[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907913":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907913,586,2,"多选题","（2013年真题）混凝土拱涵和石砌拱涵施工应符合的要求有（）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","涵洞孔径在3m以上，宜用18～32kg型轻便轨",true,{"key":16,"text":17,"correct":14},"B","用混凝土块砌筑拱圈，灰缝宽度宜为20mm",{"key":19,"text":20,"correct":14},"C","预制拱圈强度达到设计强度的70%时方可安装",{"key":22,"text":23,"correct":24},"D","拱圈浇灌混凝土不能一次完成时可沿水平分段进行",false,{"key":26,"text":27,"correct":14},"E","拆除拱圈支架后，拱圈中砂浆强度达到设计强度的100%时，方可填土。","ABCE","涵洞孔径在3～6m的用18～32kg型轻便轨;灰缝宽度不得超过2cm;当拱涵用混凝土预制拱圈安装时，成品达到设计强度的70%时方可搬运、安装;混凝土的灌注应由拱脚向拱顶同时对称进行，要求全拱一次灌完，不能中途间歇，如因工程量大，一次难以完成全拱时，可按基础流降缝分节进行，每节应一次连续灌完，绝不可水平分段（因为拱圈受力是沿着拱轴线），也不宜按拱圈辐射方向分层（无模板控制，很难保证辐射方向）。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]