[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907714":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907714,586,2,"多选题","关于基坑土石方工程采用轻型井点降水，说法正确的是（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","U形布置不封闭段是为施工机械进出基坑留的开口",true,{"key":16,"text":17,"correct":18},"B","双排井点管适用于宽度小于6m的基坑",false,{"key":20,"text":21,"correct":18},"C","单排井点管应布置在基坑的地下水下游一侧",{"key":23,"text":24,"correct":18},"D","施工机械不能经U形布置的开口端进出基坑",{"key":26,"text":27,"correct":14},"E","环形布置适合于大面积基坑","AE","2020版教材P176 本题考查的是土石方工程施工技术。选项B，双排布置适用于基坑宽度大于6m或土质不良的情况。 选项C，单排井点管应布置在基坑的地下水上游一侧； 选项D，当土方施工机械需进出基坑时，也可采用U形布置。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]