[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906449":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},906449,586,1,"单选题","在多层及高层、高耸钢结构安装中，宜划分多个流水作业段进行安装，每节流水段内柱的分节位置宜在梁顶标高以上（ ）m处。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","0．5～1．0",false,{"key":16,"text":17,"correct":18},"B","1．0～1．3",true,{"key":20,"text":21,"correct":14},"C","1．3～1．8",{"key":23,"text":24,"correct":14},"D","1．8～2．1","多层及高层钢结构宜划分多个流水作业段进行安装，流水段宜以每节框架为单位。流水段划分应符合下列规定：①流水段内的最重构件应在起重设备的起重能力范围内。②起重设备的爬升高度应满足下节流水段内构件的起吊高度。③每节流水段内的柱长度应根据工厂加工、运输堆放、现场吊装等因素确定。长度宜取2～3个楼层高度，分节位置宜在梁顶标高以上1.0～1.3m处。④流水段的划分应与混凝土结构施工相适应。⑤每节流水段可根据结构特点和现场条件在平面上划分流水区进行施工。 2020版教材P200-244",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]