图示以水平投影面积计算",{"key":31,"text":285,"correct":26},"木门的门锁安装按设计图示数量计算",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":24,"analysis":33},906052,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），屋面防水工程量计算，说法正确的是（ ）。",[290,292,294,296],{"key":20,"text":291,"correct":22},"斜屋面卷材防水，工程量按水平投影面积计算",{"key":24,"text":293,"correct":26},"平屋面涂膜防水，工程量不扣除烟囱所占面积",{"key":28,"text":295,"correct":22},"平屋面女儿墙弯起部分卷材防水不计工程量",{"key":31,"text":297,"correct":22},"平屋面伸缩缝卷材防水不计工程量",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":20,"analysis":33},906053,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于涂料工程量的计算，说法正确的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":26},"木材构件喷刷防火涂料按设计图示以面积计算",{"key":24,"text":305,"correct":22},"金属构件刷防火涂料按构件单面外围面积计算",{"key":28,"text":307,"correct":22},"空花格、栏杆刷涂料按设计图示尺寸以双面面积计算",{"key":31,"text":309,"correct":22},"线条刷涂料按设计展开面积计算",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":20,"analysis":33},906054,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），砖基础施工时没变需要增加（ ）工作面。",[314,316,318,320],{"key":20,"text":315,"correct":26},"200mm",{"key":24,"text":317,"correct":22},"150mm",{"key":28,"text":319,"correct":22},"300mm",{"key":31,"text":321,"correct":22},"250mm",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":31,"analysis":33},906055,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），石方工程量计算正确的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":22},"挖基坑石方按设计图示尺寸基础底面面积乘以埋置深度以体积计算",{"key":24,"text":329,"correct":22},"挖沟槽石方按设计图示以沟槽中心线长度计算",{"key":28,"text":331,"correct":22},"挖一般石方按设计图示开挖范围的水平投影面积计算",{"key":31,"text":333,"correct":26},"挖管沟石方按设计图示以管道中心线长度计算",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},906056,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于土石方工程量计算，说法正确的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"回填土方项目特征应包括填方来源及运距",{"key":24,"text":341,"correct":22},"室内回填应扣除间隔墙所占体积",{"key":28,"text":343,"correct":22},"场地回填按设计回填尺寸以面积计算",{"key":31,"text":345,"correct":22},"基础回填不扣除基础垫层所占体积",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},906057,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，有关木结构工程量计算，说法正确的是（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"木屋架的跨度应与墙或柱的支撑点间的距离计算",{"key":24,"text":353,"correct":22},"木屋架的马尾、折角工程量不予计算",{"key":28,"text":355,"correct":26},"钢木屋架钢拉杆、连接螺栓不单独列项计算",{"key":31,"text":357,"correct":22},"木柱区分不同规格以高度计算",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},906058,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于门窗工程量能计算，说法正确的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"木质门带套工程量应按套外围面积计算",{"key":24,"text":365,"correct":22},"门窗工程量计量单位与项目特征描述无关",{"key":28,"text":367,"correct":22},"门窗工程量按图示尺寸以面积为单位时，项目特征必须描述洞口尺寸",{"key":31,"text":369,"correct":26},"门窗工程量以数量“樘”为单位时，项目特征必须描述洞口尺寸",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":31,"analysis":33},906059,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于屋面防水工程量计算，说法正确的是（ ）。",[374,376,378,380],{"key":20,"text":375,"correct":22},"斜屋面卷材防水按水平投影面积计算",{"key":24,"text":377,"correct":22},"女儿墙、伸缩缝等处卷材防水弯起部分不计",{"key":28,"text":379,"correct":22},"屋面排水管按设计图示数量以根计算",{"key":31,"text":381,"correct":26},"屋面变形缝卷材防水按设计图示尺寸以长度计算",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":31,"analysis":33},906060,"根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），天棚抹灰工程量计算正确的是（ ）",[386,388,390,392],{"key":20,"text":387,"correct":22},"扣除检查口和管道所占面积",{"key":24,"text":389,"correct":22},"板式楼梯底面抹灰按水平投影面积计算",{"key":28,"text":391,"correct":22},"扣除间壁墙、垛和柱所占面积",{"key":31,"text":393,"correct":26},"锯齿形楼梯底板抹灰按展开面积计算",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},906061,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，关于现浇混凝土柱工程量计算，说法正确的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"有梁板矩形独立柱工程量按柱设计截面积乘以自柱基底面至板面高度以体积计算",{"key":24,"text":401,"correct":22},"无梁板矩形柱工程量按柱设计截面积乘以自楼板上表面至柱帽上表面高度以体积计算",{"key":28,"text":403,"correct":22},"框架柱工程量按柱设计截面积乘以自柱基底面至柱顶面高度以体积计算",{"key":31,"text":405,"correct":26},"构造柱按设计尺寸自柱底面至顶面全高以体积计算",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":28,"analysis":33},906062,"根据《房屋建筑与装饰工程工程量计量规范》(GB50854--2013)，若开挖设计长为18m，宽为8m，深度为0.8 的土方工程，在清单中列项应为（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"平整场地",{"key":24,"text":413,"correct":22},"挖沟槽",{"key":28,"text":415,"correct":26},"挖基坑",{"key":31,"text":417,"correct":22},"挖一般土方",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":24,"analysis":33},906063,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013)规定，关于砖砌体工程量计算说法正确的为（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"砖基础工程量中不含基础砂浆防潮层所占体积",{"key":24,"text":425,"correct":26},"使用同一种材料的基础与墙身以设计室内地面为分界",{"key":28,"text":427,"correct":22},"实心砖墙的工程量中不应计入凸出墙面的砖垛体积",{"key":31,"text":429,"correct":22},"坡屋面有屋架的外墙高由基础顶面算至屋架下弦底面",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":20,"analysis":33},906064,"根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013）规定，有关保温、隔热工程量计算，说法正确的是（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":26},"与天棚相连的梁的保温工程量并入天棚工程量",{"key":24,"text":437,"correct":22},"与墙体相连的柱的保温工程量按柱工程量计算",{"key":28,"text":439,"correct":22},"门窗洞口侧壁的保温工程量不计",{"key":31,"text":441,"correct":22},"梁保温工程量按设计图示尺寸以梁的中心线长度计算",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":20,"analysis":33},906065,"在计算建筑地面隔热层工程量时，隔热层的计算应为（ ）。",[446,447,449,451],{"key":20,"text":111,"correct":26},{"key":24,"text":448,"correct":22},"按设计图示尺寸乘以厚度以体积计算",{"key":28,"text":450,"correct":22},"扣除面积小于0.3㎡孔洞",{"key":31,"text":452,"correct":22},"扣除面积小于0.3㎡柱",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":20,"analysis":33},906066,"根据《建筑工程工程量清单计价规范》（GB50854-2013），按设计图示尺寸以长度计算油漆工程量的是（ ）。",[457,459,460,461],{"key":20,"text":458,"correct":26},"窗帘盒",{"key":24,"text":233,"correct":22},{"key":28,"text":235,"correct":22},{"key":31,"text":237,"correct":22},{"id":463,"libraryId":5,"type":15,"typeLabel":16,"stem":464,"options":465,"answer":28,"analysis":33},906067,"根据《建筑工程建筑面积计算规范》(GB\u002FT 50353-2005)，内部连通的高低联跨建筑物内的变形缝应（ ）。",[466,468,470,472],{"key":20,"text":467,"correct":22},"计入高跨面积",{"key":24,"text":469,"correct":22},"高低跨平均计算",{"key":28,"text":471,"correct":26},"计入低跨面积",{"key":31,"text":473,"correct":22},"不计算面积",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":24,"analysis":33},906068,"建筑物外有顶盖和围护设施的无柱走廊的建筑面积应按（ ）计算.",[478,480,482,484],{"key":20,"text":479,"correct":22},"底板水平投影面积",{"key":24,"text":481,"correct":26},"底板水平投影面积的一半",{"key":28,"text":483,"correct":22},"围护结构外围面积",{"key":31,"text":485,"correct":22},"走廊中心线长乘以宽度",{"id":487,"libraryId":5,"type":15,"typeLabel":16,"stem":488,"options":489,"answer":20,"analysis":33},906069,"根据《房屋建筑与装饰工程工程量计算规范》(GB\u002FT50353-2013)，有顶盖无围护结构的货棚，其建筑面积应（ ）。",[490,492,494,496],{"key":20,"text":491,"correct":26},"按其顶盖水平投影面积的1\u002F2计算",{"key":24,"text":493,"correct":22},"按其顶盖水平投影面积计算",{"key":28,"text":495,"correct":22},"按柱外围水平面积的1\u002F2计算",{"key":31,"text":497,"correct":22},"按柱外围水平面积计算",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":28,"analysis":33},906070,"根据《建筑工程建筑面积计算规范》(GB／T 50353—2013)，关于有柱雨篷建筑面积计算的说法，正确的是（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"按其顶板水平投影面积计算",{"key":24,"text":505,"correct":22},"超过2.2m按其结构板水平投影面积计算",{"key":28,"text":507,"correct":26},"按其结构板水平投影面积的1\u002F2计算",{"key":31,"text":509,"correct":22},"结构外边线至外墙结构外边线的宽度在2.1m及以下的，不计算建筑面积",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":20,"analysis":33},906071,"关于建筑面积计算。