[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-585-23":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":738},{"id":5,"name":6,"category":7,"favorite":8},585,"建设工程技术与计量（水利）","建筑工程",0,23,50,1200,[13,38,53,68,77,92,107,122,137,152,167,182,196,210,224,239,254,268,283,298,312,326,340,354,369,383,397,411,425,440,454,468,482,496,510,524,539,553,567,582,596,611,625,640,654,668,682,696,710,724],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},905278,2,"多选题","分段围堰法导流适用于（ ）的工程。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","河床宽",true,{"key":24,"text":25,"correct":26},"B","河床窄",false,{"key":28,"text":29,"correct":22},"C","流量大",{"key":31,"text":32,"correct":26},"D","流量小",{"key":34,"text":35,"correct":22},"E","工期较长","ACE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},905279,"钢板桩格型围堰得以广泛应用的原因包括（ ）。",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"边坡垂直且断面大",{"key":24,"text":45,"correct":22},"修建和拆除可以高度机械化",{"key":28,"text":47,"correct":22},"钢板桩的回收率高",{"key":31,"text":49,"correct":22},"占地少并且安全可靠",{"key":34,"text":51,"correct":26},"造价低","BCD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},905280,"关于河道截流的基本方法，下列说法正确的有（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"平堵法截流时龙口的单宽流量较小",{"key":24,"text":60,"correct":22},"立堵法截流时龙口的单宽流量较大",{"key":28,"text":62,"correct":26},"平堵法不需要在龙口架设浮桥或栈桥",{"key":31,"text":64,"correct":22},"立堵法准备工作比较简单，费用较低",{"key":34,"text":66,"correct":22},"平堵法截流通常适用在软基河床上","ABDE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":36,"analysis":37},905281,"分期围堰法导流适用于（ ）的工程。",[72,73,74,75,76],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"key":28,"text":29,"correct":22},{"key":31,"text":32,"correct":26},{"key":34,"text":35,"correct":22},{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":91,"analysis":37},905282,"关于基坑排水与封堵蓄水，下列说法错误的有（ ）。",[81,83,85,87,89],{"key":20,"text":82,"correct":22},"管井法降水一般用于渗透系数为15～150m\u002Fd的粗、中砂土",{"key":24,"text":84,"correct":26},"一台高压水泵最适宜的降低水位范围为5～18m",{"key":28,"text":86,"correct":26},"压气扬水井点降低地下水最大可达40m",{"key":31,"text":88,"correct":26},"导流临时泄水建筑物，在蓄水时都要进行封堵",{"key":34,"text":90,"correct":22},"喷射井点，一般用于渗透系数为4～50m\u002Fd、渗流量不大的场合","AE",{"id":93,"libraryId":5,"type":15,"typeLabel":16,"stem":94,"options":95,"answer":106,"analysis":37},905283,"全段围堰法导流按其导流泄水建筑物的类型可分为（ ）。",[96,98,100,102,104],{"key":20,"text":97,"correct":22},"明渠导流",{"key":24,"text":99,"correct":26},"束窄河床",{"key":28,"text":101,"correct":22},"隧洞导流",{"key":31,"text":103,"correct":22},"涵管导流",{"key":34,"text":105,"correct":26},"分段分期","ACD",{"id":108,"libraryId":5,"type":15,"typeLabel":16,"stem":109,"options":110,"answer":121,"analysis":37},905284,"与露天开挖爆破比较，地下洞室岩石开挖爆破施工的特点包括（ ）。",[111,113,115,117,119],{"key":20,"text":112,"correct":22},"施工场面受到限制，施工难度大",{"key":24,"text":114,"correct":22},"岩石爆破的单位耗药量大",{"key":28,"text":116,"correct":26},"爆破集中且多",{"key":31,"text":118,"correct":22},"爆破质量要求高",{"key":34,"text":120,"correct":26},"破碎岩石的难度小","ABD",{"id":123,"libraryId":5,"type":15,"typeLabel":16,"stem":124,"options":125,"answer":136,"analysis":37},905285,"机械式顶管按照顶进方式，包括下列哪些施工方法？