[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906007":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},906007,586,1,"单选题","关于《建设工程工程量清单计价规范》的规则。正确的说法是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","单位工程计算通常按计价规范清单列项顺序进行",true,{"key":16,"text":17,"correct":18},"B","工程量计量单位可以采用扩大的物理计量单位",false,{"key":20,"text":21,"correct":18},"C","工程量应包括加工余量和合理损耗量",{"key":23,"text":24,"correct":18},"D","工程量计算对象是施工过程的全部项目","本题考查对计量规则的理解。单位工程计算通常按计价规范清单流向顺序进行。在清单计量中工程量计量单位是基本单位。在清单计量中工程量一般为施工图纸的净量，不考虑施工余量。在清单计量中工程量计算对象不包括施工过程中损耗，因此不能说工程量计算对象是施工过程的全部项目。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]