正确的说法是（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":26},"建筑物顶部有围护结构的楼梯间层高不足2.2m按1\u002F2计算面积",{"key":24,"text":517,"correct":22},"建筑物凹阳台计算全部面积，挑阳台按1\u002F2计算面积",{"key":28,"text":519,"correct":22},"设计不利用的深基础架空层层高不足2.2m按1\u002F2计算面积",{"key":31,"text":521,"correct":22},"建筑物雨篷外挑宽度超过1.2m按水平投影面积1\u002F2计算",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},906072,"某单层工业厂房的外墙脚以上外围水平面积为7200m2，厂房高7.8m，内设有二层办公室.层高均大于2.2m，其外围水平面积为350m2，厂房外设办公室外楼梯两层，每个自然层水平投影面积为7.5m2，则该厂房的总建筑面程为（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":26},"7557.5m2",{"key":24,"text":529,"correct":22},"7565m2",{"key":28,"text":531,"correct":22},"7900m2",{"key":31,"text":533,"correct":22},"7915m2",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":20,"analysis":33},906073,"根据《建筑工程建筑面积计算规范》（GB\u002FT50353），多层建筑物二层及以上楼层应以层高判断如何计算建筑面积，关于结构层高的说法，正确的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":26},"最上层按楼面结构标高至层面板板面结构标高之间的垂直距离",{"key":24,"text":541,"correct":22},"以屋面板找坡的，按楼面结构标高至屋面板最高处标高之间的垂直距离",{"key":28,"text":543,"correct":22},"有基础底板的按底板下表面至上层楼面结构标高之间的垂直距离",{"key":31,"text":545,"correct":22},"没有基础底板的按基础底面至上层楼面结构标高之间的垂直距离",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},906074,"根据《建筑工程建筑面积计算规范》（GB\u002FT 50353），下列关于建筑物雨棚结构的建筑面积计算，正确的是（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":26},"有柱雨篷应按其结构板水平投影面积的1\u002F2计算",{"key":24,"text":553,"correct":22},"无柱雨篷应按其结构板水平投影面积的1\u002F2计算",{"key":28,"text":555,"correct":22},"雨篷外边线至外墙结构外边线不足2.10m不计算面积",{"key":31,"text":557,"correct":22},"雨篷外边线至外墙结构外边线超过2.10m按投影计算面积",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":20,"analysis":33},906075,"下列内容中，属于建筑面积中的辅助面积的是（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":26},"阳台面积",{"key":24,"text":565,"correct":22},"墙体所占面积",{"key":28,"text":567,"correct":22},"柱所占面积",{"key":31,"text":569,"correct":22},"会议室所占面积",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":24,"analysis":33},906076,"根据《建筑工程建筑面积计算规范》（GB\u002FT50353），建筑物屋顶无围护结构的水箱建筑面积计算应为（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":22},"层高超过2.2m应计算全面积",{"key":24,"text":577,"correct":26},"不计算建筑面积",{"key":28,"text":579,"correct":22},"层高不足2.2m不计算建筑面积",{"key":31,"text":581,"correct":22},"层高不足2.2m部分面积计算",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":24,"analysis":33},906077,"某高校新建一栋六层教学楼，建筑面积l8 000m2，经消防部门检查认定，建筑物内楼梯不能满足紧急疏散要求。为此又在两端墙外各增设一个封闭疏散楼梯，每个楼梯间的每层水平投影面积为16m2．根据《全国统一建筑工程预算工程量计算规则》规定，该教学楼的建筑面积应为（ ）m2。",[586,588,590,592],{"key":20,"text":587,"correct":22},"18192",{"key":24,"text":589,"correct":26},"18160",{"key":28,"text":591,"correct":22},"18096",{"key":31,"text":593,"correct":22},"18000",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":20,"analysis":33},906078,"根据《建筑工程建筑面积计算规范》(GBT50353-2013)，关于建筑面积计算说法正确的是（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":26},"当幕墙作为装饰结构的建筑物，幕墙可以不计算建筑面积",{"key":24,"text":601,"correct":22},"高低跨内相连通时变形缝计入高跨面积内",{"key":28,"text":603,"correct":22},"多层建筑首层按照勒脚外围水平面积计算",{"key":31,"text":605,"correct":22},"建筑物变形缝所占面积按自然层扣除",{"id":607,"libraryId":5,"type":15,"typeLabel":16,"stem":608,"options":609,"answer":24,"analysis":33},906079,"根据《建筑工程建筑面积计算规范》(GBT50353-2013)，关于无永久顶盖的室外顶层楼梯，其建筑面积计算说法中正确的是（ ）。",[610,612,614,615],{"key":20,"text":611,"correct":22},"按水平投影面积计算",{"key":24,"text":613,"correct":26},"按水平投影面积的1\u002F2计算",{"key":28,"text":577,"correct":22},{"key":31,"text":616,"correct":22},"层高2.20m以上按水平投影面积计算",[618,621,624,627,630,633],{"id":15,"name":619,"category":7,"favorite":620},"领导干部任职前廉政法规知识测试题",92,{"id":622,"name":623,"category":7,"favorite":15},595,"建筑结构与设备",{"id":625,"name":626,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":628,"name":629,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":631,"name":632,"category":7,"favorite":8},534,"BIM工程师",{"id":634,"name":632,"category":7,"favorite":8},535]