[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906475":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},906475,586,1,"单选题","采用明排水法开挖基坑，在基坑开挖过程中设置的集水坑应（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","布置在基础范围以外",true,{"key":16,"text":17,"correct":18},"B","布置在基坑底部中央",false,{"key":20,"text":21,"correct":18},"C","布置在地下水走向的下游",{"key":23,"text":24,"correct":18},"D","经常低于挖土面1.0m以上","2020版教材P175 本题考查的是土石方工程施工技术。集水坑应设置在基础范围以外，地下水走向的上游。根据地下水量大小、基坑平面形状及水泵能力，集水坑每隔20~40m设置一个。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]