（ ）",[126,128,130,132,134],{"key":20,"text":127,"correct":26},"吊罐法",{"key":24,"text":129,"correct":22},"土压平衡法",{"key":28,"text":131,"correct":26},"爬罐法",{"key":31,"text":133,"correct":22},"泥水平衡法",{"key":34,"text":135,"correct":26},"反井钻机法","BD",{"id":138,"libraryId":5,"type":15,"typeLabel":16,"stem":139,"options":140,"answer":151,"analysis":37},905286,"关于平洞，下列说法错误的有（ ）。",[141,143,145,147,149],{"key":20,"text":142,"correct":22},"坡度小于15%的隧洞称为平洞",{"key":24,"text":144,"correct":22},"平洞按功能可分为勘探洞、施工支洞和主体洞",{"key":28,"text":146,"correct":26},"断面面积为60m2，等效直径为8m的平洞为大断面平洞",{"key":31,"text":148,"correct":26},"勘探洞一般不作永久支护",{"key":34,"text":150,"correct":22},"不过水洞可做临时性支护","ABE",{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":166,"analysis":37},905287,"平洞开挖的方法包括（ ）。",[156,158,160,162,164],{"key":20,"text":157,"correct":22},"全断面开挖方式",{"key":24,"text":159,"correct":26},"竖向分段开挖",{"key":28,"text":161,"correct":22},"先导洞后扩大开挖方式",{"key":31,"text":163,"correct":22},"台阶扩大开挖方式",{"key":34,"text":165,"correct":22},"分部分块开挖方式","ACDE",{"id":168,"libraryId":5,"type":15,"typeLabel":16,"stem":169,"options":170,"answer":181,"analysis":37},905288,"土料压实方法主要要求包括（ ）。",[171,173,175,177,179],{"key":20,"text":172,"correct":22},"错距法压实",{"key":24,"text":174,"correct":22},"碾压方向",{"key":28,"text":176,"correct":22},"分段碾压碾迹搭接宽度",{"key":31,"text":178,"correct":22},"碾压行车速度",{"key":34,"text":180,"correct":26},"碾压次数","ABCD",{"id":183,"libraryId":5,"type":15,"typeLabel":16,"stem":184,"options":185,"answer":67,"analysis":37},905289,"振动碾压与静压碾压相比具有哪些特点？（ ）",[186,188,190,192,194],{"key":20,"text":187,"correct":22},"质量轻",{"key":24,"text":189,"correct":22},"体积小",{"key":28,"text":191,"correct":26},"碾压遍数多",{"key":31,"text":193,"correct":22},"深度大",{"key":34,"text":195,"correct":22},"效率高",{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":166,"analysis":37},905290,"关于各区料的填筑顺序以及填筑要点，下列说法错误的有（ ）。",[200,202,204,206,208],{"key":20,"text":201,"correct":22},"各区料的填筑顺序优先采用“先细后粗”法",{"key":24,"text":203,"correct":26},"主次堆石区填筑时，采用进占法填筑",{"key":28,"text":205,"correct":22},"垫层区填筑时上游边线水平超宽15～30cm",{"key":31,"text":207,"correct":22},"垫层区碾压时逆坝轴线方向行驶，振动碾距上游边缘的距离不宜小于40cm",{"key":34,"text":209,"correct":22},"各区料填筑时，卸料的堆与堆之间留0.5m左右的间隙",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":166,"analysis":37},905291,"在大中型水利水电工程中，料场开采前需要进行的准备工作包括（ ）。",[214,216,218,220,222],{"key":20,"text":215,"correct":22},"划定料场范围",{"key":24,"text":217,"correct":26},"确定开采工艺",{"key":28,"text":219,"correct":22},"设置排水系统",{"key":31,"text":221,"correct":22},"修建施工道路",{"key":34,"text":223,"correct":22},"分期分区清理覆盖层",{"id":225,"libraryId":5,"type":15,"typeLabel":16,"stem":226,"options":227,"answer":238,"analysis":37},905292,"关于钢筋的加工及安装工程，下列说法错误的有（ ）。",[228,230,232,234,236],{"key":20,"text":229,"correct":26},"钢筋代换应按钢筋承载力设计值相等的原则进行",{"key":24,"text":231,"correct":22},"高级钢筋代换低级钢筋时，宜采用改变钢筋根数的方法来减少钢筋截面积",{"key":28,"text":233,"correct":22},"用同钢号某直径钢筋代替另一种直径的钢筋时，直径变化范围不宜超过3mm",{"key":31,"text":235,"correct":26},"用冷拉方法调直钢筋，则其矫直冷拉率不得大于1%",{"key":34,"text":237,"correct":22},"对于直径≤20mm的非轴心受拉构件的接头，可采用绑扎接头","BCE",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":253,"analysis":37},905293,"关于混凝土养护，下列说法正确的有（ ）。",[243,245,247,249,251],{"key":20,"text":244,"correct":22},"人工洒水可适用于任何部位，劳动强度较大，洒水范围受到限制",{"key":24,"text":246,"correct":26},"自流养护的养护效果较稳定",{"key":28,"text":248,"correct":26},"混凝土养护时间不宜少于18d",{"key":31,"text":250,"correct":22},"粒状的养护材料具有隔热保温和混凝土表面保护的功效",{"key":34,"text":252,"correct":22},"混凝土养护时间的长短，取决于混凝土强度增长和所在结构部位的重要性","ADE",{"id":255,"libraryId":5,"type":15,"typeLabel":16,"stem":256,"options":257,"answer":151,"analysis":37},905294,"关于锚喷支护，下列说法正确的有（ ）。",[258,260,262,264,266],{"key":20,"text":259,"correct":22},"锚喷支护是地下工程施工中对围岩进行保护与加固的主要技术措施",{"key":24,"text":261,"correct":22},"锚喷支护适用于不同地层条件、不同断面大小、不同用途的地下洞室",{"key":28,"text":263,"correct":26},"锚喷支护较传统的模注混凝土衬砌施工速度加快一倍以上且造价高",{"key":31,"text":265,"correct":26},"锚喷支护技术仅有单一的喷混凝土或锚杆支护",{"key":34,"text":267,"correct":22},"锚喷支护具有良好的力学性能与工作特性，对围岩的支护更合理更有效",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":282,"analysis":37},905295,"关于水工隧道灌浆，下列说法错误的有（ ）。",[272,274,276,278,280],{"key":20,"text":273,"correct":26},"隧洞回填灌浆的浆液较浓，采用填压式灌浆",{"key":24,"text":275,"correct":22},"当隧洞具有8°以上坡度时，灌浆应从最低一端开始",{"key":28,"text":277,"correct":26},"水工隧洞灌浆大多为浅孔",{"key":31,"text":279,"correct":22},"隧洞回填与固结灌浆的检查孔的数量均不应少于基本孔的10%",{"key":34,"text":281,"correct":22},"在设计规定的压力下，起始10min内，灌入孔内的水灰比为2∶1的浆液不超过5L","BDE",{"id":284,"libraryId":5,"type":15,"typeLabel":16,"stem":285,"options":286,"answer":297,"analysis":37},905296,"关于灌浆工程，下列说法正确的有（ ）。",[287,289,291,293,295],{"key":20,"text":288,"correct":22},"纯压式灌浆多用于吸浆量大，并有大裂隙存在和孔深不超过15m的情况",{"key":24,"text":290,"correct":26},"灌浆压力在5MPa以上的灌浆为高压灌浆",{"key":28,"text":292,"correct":26},"灌浆孔的基岩段长小于6m时，可采用分段钻灌法",{"key":31,"text":294,"correct":22},"帷幕灌浆可采用回转式钻机和金刚石钻头钻进",{"key":34,"text":296,"correct":26},"帷幕灌浆应优先采用循环式，射浆管距孔底不得大于30cm","AD",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":181,"analysis":37},905297,"在灌浆前应进行钻孔、钻孔冲洗、孔壁冲洗、裂隙冲洗和压水试验等工序，下列说法正确的有（ ）。",[302,304,306,308,310],{"key":20,"text":303,"correct":22},"钻机立轴和孔口管的方向必须与设计孔向一致",{"key":24,"text":305,"correct":22},"孔内沉积厚度不得超过20cm",{"key":28,"text":307,"correct":22},"灌浆孔宜选用较小的孔径",{"key":31,"text":309,"correct":22},"灌浆前宜采用压力水进行裂隙冲洗",{"key":34,"text":311,"correct":26},"冲洗压力可为灌浆压力的70%",{"id":313,"libraryId":5,"type":15,"typeLabel":16,"stem":314,"options":315,"answer":238,"analysis":37},905298,"关于固结灌浆施工工艺及技术要求，下列说法错误的有（ ）。",[316,318,320,322,324],{"key":20,"text":317,"correct":26},"灌浆孔的施工按分序加密的原则进行",{"key":24,"text":319,"correct":22},"灌浆压力大于5MPa的工程，灌浆孔应分段进行灌浆",{"key":28,"text":321,"correct":22},"灌浆孔灌浆前的压水试验采用五点法",{"key":31,"text":323,"correct":26},"灌浆质量压水试验检查，孔段合格率应在80%以上",{"key":34,"text":325,"correct":22},"在规定的压力下，当注入率不大于0.41\u002Fmin时，继续灌注60min",{"id":327,"libraryId":5,"type":15,"typeLabel":16,"stem":328,"options":329,"answer":106,"analysis":37},905299,"关于铲运机的开行路线以及作业方法，下列说法错误的有（ ）。",[330,332,334,336,338],{"key":20,"text":331,"correct":22},"椭圆形开行路线适合于长150m内基坑开挖、场地平整等工程使用",{"key":24,"text":333,"correct":26},"大面积场地整平，且填方和挖方轮次交替出现的地段可采用连续式开行路线",{"key":28,"text":335,"correct":22},"铲运机采用下坡铲土法时，其最大坡度不应超过25°",{"key":31,"text":337,"correct":22},"铲运机采用沟槽铲土法时，土埂两边沟槽深度以不大于0.5m",{"key":34,"text":339,"correct":26},"在坚硬的土体中，铲运机开采用助铲法",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":181,"analysis":37},905300,"关于边坡开挖与支护，下列说法正确的有（ ）。",[344,346,348,350,352],{"key":20,"text":345,"correct":22},"边坡开挖应采取自上而下、分区、分段、分层的方法依次进行",{"key":24,"text":347,"correct":22},"坡面开挖时，应根据土质情况，间隔一定的高度设置永久性戗台",{"key":28,"text":349,"correct":22},"支护包括锚固、护面和支档等形式",{"key":31,"text":351,"correct":22},"对于不稳定边坡的开挖，尽量避免采取爆破方式施工",{"key":34,"text":353,"correct":26},"采用机械开挖时，应距设计坡面留有不小于25cm的保护层",{"id":355,"libraryId":5,"type":15,"typeLabel":16,"stem":356,"options":357,"answer":368,"analysis":37},905301,"关于边坡开挖与支护，下列说法错误的有（ ）。",[358,360,362,364,366],{"key":20,"text":359,"correct":26},"边坡开挖时，一般采用自上而下的次序",{"key":24,"text":361,"correct":26},"渠道边坡一般采用一次削坡开挖的方法",{"key":28,"text":363,"correct":22},"有支护要求的边坡开挖主要采用坡面保护性开挖",{"key":31,"text":365,"correct":22},"坡高较大时，可采用分层留出马道的方法，一般马道宽度2～5m",{"key":34,"text":367,"correct":22},"开挖结束后再进行支护的方法，可用于边坡稳定性存在问题的情况","CDE",{"id":370,"libraryId":5,"type":15,"typeLabel":16,"stem":371,"options":372,"answer":52,"analysis":37},905302,"在水利水电工程建设中，较常用的工业炸药包括（ ）。",[373,375,377,379,381],{"key":20,"text":374,"correct":26},"水胶炸药",{"key":24,"text":376,"correct":22},"铵梯炸药",{"key":28,"text":378,"correct":22},"乳化炸药",{"key":31,"text":380,"correct":22},"铵油炸药",{"key":34,"text":382,"correct":26},"硝甘炸药",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":368,"analysis":37},905303,"工程爆破方法的选用主要取决于（ ）。",[387,389,391,393,395],{"key":20,"text":388,"correct":26},"炸药",{"key":24,"text":390,"correct":26},"起爆材料",{"key":28,"text":392,"correct":22},"工程规模",{"key":31,"text":394,"correct":22},"开挖强度",{"key":34,"text":396,"correct":22},"施工条件",{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":67,"analysis":37},905304,"关于工程爆破的基本方法，下列说法正确的有（ ）。",[401,403,405,407,409],{"key":20,"text":402,"correct":22},"浅孔爆破孔径小于75mm，孔深小于5m",{"key":24,"text":404,"correct":22},"在岩体的开挖轮廓线上，采用光面爆破可减少爆破对保留岩体的损伤",{"key":28,"text":406,"correct":26},"普通导爆索的爆速一般不低于6000m\u002Fs",{"key":31,"text":408,"correct":22},"地下工程开挖可采用浅孔爆破",{"key":34,"text":410,"correct":22},"定向爆破是抛掷爆破的一种特殊形式",{"id":412,"libraryId":5,"type":15,"typeLabel":16,"stem":413,"options":414,"answer":166,"analysis":37},905305,"关于碾压混凝土施工的特点，下列说法正确的有（ ）。",[415,417,419,421,423],{"key":20,"text":416,"correct":22},"碾压混凝土坝一般采用VC值为10～30s的干贫混凝土",{"key":24,"text":418,"correct":26},"当VC值大于40s时，混凝土强度则随VC值增大而提高",{"key":28,"text":420,"correct":22},"大量掺加粉煤灰，以保持混凝土有一定的胶凝材料",{"key":31,"text":422,"correct":22},"大坝横缝采用切缝法或诱导缝",{"key":34,"text":424,"correct":22},"采用通仓薄层浇筑",{"id":426,"libraryId":5,"type":15,"typeLabel":16,"stem":427,"options":428,"answer":439,"analysis":37},905306,"关于模板的安装、拆除及支护，下列说法错误的有（ ）。",[429,431,433,435,437],{"key":20,"text":430,"correct":26},"立模后，混凝土浇筑前，应在模板内表面涂以脱模剂，以利拆除",{"key":24,"text":432,"correct":22},"对于承重板，混凝土强度应达到设计强度的95%才能拆模",{"key":28,"text":434,"correct":26},"磨板表面应光洁平整，接缝严密，不漏浆",{"key":31,"text":436,"correct":26},"提高模板使用的周转率是降低模板成本的关键",{"key":34,"text":438,"correct":22},"悬臂模板可设置外部拉杆，以保证模板的稳定性","BE",{"id":441,"libraryId":5,"type":15,"typeLabel":16,"stem":442,"options":443,"answer":253,"analysis":37},905307,"在混凝土浇筑的施工过程中，下列说法正确的有（ ）。",[444,446,448,450,452],{"key":20,"text":445,"correct":22},"对于砂砾地基，应清除杂物，整平建基面，再浇10～20cm低强度等级的混凝土作垫层",{"key":24,"text":447,"correct":26},"焊接与绑扎接头距离钢筋弯头起点不小于9d，并不得位于最大弯矩处",{"key":28,"text":449,"correct":26},"采用高压水冲毛，一般应在浇后一两天进行",{"key":31,"text":451,"correct":22},"对于大体积混凝土浇筑块，成型后的偏差不应超过模板安装允许偏差的50%～100%",{"key":34,"text":453,"correct":22},"钢筋在调直机上调直后，其表面伤痕不得使钢筋截面面积减少5%以上",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":151,"analysis":37},905308,"成品骨料的堆放和运输应符合下列哪些规定？（ ）",[458,460,462,464,466],{"key":20,"text":459,"correct":22},"堆存场地应有良好的排水设施，必要时应设遮阳防雨棚",{"key":24,"text":461,"correct":22},"各级骨料仓之间应设置隔墙等有效措施",{"key":28,"text":463,"correct":26},"粒径大于40mm骨料的自由落差大于4m时，应设置缓降设施",{"key":31,"text":465,"correct":26},"储料仓除有足够的容积外，还应维持不小于5m的堆料厚度",{"key":34,"text":467,"correct":22},"在粗骨料成品堆场取料时，同一级料应注意在料堆不同部位同时取料",{"id":469,"libraryId":5,"type":15,"typeLabel":16,"stem":470,"options":471,"answer":121,"analysis":37},905309,"大体积混凝土温度控制措施主要有（ ）。",[472,474,476,478,480],{"key":20,"text":473,"correct":22},"减少混凝土的发热量",{"key":24,"text":475,"correct":22},"降低混凝土的入仓温度",{"key":28,"text":477,"correct":26},"温升期采取人工冷却",{"key":31,"text":479,"correct":22},"加速混凝土散热",{"key":34,"text":481,"correct":26},"减少混凝土的散热面",{"id":483,"libraryId":5,"type":15,"typeLabel":16,"stem":484,"options":485,"answer":282,"analysis":37},905310,"关于灌浆工序，下列说法错误的有（ ）。",[486,488,490,492,494],{"key":20,"text":487,"correct":26},"当灌浆压力保持不变，注入率持续减小时，不得改变水灰比",{"key":24,"text":489,"correct":22},"采用自上而下分段灌浆法时，灌浆孔封孔应采用“压力灌浆封孔法”",{"key":28,"text":491,"correct":26},"发生串浆时，如串浆孔具备灌浆条件，可以同时进行灌浆，应一泵灌一孔",{"key":31,"text":493,"correct":22},"灌浆工作因故中断，在恢复灌浆前应冲洗钻孔",{"key":34,"text":495,"correct":22},"采用自上而下分段灌浆法时，在规定的压力下，当注入率不大于0.41\u002Fmin时，继续灌注90min",{"id":497,"libraryId":5,"type":15,"typeLabel":16,"stem":498,"options":499,"answer":181,"analysis":37},905311,"灌浆检查孔应在哪些部位布置？（ ）",[500,502,504,506,508],{"key":20,"text":501,"correct":22},"帷幕中心线上",{"key":24,"text":503,"correct":22},"地质条件复杂的部位",{"key":28,"text":505,"correct":22},"钻孔偏斜过大，灌浆情况不正常的部位",{"key":31,"text":507,"correct":22},"经分析资料认为对帷幕灌浆质量有影响的部位",{"key":34,"text":509,"correct":26},"灌浆工作因故中断的部位",{"id":511,"libraryId":5,"type":15,"typeLabel":16,"stem":512,"options":513,"answer":67,"analysis":37},905312,"化学浆液的特点包括（ ）。",[514,516,518,520,522],{"key":20,"text":515,"correct":22},"化学灌浆浆液的可灌性好",{"key":24,"text":517,"correct":22},"浆液的聚合时间，可以人为控制",{"key":28,"text":519,"correct":26},"浆液聚合后形成的聚合体的渗透系数小，一般为10－10～10－7cm\u002Fs",{"key":31,"text":521,"correct":22},"化学浆液稳定性及耐久性均较好",{"key":34,"text":523,"correct":22},"化学灌浆有一定的毒性",{"id":525,"libraryId":5,"type":15,"typeLabel":16,"stem":526,"options":527,"answer":538,"analysis":37},905313,"关于混凝土浇筑过程中应注意的事项，下列说法正确的有（ ）",[528,530,532,534,536],{"key":20,"text":529,"correct":26},"一般要求清孔换浆以后3h内开始浇筑混凝土",{"key":24,"text":531,"correct":22},"在槽孔混凝土的浇筑过程中，必须保持均衡、连续、有节奏地施工",{"key":28,"text":533,"correct":22},"槽孔浇筑应严格遵循先深后浅的顺序",{"key":31,"text":535,"correct":22},"保持导管埋入混凝土的深度介于1～6m",{"key":34,"text":537,"correct":22},"全槽混凝土面均衡上升，上升速度不应小于2m\u002Fh","BCDE",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":181,"analysis":37},905314,"当需要采取锚固措施加固边坡时，应研究哪些锚固与支挡结构组合的技术可行性和经济合理性？（ ）",[543,545,547,549,551],{"key":20,"text":544,"correct":22},"锚杆与挡土墙",{"key":24,"text":546,"correct":22},"锚杆与抗滑桩",{"key":28,"text":548,"correct":22},"锚杆与混凝土格构",{"key":31,"text":550,"correct":22},"锚杆与混凝土塞",{"key":34,"text":552,"correct":26},"锚杆与土钉",{"id":554,"libraryId":5,"type":15,"typeLabel":16,"stem":555,"options":556,"answer":297,"analysis":37},905315,"关于施工工厂设施，下列说法错误的有（ ）。",[557,559,561,563,565],{"key":20,"text":558,"correct":22},"水利水电工程施工供水系统的主要任务是经济可靠地供给全工地的生产用水",{"key":24,"text":560,"correct":26},"施工供电系统的主要任务是供给工地各用户所需要的生产用电和生活用电",{"key":28,"text":562,"correct":26},"机械修配厂宜靠近施工现场",{"key":31,"text":564,"correct":22},"钢筋加工厂规模可按每月的日平均需要量确定",{"key":34,"text":566,"correct":26},"汽车保养数量在50～300辆时宜集中设置汽车保养站",{"id":568,"libraryId":5,"type":15,"typeLabel":16,"stem":569,"options":570,"answer":581,"analysis":37},905316,"木材加工厂规模应根据下列哪些确定（ ）",[571,573,575,577,579],{"key":20,"text":572,"correct":22},"木材来源及其运输方式",{"key":24,"text":574,"correct":22},"锯材、构件、木模板的需要量和供应计划",{"key":28,"text":576,"correct":22},"场内运输条件",{"key":31,"text":578,"correct":26},"高峰月的日平均需要量",{"key":34,"text":580,"correct":26},"原材料的供应运输方式","ABC",{"id":583,"libraryId":5,"type":15,"typeLabel":16,"stem":584,"options":585,"answer":166,"analysis":37},905317,"混凝土预制件厂规模的计算确定依据除了构件的种类、规格、数量，还包括构件的（ ）。",[586,588,590,592,594],{"key":20,"text":587,"correct":22},"最大重量",{"key":24,"text":589,"correct":26},"混凝土预制件的日平均需要量",{"key":28,"text":591,"correct":22},"供应计划",{"key":31,"text":593,"correct":22},"原材料来源",{"key":34,"text":595,"correct":22},"原材料供应运输方式",{"id":597,"libraryId":5,"type":15,"typeLabel":16,"stem":598,"options":599,"answer":610,"analysis":37},905318,"关于对外交通和场内交通的规划，下列说法错误的有（ ）。",[600,602,604,606,608],{"key":20,"text":601,"correct":26},"对外交通方案应确保主要道路与对外交通衔接",{"key":24,"text":603,"correct":26},"对外交通方案应确保施工工地具备完成施工期间外来物资运输任务的能力",{"key":28,"text":605,"correct":22},"对外及场内交通应采用公路运输方式",{"key":31,"text":607,"correct":26},"对外及场内交通应保持运物畅通，设施及标志齐全",{"key":34,"text":609,"correct":22},"场内交通规划应避免超限运输","CE",{"id":612,"libraryId":5,"type":15,"typeLabel":16,"stem":613,"options":614,"answer":538,"analysis":37},905319,"施工场地选择遵循的基本原则包括（ ）。",[615,617,619,621,623],{"key":20,"text":616,"correct":26},"施工场地不宜选在枢纽下游的水库区",{"key":24,"text":618,"correct":22},"施工场地地段之间、地段与施工区之间，联系简捷方便",{"key":28,"text":620,"correct":22},"研究施工场地与地方经济发展规划相结合的可能性",{"key":31,"text":622,"correct":22},"位于枢纽下游的施工场地，其整平高程应能满足防洪要求",{"key":34,"text":624,"correct":22},"施工场地应避开不良地质地段，考虑边坡的稳定性",{"id":626,"libraryId":5,"type":15,"typeLabel":16,"stem":627,"options":628,"answer":639,"analysis":37},905320,"下列关于居民建筑的规划布置，说法错误的有（ ）。",[629,631,633,635,637],{"key":20,"text":630,"correct":22},"北方的房屋间距一般采用1.0～1.5倍檐口高",{"key":24,"text":632,"correct":22},"居住建筑应集中布置于离生产区稍远的地点",{"key":28,"text":634,"correct":26},"布置地点应考虑居住建筑的特点，尽可能选择具有良好建筑朝向的地段",{"key":31,"text":636,"correct":26},"可通过绿化遮阳措施防止西晒",{"key":34,"text":638,"correct":26},"考虑必要的防震抗灾措施和防止噪声干扰的措施","AB",{"id":641,"libraryId":5,"type":15,"typeLabel":16,"stem":642,"options":643,"answer":91,"analysis":37},905321,"关于施工进度计划的调整，下列说法错误的有（ ）。",[644,646,648,650,652],{"key":20,"text":645,"correct":22},"活动的进度偏差未超过该活动的自由时差，仍需调整原进度计划",{"key":24,"text":647,"correct":26},"活动的进度偏差不大于该活动的总时差，则此进度偏差不影响工期",{"key":28,"text":649,"correct":26},"改变某些活动间的逻辑关系，可以调整施工进度计划",{"key":31,"text":651,"correct":26},"可以直接在网络图上缩短某些活动的持续时间",{"key":34,"text":653,"correct":22},"进度偏差的活动为关键活动，需要根据进度偏差值与总时差和自由时差的关系作进一步分析",{"id":655,"libraryId":5,"type":15,"typeLabel":16,"stem":656,"options":657,"answer":238,"analysis":37},905322,"下列关于施工进度计划的控制方法，说法正确的有（ ）。",[658,660,662,664,666],{"key":20,"text":659,"correct":26},"横道图的优点是形象、直观，且易于编制和理解，可直观反映工程费用与工期之间的关系",{"key":24,"text":661,"correct":22},"S形曲线可直观反映工程项目的实际进展情况",{"key":28,"text":663,"correct":22},"香蕉形曲线是由两条以同一开始、同一结束时间的S形曲线组合而成",{"key":31,"text":665,"correct":26},"S形曲线的工作量的具体内容是实物工程量",{"key":34,"text":667,"correct":22},"在双代号网络计划中，自始至终全部由关键工作组成的线路为关键线路",{"id":669,"libraryId":5,"type":15,"typeLabel":16,"stem":670,"options":671,"answer":166,"analysis":37},905323,"S形曲线能直观反映工程项目的（ ）。",[672,674,676,678,680],{"key":20,"text":673,"correct":22},"实际进展速度",{"key":24,"text":675,"correct":26},"关键线路",{"key":28,"text":677,"correct":22},"工程量完成情况",{"key":31,"text":679,"correct":22},"后续进度的预测",{"key":34,"text":681,"correct":22},"进度超前或拖延时间",{"id":683,"libraryId":5,"type":15,"typeLabel":16,"stem":684,"options":685,"answer":52,"analysis":37},905324,"编制施工总进度时，工程施工总工期应为（ ）之和。",[686,688,690,692,694],{"key":20,"text":687,"correct":26},"工程筹建期",{"key":24,"text":689,"correct":22},"工程准备期",{"key":28,"text":691,"correct":22},"主体工程施工期",{"key":31,"text":693,"correct":22},"工程完建期",{"key":34,"text":695,"correct":26},"工程验收期",{"id":697,"libraryId":5,"type":15,"typeLabel":16,"stem":698,"options":699,"answer":36,"analysis":37},905325,"关于质量检查工程量，下列说法正确的有（ ）。",[700,702,704,706,708],{"key":20,"text":701,"correct":22},"质量检查工程量包括基础处理工程检查工程量和其他检查工程量",{"key":24,"text":703,"correct":26},"采用概算定额编制概（估）算时，应计列检查孔的工程量",{"key":28,"text":705,"correct":22},"采用概、预算定额时不应计列试验坑的工程量",{"key":31,"text":707,"correct":26},"采用预算定额时应计列试验坑的工程量",{"key":34,"text":709,"correct":22},"采用预算定额时，选用相应定额计算检查孔的费用",{"id":711,"libraryId":5,"type":15,"typeLabel":16,"stem":712,"options":713,"answer":282,"analysis":37},905326,"下列关于工程量的说法正确的有（ ）。",[714,716,718,720,722],{"key":20,"text":715,"correct":26},"工程量是设计单位生产经营管理的重要依据",{"key":24,"text":717,"correct":22},"工程量是工程设计的重要数据、是确定工程造价的重要依据",{"key":28,"text":719,"correct":26},"初设阶段的工程量是进行造价文件编制的重要基础，是反映工程规模、工程范围、设计标准的重要数据，是项目正确决策的重要依据",{"key":31,"text":721,"correct":22},"准确计算工程量是工程计价活动中最基本的工作",{"key":34,"text":723,"correct":22},"工程量是承包单位生产经营管理的重要依据",{"id":725,"libraryId":5,"type":15,"typeLabel":16,"stem":726,"options":727,"answer":297,"analysis":37},905327,"关于工程量计算规则及工程量计算的基本要求，下列说法错误的有（ ）。",[728,730,732,734,736],{"key":20,"text":729,"correct":22},"不同工程的工程量计算规则基本相同",{"key":24,"text":731,"correct":26},"清单计价规范适用于引（调）水、灌溉等新建、改建工程的招标投标工程量清单编制",{"key":28,"text":733,"correct":26},"项目建议书阶段工程量的计算选取的阶段系数应与设计阶段相符",{"key":31,"text":735,"correct":22},"除定额另有规定外，工程量计算包括材料在建筑安装施工过程中的损耗量",{"key":34,"text":737,"correct":26},"按现行规定，尽可能杜绝工程量计算错漏等问题",[739,743,746,749,752,755],{"id":740,"name":741,"category":7,"favorite":742},1,"领导干部任职前廉政法规知识测试题",92,{"id":744,"name":745,"category":7,"favorite":740},595,"建筑结构与设备",{"id":747,"name":748,"category":7,"favorite":740},715,"招标采购专业知识与法律法规",{"id":750,"name":751,"category":7,"favorite":740},848,"市政方向-通用基础",{"id":753,"name":754,"category":7,"favorite":8},534,"BIM工程师",{"id":756,"name":754,"category":7,"favorite":8},535]