[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-585-19":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":730},{"id":5,"name":6,"category":7,"favorite":8},585,"建设工程技术与计量（水利）","建筑工程",0,19,50,1200,[13,38,53,68,82,97,112,127,142,156,171,185,199,213,228,243,257,271,285,299,313,328,343,358,372,387,402,416,430,445,459,474,489,503,517,531,545,559,573,587,602,616,631,639,653,666,680,694,708,722],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},905072,2,"多选题","螺旋分级机可以用来对砂料或矿物进行（ ）。",[19,23,26,30,33],{"key":20,"text":21,"correct":22},"A","破碎",false,{"key":24,"text":25,"correct":22},"B","筛分",{"key":27,"text":28,"correct":29},"C","脱水",true,{"key":31,"text":32,"correct":29},"D","淘洗",{"key":34,"text":35,"correct":29},"E","分级","CDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},905073,"（ ）是混凝土泵车的主参数。",[42,44,46,48,50],{"key":20,"text":43,"correct":22},"出口压力",{"key":24,"text":45,"correct":29},"臂架高度",{"key":27,"text":47,"correct":22},"泵送距离",{"key":31,"text":49,"correct":29},"理论输送量",{"key":34,"text":51,"correct":22},"安装形式","BD",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},905074,"悬辊磨的主要技术参数包括（ ）。",[57,59,61,63,65],{"key":20,"text":58,"correct":29},"最大给料粒度",{"key":24,"text":60,"correct":29},"粉碎力",{"key":27,"text":62,"correct":29},"生产能力",{"key":31,"text":64,"correct":22},"最小给料粒度",{"key":34,"text":66,"correct":29},"电机功率","ABCE",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},905075,"混凝土搅拌机应根据（ ）来正确选择和合理使用。",[72,74,76,78,80],{"key":20,"text":73,"correct":29},"工程量的大小",{"key":24,"text":75,"correct":29},"混凝土搅拌机的使用期限",{"key":27,"text":77,"correct":29},"坍落度大小.稠度大小",{"key":31,"text":79,"correct":22},"施工工艺布置",{"key":34,"text":81,"correct":29},"设计的混凝土组成特性",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":96,"analysis":37},905076,"下列关于共振筛分机特点的说法中，正确的有（ ）",[86,88,90,92,94],{"key":20,"text":87,"correct":29},"振幅大.筛分效率高",{"key":24,"text":89,"correct":29},"处理能力达.动负荷小",{"key":27,"text":91,"correct":22},"电耗多，结构紧凑",{"key":31,"text":93,"correct":29},"制造工艺复杂.设备重量大",{"key":34,"text":95,"correct":29},"振幅不稳定.使用寿命短.价格高","ABDE",{"id":98,"libraryId":5,"type":15,"typeLabel":16,"stem":99,"options":100,"answer":111,"analysis":37},905077,"下列关于双卧轴强制式混凝土搅拌机优点的说法中，正确的有（ ）",[101,103,105,107,109],{"key":20,"text":102,"correct":29},"外形尺寸小.重量轻.容量大.效率高",{"key":24,"text":104,"correct":29},"能生产坍落度广泛的优质水泥",{"key":27,"text":106,"correct":29},"运转平稳.噪声小，对大骨料混凝土生产的适应性较好",{"key":31,"text":108,"correct":22},"搅拌机的圆周速度为其他类型搅拌机的2倍，叶片和衬板磨损较大",{"key":34,"text":110,"correct":22},"搅拌机功率消耗较其他搅拌机小","ABC",{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":126,"analysis":37},905078,"混凝土振捣器按振源振动的形式不同可分为（ ）。",[116,118,120,122,124],{"key":20,"text":117,"correct":29},"偏心式",{"key":24,"text":119,"correct":22},"内部式",{"key":27,"text":121,"correct":29},"行星式",{"key":31,"text":123,"correct":29},"往复式",{"key":34,"text":125,"correct":22},"平台式","ACD",{"id":128,"libraryId":5,"type":15,"typeLabel":16,"stem":129,"options":130,"answer":141,"analysis":37},905079,"下列关于国产混凝土搅拌楼的说法中，正确的有（ ）。",[131,133,135,137,139],{"key":20,"text":132,"correct":29},"单阶式布置的混凝土搅拌楼生产率高，占地面积小，易于实现自动化",{"key":24,"text":134,"correct":29},"双阶式混凝土搅拌楼结构简单.