[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907242":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},907242,586,1,"单选题","（2020年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB 50854-2013），现浇混凝土过梁工程量计算正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","伸入墙内的梁头计入梁体积",true,{"key":16,"text":17,"correct":18},"B","墙内部分的梁垫按其他构件项目列项",false,{"key":20,"text":21,"correct":18},"C","梁内钢筋所占体积予以扣除",{"key":23,"text":24,"correct":18},"D","按设计图示中心线计算","P389-408 现浇混凝土过梁按设计图示尺寸以体积\"m3\"计算，不扣除构件内钢筋、预埋铁件所占体积，伸入墙内的梁头、梁垫并入梁体积内。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]