[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-585-13":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":622},{"id":5,"name":6,"category":7,"favorite":8},585,"建设工程技术与计量（水利）","建筑工程",0,13,50,1200,[13,34,46,58,70,82,94,106,118,130,142,154,166,178,190,202,214,226,238,250,262,274,286,298,310,322,334,346,358,370,382,394,406,418,430,442,454,466,478,490,502,514,526,538,550,562,574,586,598,610],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},904771,1,"单选题","绑扎接头的接头面积占受力钢筋总截面面积的允许百分率在构件的受拉区中不超过（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","15%",false,{"key":24,"text":25,"correct":26},"B","25%",true,{"key":28,"text":29,"correct":22},"C","35%",{"key":31,"text":32,"correct":22},"D","50%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":24,"analysis":33},904772,"采用斜层浇筑法进行混凝土入仓铺料时，应注意浇筑块的高度一般限制在（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"1.0m左右",{"key":24,"text":41,"correct":26},"1.5m左右",{"key":28,"text":43,"correct":22},"2.0m左右",{"key":31,"text":45,"correct":22},"2.5m左右",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},904773,"在水利水电工程中，常采用的混凝土振捣方式为（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"插入式",{"key":24,"text":53,"correct":22},"外部式",{"key":28,"text":55,"correct":22},"表面式",{"key":31,"text":57,"correct":22},"振动台",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":28,"analysis":33},904774,"混凝土铺料的允许间隔时间应按照（ ）确定。",[62,64,66,68],{"key":20,"text":63,"correct":22},"混凝土初凝时间",{"key":24,"text":65,"correct":22},"混凝土温控要求",{"key":28,"text":67,"correct":26},"混凝土初凝时间和混凝土温控要求两者中较小值确定",{"key":31,"text":69,"correct":22},"混凝土浇筑温度",{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":31,"analysis":33},904775,"关于砌石工程，下列说法错误的是（ ）。",[74,76,78,80],{"key":20,"text":75,"correct":22},"浆砌石可用于大坝工程",{"key":24,"text":77,"correct":22},"干砌石可用于河床、岸坡的保护加固",{"key":28,"text":79,"correct":22},"抛石经常用于河岸护脚、险工、控导以及抢修工程",{"key":31,"text":81,"correct":26},"100m以内砂浆运输过程属于干砌石施工",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":31,"analysis":33},904776,"大体积混凝土产生的深层裂缝切割的深度可达（ ）以上。",[86,88,90,92],{"key":20,"text":87,"correct":22},"1～2m",{"key":24,"text":89,"correct":22},"1～3m",{"key":28,"text":91,"correct":22},"3～4m",{"key":31,"text":93,"correct":26},"1～5m",{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":20,"analysis":33},904777,"灌浆按不同的分类方式可分为不同的类型，下列说法错误的是（ ）。",[98,100,102,104],{"key":20,"text":99,"correct":26},"按灌浆压力可将灌浆分为高压灌浆和低压灌浆",{"key":24,"text":101,"correct":22},"按灌浆地层可分为岩石地基灌浆、砂砾石地层灌浆、土层灌浆等",{"key":28,"text":103,"correct":22},"按浆液材料主要分为水泥灌浆、黏土灌浆和化学灌浆等",{"key":31,"text":105,"correct":22},"按灌浆目的分为帷幕灌浆、固结灌浆、接触灌浆、接缝灌浆、回填灌浆、预应力灌浆",{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":28,"analysis":33},904778,"灌浆泵容许工作压力应大于最大灌浆压力的（ ）。",[110,112,114,116],{"key":20,"text":111,"correct":22},"0.5倍",{"key":24,"text":113,"correct":22},"1.0倍",{"key":28,"text":115,"correct":26},"1.5倍",{"key":31,"text":117,"correct":22},"2.0倍",{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":28,"analysis":33},904779,"在对灌浆的质量进行检查的过程中应注意的事项不包括（ ）。",[122,124,126,128],{"key":20,"text":123,"correct":22},"灌浆检查孔的数量不少于灌浆孔总数的10%",{"key":24,"text":125,"correct":22},"一个坝段内，至少应布置一个检查孔",{"key":28,"text":127,"correct":26},"检查孔压水试验应在该部位灌浆结束7d后进行",{"key":31,"text":129,"correct":22},"压水试验可采用五点法",{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":24,"analysis":33},904780,"关于固结灌浆施工技术要求，下列说法错误的是（ ）。",[134,136,138,140],{"key":20,"text":135,"correct":22},"灌浆孔灌浆前的压水试验孔数不宜少于总孔数的5%",{"key":24,"text":137,"correct":26},"固结灌浆质量压水试验检查应在灌浆结束14d后进行",{"key":28,"text":139,"correct":22},"灌浆孔应采用压力水进行裂隙冲洗，冲洗压力值不超过1MPa",{"key":31,"text":141,"correct":22},"灌浆孔封孔可采用“压力灌浆封孔法”",{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":31,"analysis":33},904781,"在砂砾石层中进行钻孔灌浆施工的特点不包括（ ）。",[146,148,150,152],{"key":20,"text":147,"correct":22},"在砂砾石层中钻孔和灌浆的全过程中须有固壁措施",{"key":24,"text":149,"correct":22},"钻孔孔壁不坚固、不能直接在孔壁下灌浆塞",{"key":28,"text":151,"correct":22},"砂砾石层孔隙大，吸浆量大",{"key":31,"text":153,"correct":26},"钻孔孔壁光滑、可直接在孔壁下灌浆塞",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":20,"analysis":33},904782,"在上部有相当厚度覆盖层的砂砾石层中，砂砾石帷幕灌浆常采用哪种钻孔灌浆方法？（ ）",[158,160,162,164],{"key":20,"text":159,"correct":26},"循环钻灌浆法",{"key":24,"text":161,"correct":22},"预埋花管法",{"key":28,"text":163,"correct":22},"打管灌浆法",{"key":31,"text":165,"correct":22},"套管灌浆法",{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":28,"analysis":33},904783,"关于灌浆方法及压送浆液的方式，下列说法错误的是（ ）。",[170,172,174,176],{"key":20,"text":171,"correct":22},"单液法的浆液配比较准确，施工较简单",{"key":24,"text":173,"correct":22},"双液法适应性强",{"key":28,"text":175,"correct":26},"气压法适用于双液法灌浆",{"key":31,"text":177,"correct":22},"化学灌浆一般都采用纯压式灌浆",{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":31,"analysis":33},904784,"关于高压喷射灌浆的适用范围和方法，下列说法错误的是（ ）。",[182,184,186,188],{"key":20,"text":183,"correct":22},"高压喷射灌浆防渗和加固技术适用于软弱土层",{"key":24,"text":185,"correct":22},"单管法形成凝结体的桩径一般为0.5～0.9m",{"key":28,"text":187,"correct":22},"采用三管法喷射出的水流与气流的直径一般有1.0～2.0m",{"key":31,"text":189,"correct":26},"采用新三管法时，水、气喷嘴和浆、气喷嘴铅直间距0.5～0.7m",{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":31,"analysis":33},904785,"防渗墙按不同的分类方式可分为不同的类型，下列说法错误的是（ ）。",[194,196,198,200],{"key":20,"text":195,"correct":22},"按墙体结构型式分类，主要有桩柱型防渗墙、槽孔型防渗墙和混合型防渗墙",{"key":24,"text":197,"correct":22},"按墙体材料分类，主要有普通混凝土防渗墙、钢筋混凝土防渗墙、黏土混凝土防渗墙、塑性混凝土防渗墙和灰浆防渗墙",{"key":28,"text":199,"correct":22},"按成槽方法分类，主要有钻挖成槽防渗墙、射水成槽防渗墙、链斗成槽防渗墙和锯槽防渗墙",{"key":31,"text":201,"correct":26},"按施工工艺分类，主要有嵌固式防渗墙、悬挂式防渗墙和组合式防渗墙",{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":28,"analysis":33},904786,"在做好槽孔的测量定位工作的基础上，应布置和修筑好施工平台和导向槽，下列说法错误的是（ ）。",[206,208,210,212],{"key":20,"text":207,"correct":22},"导向槽可用木料、条石、灰拌土或混凝土制成",{"key":24,"text":209,"correct":22},"导向槽的高度以1.0～2.0m为宜",{"key":28,"text":211,"correct":26},"导向槽应高出地下水位3m以上",{"key":31,"text":213,"correct":22},"在向槽内充灌固壁泥浆时，应保持泥浆液面在槽顶以下30～50cm",{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":31,"analysis":33},904787,"下列关于造孔成槽的说法正确的是（ ）。",[218,220,222,224],{"key":20,"text":219,"correct":22},"钻劈法一般要求主孔先导8～10m",{"key":24,"text":221,"correct":22},"钻抓法适用于砂砾石等地层",{"key":28,"text":223,"correct":22},"分层钻进法适用于粒径较大的地层",{"key":31,"text":225,"correct":26},"铣削法多用于砾石以下细颗粒松散地层和软弱岩层",{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":20,"analysis":33},904788,"下列各项中应采用泵吸法进行清洗换浆是（ ）。",[230,232,234,236],{"key":20,"text":231,"correct":26},"槽深40m",{"key":24,"text":233,"correct":22},"槽深80m",{"key":28,"text":235,"correct":22},"槽深110m",{"key":31,"text":237,"correct":22},"槽深500m",{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":31,"analysis":33},904789,"泥浆下浇筑混凝土的主要特点不包括（ ）。",[242,244,246,248],{"key":20,"text":243,"correct":22},"不允许泥浆与混凝土掺混形成泥浆夹层",{"key":24,"text":245,"correct":22},"确保混凝土与基础以及一、二期混凝土之间的结合",{"key":28,"text":247,"correct":22},"连续浇筑",{"key":31,"text":249,"correct":26},"施工难度大",{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":24,"analysis":33},904790,"对要求单根锚杆的锚固力大的软岩，宜采用（ ）。",[254,256,258,260],{"key":20,"text":255,"correct":22},"压力分散型预应力锚杆",{"key":24,"text":257,"correct":26},"拉力分散型预应力锚杆",{"key":28,"text":259,"correct":22},"拉力集中型预应力锚杆",{"key":31,"text":261,"correct":22},"压力集中型预应力锚杆",{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":31,"analysis":33},904791,"关于推土机常用的作业方法，下列说法正确的是（ ）。",[266,268,270,272],{"key":20,"text":267,"correct":22},"推土机采用槽形推土法时，可提高工作效率15%～30%",{"key":24,"text":269,"correct":22},"推土机采用下坡推土法时，坡度不宜超过20°",{"key":28,"text":271,"correct":22},"推土机采用并列推土法时，铲刀相距15～30cm，平均运距不宜超过50～70m，亦不宜小于25m",{"key":31,"text":273,"correct":26},"推土机采用分段铲土集中推送法时，堆积距离不宜大于30m，堆土高度以2m内为宜",{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":20,"analysis":33},904792,"坝基开挖的施工内容如下，其正确顺序为（ ）。 ①布置施工道路；②确定施工方法；③爆破安全控制及施工安全措施；④选择开挖程序；⑤质量控制要求；⑥环境污染的治理措施；⑦土石方平衡。",[278,280,282,284],{"key":20,"text":279,"correct":26},"①→④→②→⑦→③→⑤→⑥",{"key":24,"text":281,"correct":22},"④→①→②→⑦→③→⑤→⑥",{"key":28,"text":283,"correct":22},"①→④→⑦→②→③→⑤→⑥",{"key":31,"text":285,"correct":22},"④→①→⑦→②→③→⑤→⑥",{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":31,"analysis":33},904793,"与深孔爆破法比较，浅孔爆破具有（ ）的特点。",[290,292,294,296],{"key":20,"text":291,"correct":22},"操作复杂",{"key":24,"text":293,"correct":22},"适用于大规模爆破",{"key":28,"text":295,"correct":22},"劳动生产率高",{"key":31,"text":297,"correct":26},"有利于控制开挖面的形状",{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":31,"analysis":33},904794,"关于各类型盾构机定义及特性，下列说法错误的是（ ）。",[302,304,306,308],{"key":20,"text":303,"correct":22},"敞开式盾构机相对工艺简单，灵活性高",{"key":24,"text":305,"correct":22},"土压平衡式盾构机具有开挖推进、同步衬砌和一次性成洞等功能",{"key":28,"text":307,"correct":22},"地下水少的黏性地层可选用土压平衡式盾构机",{"key":31,"text":309,"correct":26},"泥水平衡盾构机主要适用于地下水压大，土体渗透系数小的地质状况",{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":28,"analysis":33},904795,"盾构试掘进的长度一般为始发后（ ）。",[314,316,318,320],{"key":20,"text":315,"correct":22},"80m",{"key":24,"text":317,"correct":22},"90m",{"key":28,"text":319,"correct":26},"100m",{"key":31,"text":321,"correct":22},"110m",{"id":323,"libraryId":5,"type":15,"typeLabel":16,"stem":324,"options":325,"answer":20,"analysis":33},904796,"下列属于爬罐法的施工特点的是（ ）。",[326,328,330,332],{"key":20,"text":327,"correct":26},"下部出渣安全性好",{"key":24,"text":329,"correct":22},"施工设备简易，成本低",{"key":28,"text":331,"correct":22},"成本低，效率高",{"key":31,"text":333,"correct":22},"安全问题突出",{"id":335,"libraryId":5,"type":15,"typeLabel":16,"stem":336,"options":337,"answer":20,"analysis":33},904797,"关于坝壳料的铺填方法，下列说法正确的是（ ）。",[338,340,342,344],{"key":20,"text":339,"correct":26},"进占法堆石料铺填厚度1.0m",{"key":24,"text":341,"correct":22},"后退法堆石料铺填厚度一般大于1.0m",{"key":28,"text":343,"correct":22},"堆石料一般应用混合法铺料",{"key":31,"text":345,"correct":22},"级配较好的石料宜用进占法铺料",{"id":347,"libraryId":5,"type":15,"typeLabel":16,"stem":348,"options":349,"answer":28,"analysis":33},904798,"料场规划的基本内容不包括（ ）。",[350,352,354,356],{"key":20,"text":351,"correct":22},"空间规划",{"key":24,"text":353,"correct":22},"时间规划",{"key":28,"text":355,"correct":26},"资源规划",{"key":31,"text":357,"correct":22},"料场质与量规划",{"id":359,"libraryId":5,"type":15,"typeLabel":16,"stem":360,"options":361,"answer":31,"analysis":33},904799,"关于防渗体坝面填筑的土料铺料工序，下列说法错误的是（ ）。",[362,364,366,368],{"key":20,"text":363,"correct":22},"进占法铺料不会影响洒水、刨毛作业",{"key":24,"text":365,"correct":22},"风化料可以选用后退法铺料",{"key":28,"text":367,"correct":22},"土料与岸坡、反滤料等交界处应辅以人工仔细平整",{"key":31,"text":369,"correct":26},"防渗体土料铺筑采用自卸汽车卸料，铲运机平料",{"id":371,"libraryId":5,"type":15,"typeLabel":16,"stem":372,"options":373,"answer":20,"analysis":33},904800,"多用于起伏的基础部位或特殊的异形结构是下列哪种模板？