投资少.建筑高度低",{"key":27,"text":136,"correct":22},"目前，水利水电工程使用的混凝土搅拌楼属于双阶式布置的混凝土搅拌楼",{"key":31,"text":138,"correct":22},"单阶式布置的混凝土搅拌楼适合于小型水利水电工程使用的混凝土搅拌楼",{"key":34,"text":140,"correct":29},"单阶式布置的混凝土搅拌楼材料只需要提升一次，然后靠自重下落至各道工序","ABE",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":67,"analysis":37},905080,"下列关于锤式破碎机的说法中，正确的有（ ）。",[146,148,150,152,154],{"key":20,"text":147,"correct":29},"构造简单，尺寸紧凑",{"key":24,"text":149,"correct":29},"占地面积小.自重轻",{"key":27,"text":151,"correct":29},"破碎比大.产品粒径小",{"key":31,"text":153,"correct":22},"使用中锤头时，适宜破碎坚硬石料",{"key":34,"text":155,"correct":29},"锤子数量多.磨损大.更换困难",{"id":157,"libraryId":5,"type":15,"typeLabel":16,"stem":158,"options":159,"answer":170,"analysis":37},905081,"下列各项中，属于水平式槽洗机特点的有（ ）。",[160,162,164,166,168],{"key":20,"text":161,"correct":29},"对含黏土多的石料擦洗较彻底",{"key":24,"text":163,"correct":29},"耗水量少，短时停车后容易启动",{"key":27,"text":165,"correct":22},"生产能力大，结构简单，工作可靠，耗电少",{"key":31,"text":167,"correct":29},"生产能力较小，电能消耗大，结构也复杂些",{"key":34,"text":169,"correct":22},"石料未经分级，洗泥不够彻底","ABD",{"id":172,"libraryId":5,"type":15,"typeLabel":16,"stem":173,"options":174,"answer":96,"analysis":37},905082,"下列关于圆锥破碎机特点的说法中，正确的有（ ）。",[175,177,179,181,183],{"key":20,"text":176,"correct":29},"结构先进，工作连续可靠",{"key":24,"text":178,"correct":29},"生产率高，功率小，运转平稳",{"key":27,"text":180,"correct":22},"构造简单，摩擦件少",{"key":31,"text":182,"correct":29},"适合于中碎.细碎各种坚硬石料",{"key":34,"text":184,"correct":29},"要粉体移运，要求精心安装维护",{"id":186,"libraryId":5,"type":15,"typeLabel":16,"stem":187,"options":188,"answer":52,"analysis":37},905083,"下列关于混凝土输送泵的说法中，正确的有（ ）。",[189,191,193,195,197],{"key":20,"text":190,"correct":22},"在供电正常地区和施工现场，在长时间固定不动的情况下，电机动力使用成本高",{"key":24,"text":192,"correct":29},"出口压力是决定泵送距离的标志，输送距离的远近还受混凝土和管道的密封性等因素的影响",{"key":27,"text":194,"correct":22},"混凝土泵车输送压力高，可以满足200m的高层建筑和400m的水平远距离输送",{"key":31,"text":196,"correct":29},"活塞式混凝土泵的排量取决于混凝土缸的数量和直径.活塞往复运动速度和混凝土缸吸入的容积效率等",{"key":34,"text":198,"correct":22},"混凝土泵车的臂架高度是指臂架完全展开后，地面与臂架底端之间的最大垂直距离",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":170,"analysis":37},905084,"下列属于机械式挖泥船的有（ ）。",[203,205,207,209,211],{"key":20,"text":204,"correct":29},"链斗式",{"key":24,"text":206,"correct":29},"铲扬式",{"key":27,"text":208,"correct":22},"射流式",{"key":31,"text":210,"correct":29},"反铲式",{"key":34,"text":212,"correct":22},"气动式",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":227,"analysis":37},905085,"下列绞吸式挖泥船中，适合在内河、湖泊及水库地区施工的有（ ）。",[217,219,221,223,225],{"key":20,"text":218,"correct":22},"超大型",{"key":24,"text":220,"correct":22},"大型",{"key":27,"text":222,"correct":29},"中型",{"key":31,"text":224,"correct":29},"小型",{"key":34,"text":226,"correct":22},"微小型","CD",{"id":229,"libraryId":5,"type":15,"typeLabel":16,"stem":230,"options":231,"answer":242,"analysis":37},905086,"下列各项中，属于气动泵式挖泥船施工特点的有（ ）。",[232,234,236,238,240],{"key":20,"text":233,"correct":29},"挖深大，泥浆浓度高",{"key":24,"text":235,"correct":29},"适用范围广.