[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907364":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907364,586,2,"多选题","(2011年)道路工程施工中，正确的路堤填筑方法有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","不同性质的土应混填",false,{"key":16,"text":17,"correct":18},"B","将弱透水性土置于透水性土之上",true,{"key":20,"text":21,"correct":18},"C","不同性质的土有规则地水平分层填筑",{"key":23,"text":24,"correct":18},"D","堤身较高时可采用混合填筑法",{"key":26,"text":27,"correct":18},"E","竖向填筑时应选用高效能压实机械","BCDE","水平分层填筑是一种将 不同性质的土按照横断面全宽分成水平层次， 逐层向上填筑的方法， 该法易于达到规定的压实度， 易于保证质量， 是填筑路堤的基本方法。A对C不对 图4.2.2 不同路堤填筑方法 从中可以看出弱透水性土在透水性土之上。B对 竖向填筑法施工时需采取下列措施：选用高效能压实机械。D对 如因地形限制或堤身较高时， 不宜采用水平分层填筑或横向填筑法进行填筑时，可采用混合填筑法。E对",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]