[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905597":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},905597,586,1,"单选题","(2017年)先张法预应力混凝土构件施工，其工艺流程为（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","支底模-支侧模-张拉钢筋-浇筑混凝土-养护、拆模-放张钢筋",false,{"key":16,"text":17,"correct":14},"B","支底模-张拉钢筋-支侧模-浇筑混凝土-放张钢筋-养护、拆模",{"key":19,"text":20,"correct":21},"C","支底模-预应力钢筋安放-张拉钢筋-支侧模-浇混凝土-拆模-放张钢筋",true,{"key":23,"text":24,"correct":14},"D","支底模-钢筋安放-支侧模-张拉钢筋-浇筑混凝士-放张钢筋-拆模","本题考查的是预应力混凝土工程施工。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]