[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907691":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907691,586,2,"多选题","土石方工程施工，正确的说法有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","填土应按不同土的透水性从小到大，自下而上分层回填",false,{"key":16,"text":17,"correct":14},"B","填土压实的分层厚度与压实遍数只与压实机械的功率有关，与填土种类和含水情况无关",{"key":19,"text":20,"correct":21},"C","水泥土搅拌桩系重力式支护结构，具有挡土、防渗功能",true,{"key":23,"text":24,"correct":14},"D","采用压实机械进行填方时，可不预留土方沉降量",{"key":26,"text":27,"correct":21},"E","铲运机运土速度快、效率高，其经济运距为600～1500m","CE","选项A错误，如采用不同透水性的土分层填筑时，下层宜填筑透水性较大、上层宜填筑透水性较小的填料，或将透水性较小的土层表面做成适当坡度，以免形成水囊。选项B错误，填方施工应接近水平地分层填土、分层压实，每层的厚度根据土的种类及选用的压实机械而定。 选项C正确，水泥土搅拌桩支护结构是近年来发展起来的一种重力式支护结构。 选项D错误，填方应按设计要求预留沉降量，如无设计要求时，可根据工程性质、填方高度、填料类别、压实机械及压实方法等，同有关部门共同确定。 选项E正确，铲运机适宜运距为600-1500m。当运距为200-350m时效率最高。 2020版教材P172-182",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]