[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907354":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},907354,586,2,"多选题","(2016年)关于卷材防水屋面施工，说法正确的有()。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","当基层变形较大时，卷材防水层应优先选用满粘法",false,{"key":16,"text":17,"correct":18},"B","采用满粘法施工，找平层分隔缝处卷材防水层应空铺",true,{"key":20,"text":21,"correct":18},"C","屋面坡度为3%-15%时，卷材防水层应优先采用平行屋脊方向铺",{"key":23,"text":24,"correct":18},"D","屋面坡度小于3%时，卷材防水层应平行屋脊方向铺粘",{"key":26,"text":27,"correct":18},"E","屋面坡地大于25%时，卷材防水层应采取固定措施","BCDE","当卷材防水层上有重物覆盖或基层变形较大时，应优先采用空铺法、点粘法、条粘法或机械固定法，但距屋面周边800mm内以及叠层铺贴的各层之间应满粘。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（土建）","建筑工程",0]