[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906024":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},906024,586,1,"单选题","根据《房屋建筑与装饰工程工程量计算规范》（GB50854-2013），关于管沟石方工程量计算，说法正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","按设计图示尺寸以管道中心线长度计算",true,{"key":16,"text":17,"correct":18},"B","按设计图示尺寸以截面积计算",false,{"key":20,"text":21,"correct":18},"C","有管沟设计时按管底以上部分体积计算",{"key":23,"text":24,"correct":18},"D","无管沟设计时按延长米计算","本题考查的是土石方工程计算规则与方法。按设计图示以管道中心线长度计算，单位：m；或按设计图示截面积乘以长度计算以体积计算，单位：m3。有管沟设计时，平均深度以沟垫层底面标高至交付施工场地标高计算；无管沟设计时，直埋管深度应按管底外表面标高至交付施工场地标高的平均高度计算。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]