[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906040":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},906040,586,1,"单选题","某管沟直埋工程，设计图示管道中心线长250m，水平最大宽度1．00m，管底外表面标高为-1．25m，地面平均标高为0．25m，埋管土壤为Ⅱ类土。根据《建设工程工程量清单计价规范》的有关规定，该管沟土方工程量为（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","312.5m3",true,{"key":16,"text":17,"correct":18},"B","312.5m",false,{"key":20,"text":21,"correct":18},"C","250m3",{"key":23,"text":24,"correct":18},"D","250m","本题考查管沟工程量的计算。V=250×1×1.25=312.5(m3)。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]