[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907157":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},907157,586,1,"单选题","（2015年真题）根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013）规定，关于土方的项目列项或上程量计算正确的为（）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","建筑物场地厚度为350mm挖土应按平整场地项目列项",false,{"key":16,"text":17,"correct":14},"B","挖一般土方的工程量通常按开挖虚方体积计算",{"key":19,"text":20,"correct":21},"C","基础土方开挖需区分沟槽、基坑和一般土方项目分别列项",true,{"key":23,"text":24,"correct":14},"D","冻土开挖工程量需按虚方体积计算","本题考查的是土石方工程。厚度>±300mm的竖向布置挖土或山坡切土应按一般土方项目编码列项，固A错误。挖一般土方按设计图示尺寸以体积计算，固B错误。冻土按设计图示尺寸开挖面积乘以厚度以体积计算，固D错误。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]