[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905683":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},905683,586,1,"单选题","(2013年)根据《房屋建筑与装饰工程工程量计算规范》(GB50854-2013)某建筑物首层建筑面积为2000㎡场地内有部分150mm以内的挖土用6.5T自卸汽车（斗容量4.5m3)运土，弃土共计20车，运距150m，则共平整场地的工程量应为()。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","69.2㎡",false,{"key":16,"text":17,"correct":14},"B","83.3㎡",{"key":19,"text":20,"correct":14},"C","90㎡",{"key":22,"text":23,"correct":24},"D","2000㎡",true,"土石方工程工程量计算时，平整场地按设计图示尺寸以建筑物首层建筑面积计算，单位：㎡。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]