[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907195":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},907195,586,1,"单选题","（2013年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于金属结构工程量计算的说法，正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","钢吊车梁工程量包括制动梁、制定桁架工程量",true,{"key":16,"text":17,"correct":18},"B","钢管柱按设计力求尺寸以治理计算，扣除加强环、内衬管工程量",false,{"key":20,"text":21,"correct":18},"C","空腹钢柱按设计图示尺寸以长度计算",{"key":23,"text":24,"correct":18},"D","实腹钢柱按设计图示尺寸的长度计算，牛腿和悬臂梁质量另计","B加强环、内衬管工并入钢管柱工程量内;CD应该以质量计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]