[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907494":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907494,586,2,"多选题","后张法预应力混凝土工程施工中，常见的预应力损失有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","台座变形、倾覆和滑移引起的预应力损失",false,{"key":16,"text":17,"correct":14},"B","养护过程中引起的温差预应力损失",{"key":19,"text":20,"correct":21},"C","预应力筋与预留孔壁摩擦引起的预应力损失",true,{"key":23,"text":24,"correct":21},"D","平卧叠层浇筑上下构件之间的摩擦力引起的预应力损失",{"key":26,"text":27,"correct":21},"E","分批张拉预应力筋时，由于混凝土多次被压缩引起的预应力损失","CDE","本题考查后张法施工工艺。后张法预应力混凝土工程施工中，常见的预应力损失有：(1)预应力筋与预留孔壁摩擦引起的预应力损失；(2)平卧叠层浇筑上下构件之间的摩擦力引起的预应力损失；(3)分批张拉预应力筋时，由于混凝土多次被压缩引起的预应力损失。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]