[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-906004":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},906004,586,1,"单选题","在同一合同段的工程量清单中，多个单位工程中具有相同项自特征的项目编码和计量单位时（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","项目编码不一致，计量单位不一致",false,{"key":16,"text":17,"correct":14},"B","项目编码一致，计量单位一致",{"key":19,"text":20,"correct":21},"C","项目编码不一致，计量单位一致",true,{"key":23,"text":24,"correct":14},"D","项目编码一致，计量单位不一致","本题考查的是清单项目编码和工程量计量单位的要求。项目编码前 9 位统一按规范编制，后 3 为有编制编制，不得有重码。计量单位应一致。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]