[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-907092":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},907092,586,1,"单选题","（2019年真题）关于桥梁上部结构顶推法施工特点,下列说法正确的是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","减少高空作业,无须大型起重设备",true,{"key":16,"text":17,"correct":18},"B","施工材料用量少,施工难度小",false,{"key":20,"text":21,"correct":18},"C","适宜于大跨在桥梁施工",{"key":23,"text":24,"correct":18},"D","施工周期短,但施工费用高","顶推法施工的特点： 1)顶推法可以使用简单的设备建造长大桥梁，施工费用低，施工平稳无噪声，可在水深、山谷和高桥墩上采用，也可在曲率相同的弯桥和坡桥上使用。 2)主梁分段预制，连续作业，结构整体性好;由于不需要大型起重设备，所以施工节段的长度一般可取用1O~20m。 4)顶推施工时，用钢量较高。 5)顶推法宜在等截面梁上使用。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]