[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907383":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907383,586,2,"多选题","(2013年)建设工程工程量清单中，项目特征描述的意义有()。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","体现对分部分项项目质量的要求",true,{"key":16,"text":17,"correct":14},"B","体现履行合同义务的相应要求",{"key":19,"text":20,"correct":14},"C","为承包人确定综合单价提供依据",{"key":22,"text":23,"correct":24},"D","对承包人施工组织管理提出要求",false,{"key":26,"text":27,"correct":24},"E","对承包人的施工作业提出具体要求","ABC","项目特征描述的意义：体现对分部分项项目质量的要求，为承包人确定综合单价提供依据。P301@##",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]