[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-585-9":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":606},{"id":5,"name":6,"category":7,"favorite":8},585,"建设工程技术与计量（水利）","建筑工程",0,9,50,1200,[13,34,45,53,65,77,89,101,113,125,137,149,161,173,185,194,206,218,230,242,254,266,278,290,302,314,326,338,350,362,374,386,398,410,422,434,443,455,467,479,489,498,510,522,534,546,558,570,582,594],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":30,"analysis":33},904569,1,"单选题","三级的混凝土坝、浆砌石坝，级别提高一级时其坝高应超过（ ）。",[19,23,26,29],{"key":20,"text":21,"correct":22},"A","70m",false,{"key":24,"text":25,"correct":22},"B","80m",{"key":27,"text":28,"correct":22},"C","90m",{"key":30,"text":31,"correct":32},"D","100m",true,"",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},904570,"水库工程中最大高度超过（ ）的大坝建筑物，其级别应为Ⅰ级。",[38,39,41,43],{"key":20,"text":31,"correct":22},{"key":24,"text":40,"correct":32},"200m",{"key":27,"text":42,"correct":22},"300m",{"key":30,"text":44,"correct":22},"400m",{"id":46,"libraryId":5,"type":15,"typeLabel":16,"stem":47,"options":48,"answer":24,"analysis":33},904571,"水库工程中最大高度超过（ ）的大坝建筑物，其级别应为1级。",[49,50,51,52],{"key":20,"text":31,"correct":22},{"key":24,"text":40,"correct":32},{"key":27,"text":42,"correct":22},{"key":30,"text":44,"correct":22},{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":24,"analysis":33},904572,"拱坝坝址的地基处理措施不包括（ ）。",[57,59,61,63],{"key":20,"text":58,"correct":22},"固结灌浆和接触灌浆",{"key":24,"text":60,"correct":32},"基坑排水",{"key":27,"text":62,"correct":22},"断层破碎带处理",{"key":30,"text":64,"correct":22},"防渗帷幕",{"id":66,"libraryId":5,"type":15,"typeLabel":16,"stem":67,"options":68,"answer":24,"analysis":33},904573,"拱坝的特点不包括（ ）。",[69,71,73,75],{"key":20,"text":70,"correct":22},"拱坝对坝址地形地质条件要求较高",{"key":24,"text":72,"correct":32},"抗震性能差",{"key":27,"text":74,"correct":22},"超载能力强，安全度高",{"key":30,"text":76,"correct":22},"坝身泄流布置复杂",{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":20,"analysis":33},904574,"下列关于正常溢洪道的说法错误的是（ ）。",[81,83,85,87],{"key":20,"text":82,"correct":32},"仅适用于拦河坝为土石坝的大型水利枢纽",{"key":24,"text":84,"correct":22},"采用薄拱坝或轻型支墩坝的水利枢纽",{"key":27,"text":86,"correct":22},"一般以堰流方式泄水",{"key":30,"text":88,"correct":22},"泄洪水头较高或流量较大时考虑布置坝外河岸溢洪道",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":24,"analysis":33},904575,"重力坝坝轴线一般布置成（ ）。",[93,95,97,99],{"key":20,"text":94,"correct":22},"曲线",{"key":24,"text":96,"correct":32},"直线",{"key":27,"text":98,"correct":22},"折线",{"key":30,"text":100,"correct":22},"抛物线",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":27,"analysis":33},904576,"重力坝的构造设计不包括（ ）。",[105,107,109,111],{"key":20,"text":106,"correct":22},"坝顶结构",{"key":24,"text":108,"correct":22},"廊道布置",{"key":27,"text":110,"correct":32},"坡度",{"key":30,"text":112,"correct":22},"坝体分缝",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":20,"analysis":33},904577,"利用预加应力措施来增加坝体上游部分的压应力，提高抗滑稳定性，从而可以削减坝体剖面的是（ ）。",[117,119,121,123],{"key":20,"text":118,"correct":32},"预应力锚固重力坝",{"key":24,"text":120,"correct":22},"空腹重力坝",{"key":27,"text":122,"correct":22},"实体重力坝",{"key":30,"text":124,"correct":22},"宽缝重力坝",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":24,"analysis":33},904578,"横缝的间距一般为（ ）。",[129,131,133,135],{"key":20,"text":130,"correct":22},"10～15m",{"key":24,"text":132,"correct":32},"15～20m",{"key":27,"text":134,"correct":22},"20～30m",{"key":30,"text":136,"correct":22},"5～10m",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":27,"analysis":33},904579,"混凝土面板堆石坝的特点不包括（ ）。",[141,143,145,147],{"key":20,"text":142,"correct":22},"具有很好的抗渗稳定性",{"key":24,"text":144,"correct":22},"防渗面板与堆石施工没有干扰，且不受雨季影响",{"key":27,"text":146,"correct":32},"施工速度慢，工期长",{"key":30,"text":148,"correct":22},"具有良好的抗滑稳定性",{"id":150,"libraryId":5,"type":15,"typeLabel":16,"stem":151,"options":152,"answer":27,"analysis":33},904580,"在混凝土重力坝内，下列哪种情况下不须设置廊道（ ）",[153,155,157,159],{"key":20,"text":154,"correct":22},"进行帷幕灌浆",{"key":24,"text":156,"correct":22},"操作闸门或铺设风、水、电线路",{"key":27,"text":158,"correct":32},"坝体排水",{"key":30,"text":160,"correct":22},"坝内交通运输以及检查维修",{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":20,"analysis":33},904582,"混凝土重力坝坝体混凝土抗压设计龄期一般采用（ ）。",[165,167,169,171],{"key":20,"text":166,"correct":32},"90d",{"key":24,"text":168,"correct":22},"80d",{"key":27,"text":170,"correct":22},"100d",{"key":30,"text":172,"correct":22},"28d",{"id":174,"libraryId":5,"type":15,"typeLabel":16,"stem":175,"options":176,"answer":30,"analysis":33},904583,"重力坝与其他坝型相比的特点不包括（ ）。",[177,179,181,183],{"key":20,"text":178,"correct":22},"对地形地质条件适应性较好，几乎任何形状的河谷都可以修建重力坝",{"key":24,"text":180,"correct":22},"重力坝断面尺寸大，安全可靠",{"key":27,"text":182,"correct":22},"各坝段分开，结构作用明确",{"key":30,"text":184,"correct":32},"重力坝的抗冲能力弱",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":27,"analysis":33},904584,"下列不属于重力坝按结构型式分类的是（ ）。",[189,190,191,193],{"key":20,"text":122,"correct":22},{"key":24,"text":120,"correct":22},{"key":27,"text":192,"correct":32},"混凝土重力坝",{"key":30,"text":118,"correct":22},{"id":195,"libraryId":5,"type":15,"typeLabel":16,"stem":196,"options":197,"answer":24,"analysis":33},904585,"对于有抗磨要求的混凝土，采用高强度等级硅酸盐水泥所拌制的混凝土，其抗压强度等级不应低于（ ）。",[198,200,202,204],{"key":20,"text":199,"correct":22},"C10",{"key":24,"text":201,"correct":32},"C20",{"key":27,"text":203,"correct":22},"C30",{"key":30,"text":205,"correct":22},"C40",{"id":207,"libraryId":5,"type":15,"typeLabel":16,"stem":208,"options":209,"answer":30,"analysis":33},904586,"温度裂缝的防治措施不包括（ ）。",[210,212,214,216],{"key":20,"text":211,"correct":22},"减少混凝土的发热量",{"key":24,"text":213,"correct":22},"加速混凝土热量散发",{"key":27,"text":215,"correct":22},"进行混凝土块表面保护",{"key":30,"text":217,"correct":32},"提高混凝土的入仓温度",{"id":219,"libraryId":5,"type":15,"typeLabel":16,"stem":220,"options":221,"answer":30,"analysis":33},904587,"纵缝的布置型式不包括（ ）。",[222,224,226,228],{"key":20,"text":223,"correct":22},"斜缝",{"key":24,"text":225,"correct":22},"垂直纵缝",{"key":27,"text":227,"correct":22},"错缝",{"key":30,"text":229,"correct":32},"通缝",{"id":231,"libraryId":5,"type":15,"typeLabel":16,"stem":232,"options":233,"answer":24,"analysis":33},904588,"错缝浇筑块的高度一般为（ ）。",[234,236,238,240],{"key":20,"text":235,"correct":22},"1～2m",{"key":24,"text":237,"correct":32},"3～4m",{"key":27,"text":239,"correct":22},"4～5m",{"key":30,"text":241,"correct":22},"6～7m",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":24,"analysis":33},904589,"基础灌浆廊道纵向坡度一般不宜陡于（ ）。",[246,248,250,252],{"key":20,"text":247,"correct":22},"30°～35°",{"key":24,"text":249,"correct":32},"40°～45°",{"key":27,"text":251,"correct":22},"30°～45°",{"key":30,"text":253,"correct":22},"20°～35°",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":24,"analysis":33},904590,"检查排水廊道的廊道最小宽度为（ ）。",[258,260,262,264],{"key":20,"text":259,"correct":22},"1.0m",{"key":24,"text":261,"correct":32},"1.2m",{"key":27,"text":263,"correct":22},"1.4m",{"key":30,"text":265,"correct":22},"1.6m",{"id":267,"libraryId":5,"type":15,"typeLabel":16,"stem":268,"options":269,"answer":30,"analysis":33},904591,"关于碾压混凝土的特点，下列说法错误的是（ ）。",[270,272,274,276],{"key":20,"text":271,"correct":22},"抗冻性能比常态混凝土差",{"key":24,"text":273,"correct":22},"抗渗性能比常态混凝土差",{"key":27,"text":275,"correct":22},"单位体积用水量少",{"key":30,"text":277,"correct":32},"单位体积胶凝材料用量多",{"id":279,"libraryId":5,"type":15,"typeLabel":16,"stem":280,"options":281,"answer":20,"analysis":33},904592,"土石坝的特点不包括（ ）。",[282,284,286,288],{"key":20,"text":283,"correct":32},"适应地基变形的能力弱",{"key":24,"text":285,"correct":22},"坝材料能就地取材，材料运输成本低",{"key":27,"text":287,"correct":22},"构造简单，施工技术容易掌握，便于机械化施工",{"key":30,"text":289,"correct":22},"运用管理方便，工作可靠，寿命长，维修加固和扩建均较容易",{"id":291,"libraryId":5,"type":15,"typeLabel":16,"stem":292,"options":293,"answer":27,"analysis":33},904593,"土石坝的工作条件不需要考虑（ ）。",[294,296,298,300],{"key":20,"text":295,"correct":22},"渗流影响",{"key":24,"text":297,"correct":22},"冲刷影响",{"key":27,"text":299,"correct":32},"地形影响",{"key":30,"text":301,"correct":22},"沉陷影响",{"id":303,"libraryId":5,"type":15,"typeLabel":16,"stem":304,"options":305,"answer":24,"analysis":33},904594,"土质心墙顶部高程应高于正常运用情况下的静水位（ ）。",[306,308,310,312],{"key":20,"text":307,"correct":22},"0.1～0.2m",{"key":24,"text":309,"correct":32},"0.3～0.6m",{"key":27,"text":311,"correct":22},"0.3～0.5m",{"key":30,"text":313,"correct":22},"0.4～0.6m",{"id":315,"libraryId":5,"type":15,"typeLabel":16,"stem":316,"options":317,"answer":20,"analysis":33},904595,"Ⅰ型反滤的反滤层位于被保护土的（ ）。",[318,320,322,324],{"key":20,"text":319,"correct":32},"下部",{"key":24,"text":321,"correct":22},"上部",{"key":27,"text":323,"correct":22},"中部",{"key":30,"text":325,"correct":22},"底部",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":27,"analysis":33},904596,"土石坝设置坝身排水的目的不包括（ ）。",[330,332,334,336],{"key":20,"text":331,"correct":22},"防止渗流逸出处的渗透变形",{"key":24,"text":333,"correct":22},"改变渗流方向，增加坝体稳定",{"key":27,"text":335,"correct":32},"提高坝体浸润线及孔隙压力",{"key":30,"text":337,"correct":22},"防止下游波浪对坝坡的冲刷及冻胀破坏",{"id":339,"libraryId":5,"type":15,"typeLabel":16,"stem":340,"options":341,"answer":27,"analysis":33},904597,"护坡的范围对上游面应由坝顶至最低水位以下（ ）左右。",[342,344,346,348],{"key":20,"text":343,"correct":22},"1.5m",{"key":24,"text":345,"correct":22},"2.0m",{"key":27,"text":347,"correct":32},"2.5m",{"key":30,"text":349,"correct":22},"3.0m",{"id":351,"libraryId":5,"type":15,"typeLabel":16,"stem":352,"options":353,"answer":24,"analysis":33},904598,"为便于排除坝顶雨水，坝顶路面常设直线或折线形横坡，坡度宜采用（ ）。",[354,356,358,360],{"key":20,"text":355,"correct":22},"1%～2%",{"key":24,"text":357,"correct":32},"2%～3%",{"key":27,"text":359,"correct":22},"3%～4%",{"key":30,"text":361,"correct":22},"5%～6%",{"id":363,"libraryId":5,"type":15,"typeLabel":16,"stem":364,"options":365,"answer":27,"analysis":33},904599,"拱坝坝顶，当无交通要求时，非溢流坝顶宽度一般应不小于（ ）。",[366,368,370,372],{"key":20,"text":367,"correct":22},"1m",{"key":24,"text":369,"correct":22},"2m",{"key":27,"text":371,"correct":32},"3m",{"key":30,"text":373,"correct":22},"4m",{"id":375,"libraryId":5,"type":15,"typeLabel":16,"stem":376,"options":377,"answer":27,"analysis":33},904600,"下列不属于隧洞类型按承担任务划分的是（ ）。",[378,380,382,384],{"key":20,"text":379,"correct":22},"泄水隧洞",{"key":24,"text":381,"correct":22},"输水隧洞",{"key":27,"text":383,"correct":32},"有压隧洞",{"key":30,"text":385,"correct":22},"放空隧洞",{"id":387,"libraryId":5,"type":15,"typeLabel":16,"stem":388,"options":389,"answer":30,"analysis":33},904601,"下列对水工隧洞深孔进口的说法错误的是（ ）。",[390,392,394,396],{"key":20,"text":391,"correct":22},"竖井式进口适用于河岸岩石坚固、竖井开挖不致坍塌的情况",{"key":24,"text":393,"correct":22},"斜坡式进口是在较为完整的岩坡上进行平整开挖、衬砌而成的进口结构",{"key":27,"text":395,"correct":22},"当进口处岸坡覆盖层较厚或岩石破碎时，可考虑用塔式进口",{"key":30,"text":397,"correct":32},"竖井式进口抗震及稳定性较差",{"id":399,"libraryId":5,"type":15,"typeLabel":16,"stem":400,"options":401,"answer":24,"analysis":33},904602,"下列对水工隧洞洞身衬砌构造的说法错误的是（ ）。",[402,404,406,408],{"key":20,"text":403,"correct":22},"保证围岩稳定，承受山岩压力、内水压力及其他荷载",{"key":24,"text":405,"correct":32},"会增加水头损失",{"key":27,"text":407,"correct":22},"防止水流、空气、温度和湿度变化等因素对围岩的冲刷、风化、侵蚀等破坏",{"key":30,"text":409,"correct":22},"防止隧洞漏水",{"id":411,"libraryId":5,"type":15,"typeLabel":16,"stem":412,"options":413,"answer":24,"analysis":33},904603,"下列不属于水电站厂房设备系统的是（ ）。",[414,416,418,420],{"key":20,"text":415,"correct":22},"水流系统",{"key":24,"text":417,"correct":32},"电压系统",{"key":27,"text":419,"correct":22},"电气控制设备系统",{"key":30,"text":421,"correct":22},"机械控制设备系统",{"id":423,"libraryId":5,"type":15,"typeLabel":16,"stem":424,"options":425,"answer":27,"analysis":33},904604,"通航500t的船舶，其航道等级为（ ）。",[426,428,430,432],{"key":20,"text":427,"correct":22},"Ⅱ",{"key":24,"text":429,"correct":22},"Ⅲ",{"key":27,"text":431,"correct":32},"Ⅳ",{"key":30,"text":433,"correct":22},"V",{"id":435,"libraryId":5,"type":15,"typeLabel":16,"stem":436,"options":437,"answer":20,"analysis":33},904605,"设计最大通航船舶吨位为1000t时，升船机级别为（ ）。",[438,439,440,441],{"key":20,"text":429,"correct":32},{"key":24,"text":431,"correct":22},{"key":27,"text":433,"correct":22},{"key":30,"text":442,"correct":22},"Ⅵ",{"id":444,"libraryId":5,"type":15,"typeLabel":16,"stem":445,"options":446,"answer":24,"analysis":33},904606,"承船厢或承船车装载船舶总吨级大小在1000t级及以上的属于（ ）。",[447,449,451,453],{"key":20,"text":448,"correct":22},"特大型升船机",{"key":24,"text":450,"correct":32},"大型升船机",{"key":27,"text":452,"correct":22},"中型升船机",{"key":30,"text":454,"correct":22},"小型升船机",{"id":456,"libraryId":5,"type":15,"typeLabel":16,"stem":457,"options":458,"answer":24,"analysis":33},904607,"下列关于鱼道的说法错误的是（ ）。",[459,461,463,465],{"key":20,"text":460,"correct":22},"由进口、槽身、出口及诱鱼补水系统等几部分组成",{"key":24,"text":462,"correct":32},"水池式鱼道适用于水位差不大和鱼类活力强劲的情况",{"key":27,"text":464,"correct":22},"诱鱼补水系统利用鱼类逆水而游的习性，用水流来引诱鱼类进入鱼道",{"key":30,"text":466,"correct":22},"隔板式鱼道水流条件较好，适应水头较大",{"id":468,"libraryId":5,"type":15,"typeLabel":16,"stem":469,"options":470,"answer":27,"analysis":33},904608,"坝体其他部位按水力坡降考虑时，当水力坡降10≤Ⅰ＜30时，大坝混凝土抗渗等级的最小允许值为（ ）。",[471,473,475,477],{"key":20,"text":472,"correct":22},"W2",{"key":24,"text":474,"correct":22},"W4",{"key":27,"text":476,"correct":32},"W6",{"key":30,"text":478,"correct":22},"W8",{"id":480,"libraryId":5,"type":15,"typeLabel":16,"stem":481,"options":482,"answer":20,"analysis":33},904609,"排水管至上游坝面的距离不小于（ ）。",[483,484,485,487],{"key":20,"text":369,"correct":32},{"key":24,"text":371,"correct":22},{"key":27,"text":486,"correct":22},"5m",{"key":30,"text":488,"correct":22},"6m",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},904610,"为了防止心墙冻裂，顶部应设砂性土保护层，其厚度不小于（ ）。",[493,494,495,496],{"key":20,"text":259,"correct":32},{"key":24,"text":345,"correct":22},{"key":27,"text":349,"correct":22},{"key":30,"text":497,"correct":22},"4.0m",{"id":499,"libraryId":5,"type":15,"typeLabel":16,"stem":500,"options":501,"answer":24,"analysis":33},904611,"斜墙上游坡应满足稳定要求，其内坡一般不陡于（ ）。",[502,504,506,508],{"key":20,"text":503,"correct":22},"1∶3",{"key":24,"text":505,"correct":32},"1∶2",{"key":27,"text":507,"correct":22},"1∶5",{"key":30,"text":509,"correct":22},"1∶4",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":24,"analysis":33},904612,"拱坝坝体混凝土的水灰比应限制在（ ）。",[514,516,518,520],{"key":20,"text":515,"correct":22},"0.35～0.45",{"key":24,"text":517,"correct":32},"0.45～0.55",{"key":27,"text":519,"correct":22},"0.25～0.35",{"key":30,"text":521,"correct":22},"0.25～0.45",{"id":523,"libraryId":5,"type":15,"typeLabel":16,"stem":524,"options":525,"answer":20,"analysis":33},904613,"关于泄水隧洞的消能设施，下列说法错误的是（ ）。",[526,528,530,532],{"key":20,"text":527,"correct":32},"只适于有压洞",{"key":24,"text":529,"correct":22},"当有压泄水洞洞径不大时，可以考虑在出口装设射流阀门",{"key":27,"text":531,"correct":22},"平台扩散水跃消能常用于有压或无压泄水隧洞",{"key":30,"text":533,"correct":22},"为减小进入尾水渠的单宽流量，有时可将消力池及其下游段也继续取扩散式",{"id":535,"libraryId":5,"type":15,"typeLabel":16,"stem":536,"options":537,"answer":27,"analysis":33},904614,"关于水电站厂区布置原则的说法错误的是（ ）。",[538,540,542,544],{"key":20,"text":539,"correct":22},"考虑厂区消防、排水及检修的必要条件",{"key":24,"text":541,"correct":22},"少占或不占用农田，保护天然植被、生态环境和文物",{"key":27,"text":543,"correct":32},"无需进行建筑艺术处理",{"key":30,"text":545,"correct":22},"统筹安排运行管理所必需的生产辅助设施",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":20,"analysis":33},904615,"关于地下式厂房，下列说法正确的是（ ）。",[550,552,554,556],{"key":20,"text":551,"correct":32},"可以选择地质条件较好的区域，厂房布置比较灵活",{"key":24,"text":553,"correct":22},"会增加水轮机安装高程",{"key":27,"text":555,"correct":22},"与大坝等其他建筑物的施工干扰多",{"key":30,"text":557,"correct":22},"受雨、雪、酷暑、严寒等外界气候的影响",{"id":559,"libraryId":5,"type":15,"typeLabel":16,"stem":560,"options":561,"answer":30,"analysis":33},904616,"厂房按结构特征及布置分类不包括（ ）。",[562,564,566,568],{"key":20,"text":563,"correct":22},"坝后式厂房",{"key":24,"text":565,"correct":22},"河床式厂房",{"key":27,"text":567,"correct":22},"地下式厂房",{"key":30,"text":569,"correct":32},"户内式厂房",{"id":571,"libraryId":5,"type":15,"typeLabel":16,"stem":572,"options":573,"answer":20,"analysis":33},904617,"泵房的地面高于进水池的最高水位，通风、采光和防潮条件都比较好，施工容易，中小型泵站最常采用的结构型式是（ ）。",[574,576,578,580],{"key":20,"text":575,"correct":32},"分基型泵房",{"key":24,"text":577,"correct":22},"干室型泵房",{"key":27,"text":579,"correct":22},"湿室型泵房",{"key":30,"text":581,"correct":22},"块基型泵房",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":27,"analysis":33},904618,"常建于河道的一侧，在洪峰到来时使河道暂时不能容纳的多余洪水进入预定的蓄洪洼地或湖泊等区，及时削减洪峰的是（ ）。",[586,588,590,592],{"key":20,"text":587,"correct":22},"泄水闸",{"key":24,"text":589,"correct":22},"挡潮闸",{"key":27,"text":591,"correct":32},"分洪闸",{"key":30,"text":593,"correct":22},"排水闸",{"id":595,"libraryId":5,"type":15,"typeLabel":16,"stem":596,"options":597,"answer":24,"analysis":33},904619,"下列关于渡槽的说法不正确的是（ ）。",[598,600,602,604],{"key":20,"text":599,"correct":22},"渡槽进、出口段常做成扭曲面或喇叭形的渐变段过渡",{"key":24,"text":601,"correct":32},"渡槽槽身横断面形态多为梯形",{"key":27,"text":603,"correct":22},"渡槽进、出口段的功用是使渡槽与上下游渠道平顺连接，保持水流顺畅",{"key":30,"text":605,"correct":22},"槽身的支承结构形式主要有梁式、拱式和桁架拱式三类",[607,610,613,616,619,622],{"id":15,"name":608,"category":7,"favorite":609},"领导干部任职前廉政法规知识测试题",92,{"id":611,"name":612,"category":7,"favorite":15},595,"建筑结构与设备",{"id":614,"name":615,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":617,"name":618,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":620,"name":621,"category":7,"favorite":8},534,"BIM工程师",{"id":623,"name":621,"category":7,"favorite":8},535]