[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906740":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},906740,586,1,"单选题","铺设土工合成材料，工程量按设计图示尺寸以（ ）计算。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","面积",true,{"key":16,"text":17,"correct":18},"B","体积",false,{"key":20,"text":21,"correct":18},"C","质量",{"key":23,"text":24,"correct":18},"D","铺设长度","2020版教材P378 本题考查的是地基处理与边坡支护工程。铺设土工合成材料工程量按设计图示尺寸以面积计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]