[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906044":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},906044,586,1,"单选题","根据《建设工程工程量清单计价规范》（GB 50854-2013），预压地基的工程量计算应按（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设计图示以天然密实体积计算",false,{"key":16,"text":17,"correct":18},"B","设计图示处理范围以面积计算",true,{"key":20,"text":21,"correct":14},"C","设计不同孔径以孔数计算",{"key":23,"text":24,"correct":14},"D","设计不同孔深度以孔数计算","本题考查地基处理计算。根据《建设工程工程量清单计价规范》(GB 50854-2013)，按设计图示处理范围以面积计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]