施工效率低.功耗大",{"key":27,"text":237,"correct":22},"挖掘效果好.泄漏少.产量高",{"key":31,"text":239,"correct":22},"挖槽规整.平坦.抗风浪能力强",{"key":34,"text":241,"correct":22},"易调节挖深.开挖平整度差","AB",{"id":244,"libraryId":5,"type":15,"typeLabel":16,"stem":245,"options":246,"answer":96,"analysis":37},905087,"下列关于双护盾式TBM的说法中，正确的有（ ）。",[247,249,251,253,255],{"key":20,"text":248,"correct":29},"双护盾式TBM掘进隧洞的衬护结构通常为预制混凝土管片",{"key":24,"text":250,"correct":29},"双护盾掘进模式下，掘进与安装管片同时进行，施工速度快",{"key":27,"text":252,"correct":22},"双护盾掘进模式适应于不稳定及不良地质地段",{"key":31,"text":254,"correct":29},"单护盾掘进模式作业循环为：掘进→辅助油缸回收→安装管片→再掘进",{"key":34,"text":256,"correct":29},"双护盾掘进模式作业循环为：掘进与安装管片→撑靴收回换步→再支撑→再掘进与安装管片",{"id":258,"libraryId":5,"type":15,"typeLabel":16,"stem":259,"options":260,"answer":126,"analysis":37},905088,"机械闭胸式盾构根据正面密封舱内物体可进一步分为（ ）。",[261,263,265,267,269],{"key":20,"text":262,"correct":29},"局部气压盾构",{"key":24,"text":264,"correct":22},"水压平衡盾构",{"key":27,"text":266,"correct":29},"泥水平衡盾构",{"key":31,"text":268,"correct":29},"土压平衡盾构",{"key":34,"text":270,"correct":22},"挤压式盾构",{"id":272,"libraryId":5,"type":15,"typeLabel":16,"stem":273,"options":274,"answer":141,"analysis":37},905089,"下列导流方式中属于分期围堰法的的有（ ）。",[275,277,279,281,283],{"key":20,"text":276,"correct":29},"底孔导流",{"key":24,"text":278,"correct":29},"束窄河床导流",{"key":27,"text":280,"correct":22},"隧洞导流",{"key":31,"text":282,"correct":22},"涵管导流",{"key":34,"text":284,"correct":29},"缺口导流",{"id":286,"libraryId":5,"type":15,"typeLabel":16,"stem":287,"options":288,"answer":111,"analysis":37},905090,"导流标准风险度分析，首先应计算导流系统动态综合风险率，然后综合考虑（ ）三者之间的关系，进行多目标决策分析。",[289,291,293,295,297],{"key":20,"text":290,"correct":29},"风险",{"key":24,"text":292,"correct":29},"工期",{"key":27,"text":294,"correct":29},"费用",{"key":31,"text":296,"correct":22},"质量",{"key":34,"text":298,"correct":22},"安全",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":96,"analysis":37},905091,"基坑经常性排水量的组成包括（ ）等。",[303,305,307,309,311],{"key":20,"text":304,"correct":29},"围堰渗流量",{"key":24,"text":306,"correct":29},"覆盖层含水量",{"key":27,"text":308,"correct":22},"基坑初期积水量",{"key":31,"text":310,"correct":29},"排水时段降雨量",{"key":34,"text":312,"correct":29},"施工弃水量",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":327,"analysis":37},905092,"新奥法的核心思想是“在充分考虑围岩自身承载能力的基础上，因地制宜地搞好地下洞室的开挖与支护，（ ）称为新奥法的三大支柱。",[317,319,321,323,325],{"key":20,"text":318,"correct":22},"洞室爆破",{"key":24,"text":320,"correct":29},"光面爆破",{"key":27,"text":322,"correct":29},"锚喷支护",{"key":31,"text":324,"correct":29},"施工过程中的围岩稳定状况监测",{"key":34,"text":326,"correct":22},"防渗技术","BCD",{"id":329,"libraryId":5,"type":15,"typeLabel":16,"stem":330,"options":331,"answer":342,"analysis":37},905093,"下列关于地下洞室开挖顺序说法正确的有（ ）。",[332,334,336,338,340],{"key":20,"text":333,"correct":29},"变高洞为低洞",{"key":24,"text":335,"correct":22},"变小跨度为大跨度",{"key":27,"text":337,"correct":29},"先拱部后底部",{"key":31,"text":339,"correct":22},"先核心后外缘",{"key":34,"text":341,"correct":22},"自下而上分部开挖与衬砌支护","AC",{"id":344,"libraryId":5,"type":15,"typeLabel":16,"stem":345,"options":346,"answer":357,"analysis":37},905094,"下列关于堤防填筑与压实说法正确的有（ ）。",[347,349,351,353,355],{"key":20,"text":348,"correct":22},"地面起伏不平时，为加快施工进度可顺坡铺填",{"key":24,"text":350,"correct":29},"堤防断面上的地面坡度陡于1：5时，应削至缓于1：5",{"key":27,"text":352,"correct":22},"分段作业面长度应根据施工机械的配备和作业能力确定，以不影响压实质量为原则，最小长度不宜大于100m",{"key":31,"text":354,"correct":29},"土料铺填与压实工序应连续进行，以免土料含水量变化过大影响填筑质量",{"key":34,"text":356,"correct":29},"严禁砂（砾）料或其他透水料与黏性土料混杂，上堤土料中的杂质应当清除","BDE",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":67,"analysis":37},905095,"疏浚工程分类包括（ ）。",[362,364,366,368,370],{"key":20,"text":363,"correct":29},"基建性",{"key":24,"text":365,"correct":29},"维护性",{"key":27,"text":367,"correct":29},"临时性",{"key":31,"text":369,"correct":22},"弃土性",{"key":34,"text":371,"correct":29},"环保性",{"id":373,"libraryId":5,"type":15,"typeLabel":16,"stem":374,"options":375,"answer":386,"analysis":37},905096,"疏浚工程质量控制目标可划分为（ ）。",[376,378,380,382,384],{"key":20,"text":377,"correct":22},"边线控制",{"key":24,"text":379,"correct":29},"中心线控制",{"key":27,"text":381,"correct":29},"挖宽控制",{"key":31,"text":383,"correct":29},"挖深控制",{"key":34,"text":385,"correct":29},"边坡控制","BCDE",{"id":388,"libraryId":5,"type":15,"typeLabel":16,"stem":389,"options":390,"answer":401,"analysis":37},905097,"基岩灌浆不宜选用（ ）。",[391,393,395,397,399],{"key":20,"text":392,"correct":22},"普通硅酸盐水泥",{"key":24,"text":394,"correct":29},"矿渣水泥",{"key":27,"text":396,"correct":29},"火山灰质硅酸盐水泥",{"key":31,"text":398,"correct":22},"硅酸盐大坝水泥",{"key":34,"text":400,"correct":22},"抗硫酸盐水泥","BC",{"id":403,"libraryId":5,"type":15,"typeLabel":16,"stem":404,"options":405,"answer":242,"analysis":37},905098,"混凝土灌注桩按受力情况分为（ ）桩。",[406,408,410,412,414],{"key":20,"text":407,"correct":29},"摩擦型",{"key":24,"text":409,"correct":29},"端承型",{"key":27,"text":411,"correct":22},"承受轴向压力",{"key":31,"text":413,"correct":22},"承受轴向拔力",{"key":34,"text":415,"correct":22},"挤土成孔灌注",{"id":417,"libraryId":5,"type":15,"typeLabel":16,"stem":418,"options":419,"answer":36,"analysis":37},905099,"下列属于沉井下沉位置检查的有（ ）。",[420,422,424,426,428],{"key":20,"text":421,"correct":22},"平面尺寸",{"key":24,"text":423,"correct":22},"井壁厚度",{"key":27,"text":425,"correct":29},"刃脚平均标高",{"key":31,"text":427,"correct":29},"底面中心位置偏移",{"key":34,"text":429,"correct":29},"刃脚底面高差",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":444,"analysis":37},905100,"骨料生产过程的损失系数包括（ ）。",[434,436,438,440,442],{"key":20,"text":435,"correct":29},"开挖作业",{"key":24,"text":437,"correct":29},"加工过程",{"key":27,"text":439,"correct":29},"运输堆存",{"key":31,"text":441,"correct":29},"混凝土生产",{"key":34,"text":443,"correct":22},"混凝土运输、浇筑","ABCD",{"id":446,"libraryId":5,"type":15,"typeLabel":16,"stem":447,"options":448,"answer":126,"analysis":37},905101,"下列大体积混凝土温度控制措施中，（ ）属于减少水泥用量。",[449,451,453,455,457],{"key":20,"text":450,"correct":29},"根据坝体分区采用不同标号的混凝土",{"key":24,"text":452,"correct":22},"采用低发热量的水泥",{"key":27,"text":454,"correct":29},"改善骨料级配，增大骨料粒径",{"key":31,"text":456,"correct":29},"采用高效外加减水剂",{"key":34,"text":458,"correct":22},"夏季早晚浇，正午不浇",{"id":460,"libraryId":5,"type":15,"typeLabel":16,"stem":461,"options":462,"answer":473,"analysis":37},905102,"下列混凝土质量检测方法中，（ ）属于物理方法。",[463,465,467,469,471],{"key":20,"text":464,"correct":29},"超声波",{"key":24,"text":466,"correct":22},"钻孔压水",{"key":27,"text":468,"correct":29},"射线",{"key":31,"text":470,"correct":22},"大钻孔取样",{"key":34,"text":472,"correct":29},"红外线","ACE",{"id":475,"libraryId":5,"type":15,"typeLabel":16,"stem":476,"options":477,"answer":488,"analysis":37},905103,"渗流监测内容包括（ ）。",[478,480,482,484,486],{"key":20,"text":479,"correct":22},"表面变形",{"key":24,"text":481,"correct":29},"坝基渗流",{"key":27,"text":483,"correct":29},"水质分析",{"key":31,"text":485,"correct":22},"流速监测",{"key":34,"text":487,"correct":29},"渗流量","BCE",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":357,"analysis":37},905104,"工程监测资料分析的内容一般包括（ ）。",[493,495,497,499,501],{"key":20,"text":494,"correct":22},"特征值分析",{"key":24,"text":496,"correct":29},"监测效应量的变化特性分析",{"key":27,"text":498,"correct":22},"变化率分析",{"key":31,"text":500,"correct":29},"环境量对监测效应量的影响分析",{"key":34,"text":502,"correct":29},"典型监测效应量的分布特性分析",{"id":504,"libraryId":5,"type":15,"typeLabel":16,"stem":505,"options":506,"answer":327,"analysis":37},905106,"根据《水利水电工程施工组织设计规范》（SL 303-2017），水利工程建设项目施工总工期是指（ ）之和。",[507,509,511,513,515],{"key":20,"text":508,"correct":22},"工程筹建期",{"key":24,"text":510,"correct":29},"工程准备期",{"key":27,"text":512,"correct":29},"主体工程施工期",{"key":31,"text":514,"correct":29},"工程完建期",{"key":34,"text":516,"correct":22},"工程试运行期",{"id":518,"libraryId":5,"type":15,"typeLabel":16,"stem":519,"options":520,"answer":170,"analysis":37},905107,"下列施工进度计划控制措施中属于组织措施的有（ ）。",[521,523,525,527,529],{"key":20,"text":522,"correct":29},"明确现场项目管理组织机构中进度控制人员职责",{"key":24,"text":524,"correct":29},"建立进度协调会议制度",{"key":27,"text":526,"correct":22},"对建设工程进度实施动态控制",{"key":31,"text":528,"correct":29},"编制年度进度计划",{"key":34,"text":530,"correct":22},"加强风险管理",{"id":532,"libraryId":5,"type":15,"typeLabel":16,"stem":533,"options":534,"answer":227,"analysis":37},905109,"劳动力需求的计算方法包括（ ）。",[535,537,539,541,543],{"key":20,"text":536,"correct":22},"横断面近似计算法",{"key":24,"text":538,"correct":22},"分块局部计算法",{"key":27,"text":540,"correct":29},"劳动定额法",{"key":31,"text":542,"correct":29},"类比法",{"key":34,"text":544,"correct":22},"水平剖面法",{"id":546,"libraryId":5,"type":15,"typeLabel":16,"stem":547,"options":548,"answer":141,"analysis":37},905110,"施工工厂设施包括（ ）。",[549,551,553,555,557],{"key":20,"text":550,"correct":29},"混凝土生产系统",{"key":24,"text":552,"correct":29},"砂石料加工系统",{"key":27,"text":554,"correct":22},"转运站",{"key":31,"text":556,"correct":22},"对内交通",{"key":34,"text":558,"correct":29},"机械修配及综合加工系统",{"id":560,"libraryId":5,"type":15,"typeLabel":16,"stem":561,"options":562,"answer":488,"analysis":37},905111,"施工损耗量包括（ ）。",[563,565,567,569,571],{"key":20,"text":564,"correct":22},"施工附加量",{"key":24,"text":566,"correct":29},"运输损耗量",{"key":27,"text":568,"correct":29},"操作损耗量",{"key":31,"text":570,"correct":22},"施工超挖量",{"key":34,"text":572,"correct":29},"体积变化损耗量",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":36,"analysis":37},905112,"（ ）工程计价属于市场行为，执行《水利工程工程量清单计价规范》（GB 50501—2007）",[577,579,581,583,585],{"key":20,"text":578,"correct":22},"规划阶段",{"key":24,"text":580,"correct":22},"可行性研究阶段",{"key":27,"text":582,"correct":29},"招标投标阶段",{"key":31,"text":584,"correct":29},"施工建设阶段",{"key":34,"text":586,"correct":29},"完工阶段",{"id":588,"libraryId":5,"type":15,"typeLabel":16,"stem":589,"options":590,"answer":601,"analysis":37},905113,"下列疏浚工程项目中，（ ）需要计量支付。",[591,593,595,597,599],{"key":20,"text":592,"correct":29},"按设计图纸轮廓尺寸计算的水下有效自然方",{"key":24,"text":594,"correct":22},"开工展布与收工集合",{"key":27,"text":596,"correct":22},"施工自然回於量",{"key":31,"text":598,"correct":29},"浚前扫床及障碍物清除",{"key":34,"text":600,"correct":29},"排泥区围堰","ADE",{"id":603,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":605,"answer":67,"analysis":37},905114,"对可能影响水库正常运用或带来危害的渗漏地段，应进行防渗处理。常见的防渗措施包括（ ）。",[606,608,610,612,614],{"key":20,"text":607,"correct":29},"堵洞",{"key":24,"text":609,"correct":29},"围井或隔离",{"key":27,"text":611,"correct":29},"铺盖",{"key":31,"text":613,"correct":22},"挡土墙",{"key":34,"text":615,"correct":29},"帷幕灌浆",{"id":617,"libraryId":5,"type":15,"typeLabel":16,"stem":618,"options":619,"answer":630,"analysis":37},905115,"关于渗漏总量与渗漏量的说法，下列可以作为正常使用的水库有（ ）。",[620,622,624,626,628],{"key":20,"text":621,"correct":22},"渗漏总量小于该河流段平水期流量的5%的水库",{"key":24,"text":623,"correct":29},"渗漏总量小于该河流多年平均流量的5%的水库",{"key":27,"text":625,"correct":22},"渗漏总量小于该河流段平水期流量的1%～3%的水库",{"key":31,"text":627,"correct":22},"渗漏量小于该河流多年平均流量的1%～3%的水库",{"key":34,"text":629,"correct":29},"渗漏量小于该河流段平水期流量的1%～3%的水库","BE",{"id":632,"libraryId":5,"type":15,"typeLabel":16,"stem":604,"options":633,"answer":67,"analysis":37},905116,[634,635,636,637,638],{"key":20,"text":607,"correct":29},{"key":24,"text":609,"correct":29},{"key":27,"text":611,"correct":29},{"key":31,"text":613,"correct":22},{"key":34,"text":615,"correct":29},{"id":640,"libraryId":5,"type":15,"typeLabel":16,"stem":641,"options":642,"answer":96,"analysis":37},905117,"影响水库塌岸的因素包括（ ）。",[643,645,647,649,651],{"key":20,"text":644,"correct":29},"水文气象条件",{"key":24,"text":646,"correct":29},"库岸岩性和构造条件",{"key":27,"text":648,"correct":22},"库岸的修建时间",{"key":31,"text":650,"correct":29},"库岸形态特征",{"key":34,"text":652,"correct":29},"岸坡植被覆盖程度",{"id":654,"libraryId":5,"type":15,"typeLabel":16,"stem":655,"options":656,"answer":444,"analysis":37},905118,"水库塌岸的防治通常可以采用下列哪些措施？