[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907777":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907777,586,2,"多选题","下列关于钢筋混凝土灌注桩工程量的计算，叙述中正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","按根计",true,{"key":16,"text":17,"correct":18},"B","按设计桩长（不包括桩尖），以m计",false,{"key":20,"text":21,"correct":14},"C","按设计桩长（算至桩尖），以m计",{"key":23,"text":24,"correct":18},"D","按“设计桩长（算至桩尖）+0.25m”计",{"key":26,"text":27,"correct":14},"E","按“设计桩长（算至桩尖）×设计图示截面积”，以m3计","ACE","2020版教材P382 预制钢筋混凝土桩、混凝土灌注桩按设计图示尺寸以桩长（包括桩尖）计算；或以“立方米”计量，按设计图示截面积乘以桩长（包括桩尖）以实体体积计算；或根数计算。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]