[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905395":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},905395,586,1,"单选题","(2014年)对地下工程围岩出现的拉应力区多采用的加固措施是（）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","混凝土支撑",false,{"key":16,"text":17,"correct":18},"B","锚杆支护",true,{"key":20,"text":21,"correct":14},"C","喷混凝土",{"key":23,"text":24,"correct":14},"D","挂网喷混凝土","(1)支撑与衬砌。支撑是在地下工程开挖过程中用以稳定围岩用的临时性措施。按照选用材料的不同，有木支撑、钢支撑及混凝土支撑等。在不太稳定的岩体中开挖，需及时支撑以防止围岩早期松动。 (2)喷锚支护。喷锚支护是在地下工程开挖后，及时地向围岩表面喷一薄层混凝土（一般厚度为5～20cm)，有时再增加一些锚杆，从而部分地阻止围岩向洞内变形，以达到支护的目的。",{"id":6,"name":27,"category":28,"favorite":29},"建设工程技术与计量（土建）","建筑工程",0]