[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906548":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},906548,586,1,"单选题","先张法预应力混凝土构件施工，其工艺流程为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","支底模一支侧模一张拉钢筋一浇筑混凝土一养护、拆模一放张钢筋",false,{"key":16,"text":17,"correct":14},"B","支底模一张拉钢筋一支侧模一浇筑混凝土一放张钢筋一养护、拆模",{"key":19,"text":20,"correct":21},"C","支底模一预应力钢筋安放一张拉钢筋一支侧模一浇筑混凝土一拆模一放张钢筋",true,{"key":23,"text":24,"correct":14},"D","支底模一钢筋安放一支侧模一张拉钢筋一浇筑混凝土一放张钢筋一拆模","2020版教材P226 图4.1.27",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]