[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905684":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},905684,586,1,"单选题","(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)，当建筑物外墙砖基础垫层底宽为850mm，基槽挖土深度为1600mm，设计中心线长为40000mm，土层为三类土，放坡系数为1：0.33，则此外墙基础人工挖沟槽工程量应为()。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","34m3",false,{"key":16,"text":17,"correct":18},"B","54.4m3",true,{"key":20,"text":21,"correct":14},"C","88.2m3",{"key":23,"text":24,"correct":14},"D","113.8m3","挖沟槽土方及挖基坑土方按设计图示尺寸以基础垫层底面积乘以挖土深度计算，单位：m3。外墙基础人工挖沟槽工程量=0.85×1.6×40=54.4m3。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]