[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906512":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},906512,586,1,"单选题","对于大跨度的焊接球节点钢管网架的吊装，出于防火等考虑，一般选用（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","大跨度结构高空拼装法施工",false,{"key":16,"text":17,"correct":18},"B","大跨度结构整体吊装法施工",true,{"key":20,"text":21,"correct":14},"C","大跨度结构整体顶升法施工",{"key":23,"text":24,"correct":14},"D","大跨度结构滑移法施工","2020版教材P242 本题考查的是结构吊装工程施工。大跨度结构整体吊装法施工：整体吊升法是焊接球节点网架吊装的一种常用方法。它是在地面（单层建筑）或在网架设计位置的下层楼边上（多层建筑）将网架一次拼装成整体，然后采用吊升设备将网架整体吊升到设计位置就位固定。此法不需高大的拼装支架，高空作业少，易保证整体焊接质量，但需要大起重量的起重设备，技术较复杂，因此，此法较适合焊接球节点钢管网架。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]