[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907115":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},907115,586,1,"单选题","（2019年真题）关于深基坑土方开挖采用冻结排桩法支护技术,下列说法正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","冻结管应置于排桩外侧",true,{"key":16,"text":17,"correct":18},"B","卸压孔应置于冻结管和排桩之间",false,{"key":20,"text":21,"correct":18},"C","冻结墙的主要作用是支撑土体",{"key":23,"text":24,"correct":18},"D","排桩的主要作用是隔水","选项B，排桩外侧按设计要求施做一排冻结孔，同时在冻结孔外侧据其中心一定位置处插花布设多个卸压孔；选项CD，该技术是以含水地层冻结形成的隔水帷幕墙为基坑的封水结构，以基坑内排桩支撑系统为抵抗水土压力的受力结构，充分发拝各自的优势特点，以满足大基坑围护要求。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]