[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906743":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},906743,586,1,"单选题","截（凿）桩头按设计桩截面乘以桩头长度以体积计算，单位：m3；或按设计图示（ ）计算。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","面积",false,{"key":16,"text":17,"correct":14},"B","体积",{"key":19,"text":20,"correct":21},"C","数量",true,{"key":23,"text":24,"correct":14},"D","质量","2020版教材P382 本题考查的是桩基础工程。截（凿）桩头，以\"m3\"计量，按设计桩截面乘以桩头长度以体积计算：以\"根\"计量，按设计图示数量计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]