[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905758":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},905758,586,1,"单选题","(2017年)根据《房屋建筑与装饰工程工程量计算规范》(GE50854-2013),实心砖墙工程量计算正确的是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","凸出墙面的砖垛单独列项",false,{"key":16,"text":17,"correct":18},"B","框架梁间內墙按梁间墙体积计算",true,{"key":20,"text":21,"correct":14},"C","围墙扣除柱所占体积",{"key":23,"text":24,"correct":14},"D","平屋顶外墙算至钢筋混凝土板顶面","@##",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]