（ ）",[657,659,661,663,665],{"key":20,"text":658,"correct":29},"抛石",{"key":24,"text":660,"correct":29},"防波堤",{"key":27,"text":662,"correct":29},"草皮护坡",{"key":31,"text":664,"correct":29},"护岸墙",{"key":34,"text":607,"correct":22},{"id":667,"libraryId":5,"type":15,"typeLabel":16,"stem":668,"options":669,"answer":126,"analysis":37},905119,"产生水库浸没问题的条件及其主要影响因素包括（ ）。",[670,672,674,676,678],{"key":20,"text":671,"correct":29},"地形地貌",{"key":24,"text":673,"correct":22},"水文气象",{"key":27,"text":675,"correct":29},"岩土性质",{"key":31,"text":677,"correct":29},"水文地质条件",{"key":34,"text":679,"correct":22},"某些人为活动",{"id":681,"libraryId":5,"type":15,"typeLabel":16,"stem":682,"options":683,"answer":327,"analysis":37},905120,"关于水库诱发地震的特点，下列说法错误的有（ ）。",[684,686,688,690,692],{"key":20,"text":685,"correct":22},"地震震级小，震源浅",{"key":24,"text":687,"correct":29},"空间分布上震中大部分集中在库盆和距库岸2～5km以内的地方",{"key":27,"text":689,"correct":29},"地震高潮和大多数主震发生在蓄水初期1～3年内",{"key":31,"text":691,"correct":29},"发生诱发地震的水库在水库工程总数（坝高大于15m）中所占比例不足1%",{"key":34,"text":693,"correct":22},"震型通常为前震～主震～余震型",{"id":695,"libraryId":5,"type":15,"typeLabel":16,"stem":696,"options":697,"answer":488,"analysis":37},905121,"工程地质条件一般包括工程建筑地区的地形地貌、岩土类型及工程地质性质、地质结构、水文地质条件、物理地质现象、地质物理环境（例如地应力及地热等）、天然建筑材料等方面。下列有关说法正确的有（ ）。",[698,700,702,704,706],{"key":20,"text":699,"correct":22},"碎石及块石料常用作混凝土骨料",{"key":24,"text":701,"correct":29},"坝址选择应考虑岩体结构的不利因素",{"key":27,"text":703,"correct":29},"地应力可引起基坑开挖面卸荷回弹",{"key":31,"text":705,"correct":22},"影响大坝安全的自然地质现象不必进行处理",{"key":34,"text":707,"correct":29},"地形地貌条件直接影响坝型选择",{"id":709,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":711,"answer":342,"analysis":37},905122,"土石坝又称当地材料坝，下列关于土石坝的说法不正确的有（ ）。",[712,714,716,718,720],{"key":20,"text":713,"correct":29},"黏土地基不可修建堆石坝",{"key":24,"text":715,"correct":22},"土坝可适应一定的地基变形",{"key":27,"text":717,"correct":29},"堆石坝坝顶可以溢流",{"key":31,"text":719,"correct":22},"土坝的抗震性能较好",{"key":34,"text":721,"correct":22},"岩石坝基要适当处理破碎带",{"id":723,"libraryId":5,"type":15,"typeLabel":16,"stem":710,"options":724,"answer":342,"analysis":37},905123,[725,726,727,728,729],{"key":20,"text":713,"correct":29},{"key":24,"text":715,"correct":22},{"key":27,"text":717,"correct":29},{"key":31,"text":719,"correct":22},{"key":34,"text":721,"correct":22},[731,735,738,741,744,747],{"id":732,"name":733,"category":7,"favorite":734},1,"领导干部任职前廉政法规知识测试题",92,{"id":736,"name":737,"category":7,"favorite":732},595,"建筑结构与设备",{"id":739,"name":740,"category":7,"favorite":732},715,"招标采购专业知识与法律法规",{"id":742,"name":743,"category":7,"favorite":732},848,"市政方向-通用基础",{"id":745,"name":746,"category":7,"favorite":8},534,"BIM工程师",{"id":748,"name":746,"category":7,"favorite":8},535]