[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906768":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},906768,586,1,"单选题","关于现浇混凝土钢筋工程量计量的说法，错误的是（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","工程量应区分钢筋种类、规格，按设计图示钢筋（网）长度（面积）乘以单位理论质量计算",false,{"key":16,"text":17,"correct":14},"B","现浇构件中伸出构件的锚固钢筋应并入钢筋工程量内",{"key":19,"text":20,"correct":21},"C","清单项目工作内容中综合了钢筋的机械连接，钢筋的焊接（绑扎）单独列项",true,{"key":23,"text":24,"correct":14},"D","设计图纸及规范要求未标明的，φ10以上的长钢筋按每9m一个接头","本题考查的是钢筋工程。现浇构件钢筋、预制构件钢筋、钢筋网片、钢筋笼。按设计图示钢筋（网）长度（面积）乘单位理论质量\"t\"计算。项目特征描述：钢筋种类、规格。钢筋的工作内容中包括了焊接（或绑扎）连接，不需要计量，在综合单价中考虑，但机械连接需要单独列项计算工程量。2020版教材P389-408",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]