[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905668":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},905668,586,1,"单选题","(2014年)根据《房屋建筑与装饰工程工程量计算规范》（GB 50854—2013）规定，下列说法正确的是（）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","分部分项工程量清单与定额所采用的计量单位相同",false,{"key":16,"text":17,"correct":14},"B","同一建设项目的多个单位工程的相同项目可采用不同的计量单位分别计量",{"key":19,"text":20,"correct":14},"C","以“m”、“㎡”、“m3”等为单位的应按四舍五入的原则取整",{"key":22,"text":23,"correct":24},"D","项目特征反映了分部分项和措施项目自身价值的本质特征",true,"项目特征是表征构成分部分项构成项目、措施项目自身价值的本质特征。 以“m”、“㎡”、“m3”等为单位，应保留小数点后两位数字，第三位小数四舍五入。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]