[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906723":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},906723,586,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》GB50854—2013，楼地面踢脚线工程量应（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","按设计图示中心线长度计算",false,{"key":16,"text":17,"correct":14},"B","按设计图示净长线长度计算",{"key":19,"text":20,"correct":14},"C","区分不同材料和规格以长度计算",{"key":22,"text":23,"correct":24},"D","按设计图示长度乘以高度以面积计算",true,"2020版教材P425 本题考查的是楼地面装饰工程。踢脚线包括水泥砂浆踢脚线、石材踢脚线、块料踢脚线、塑料板踢脚线、木质踢脚线、金属踢脚线、防静电踢脚线。工程量以“m2”计量，按设计图示长度乘高度以面积计算；以“m”计量，按延长米计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]