（ ）",[374,376,378,380],{"key":20,"text":375,"correct":26},"固定式",{"key":24,"text":377,"correct":22},"拆移式",{"key":28,"text":379,"correct":22},"移动式",{"key":31,"text":381,"correct":22},"滑动式",{"id":383,"libraryId":5,"type":15,"typeLabel":16,"stem":384,"options":385,"answer":24,"analysis":33},904801,"混凝土搅拌楼的控制中心是（ ）。",[386,388,390,392],{"key":20,"text":387,"correct":22},"进料层",{"key":24,"text":389,"correct":26},"配料层",{"key":28,"text":391,"correct":22},"拌合层",{"key":31,"text":393,"correct":22},"储料层",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":31,"analysis":33},904802,"关于混凝土运输方案，下列说法错误的是（ ）。",[398,400,402,404],{"key":20,"text":399,"correct":22},"无轨运输混凝土，运输成本较高",{"key":24,"text":401,"correct":22},"有轨运输适用于混凝土工程量较大的工程",{"key":28,"text":403,"correct":22},"混凝土垂直运输方式取决于建筑物的高度和体积",{"key":31,"text":405,"correct":26},"从混凝土出机口到浇筑仓面前主要完成垂直运输",{"id":407,"libraryId":5,"type":15,"typeLabel":16,"stem":408,"options":409,"answer":24,"analysis":33},904803,"具有简单实用、自重轻、定位准、拆装快等特点的模板是（ ）。",[410,412,414,416],{"key":20,"text":411,"correct":22},"移动式模板",{"key":24,"text":413,"correct":26},"自升式模板",{"key":28,"text":415,"correct":22},"拆除式模板",{"key":31,"text":417,"correct":22},"滑升模板",{"id":419,"libraryId":5,"type":15,"typeLabel":16,"stem":420,"options":421,"answer":31,"analysis":33},904804,"分段钻灌法不包括（ ）。",[422,424,426,428],{"key":20,"text":423,"correct":22},"自上而下分段灌浆法",{"key":24,"text":425,"correct":22},"综合灌浆法",{"key":28,"text":427,"correct":22},"孔口封闭灌浆法",{"key":31,"text":429,"correct":26},"全孔一次灌浆法",{"id":431,"libraryId":5,"type":15,"typeLabel":16,"stem":432,"options":433,"answer":28,"analysis":33},904805,"岩石基础帷幕灌浆与固结灌浆在进行钻孔工序时，应注意钻孔位置与设计位置的偏差不得大于（ ）。",[434,436,438,440],{"key":20,"text":435,"correct":22},"5cm",{"key":24,"text":437,"correct":22},"7cm",{"key":28,"text":439,"correct":26},"10cm",{"key":31,"text":441,"correct":22},"13cm",{"id":443,"libraryId":5,"type":15,"typeLabel":16,"stem":444,"options":445,"answer":24,"analysis":33},904806,"关于柔性支护，下列说法错误的是（ ）。",[446,448,450,452],{"key":20,"text":447,"correct":22},"被动防护系统对高陡边坡是一种非常有效而经济的方法",{"key":24,"text":449,"correct":26},"主动防护系统具有低柔性",{"key":28,"text":451,"correct":22},"常用的主动防护网类型有GAR、GPS和GTC三种",{"key":31,"text":453,"correct":22},"被动防护系统可用于岩体交互发育的防护对象的边坡",{"id":455,"libraryId":5,"type":15,"typeLabel":16,"stem":456,"options":457,"answer":31,"analysis":33},904807,"施工工厂设施包括砂石加工系统，混凝土生产系统，压缩空气、供水、供电和通信系统，机械修配厂和加工厂等，下列说法正确的是（ ）。",[458,460,462,464],{"key":20,"text":459,"correct":22},"水利水电工地的混凝土预制件厂、钢筋加工厂和木材加工厂等应分开设置",{"key":24,"text":461,"correct":22},"施工给水系统一般由取水工程和输配水工程两部分组成",{"key":28,"text":463,"correct":22},"按用电负荷重要性将其分为三类",{"key":31,"text":465,"correct":26},"施工通信系统宜与地方通信网络相结合",{"id":467,"libraryId":5,"type":15,"typeLabel":16,"stem":468,"options":469,"answer":31,"analysis":33},904808,"施工工厂在进行规划布置时应遵循的原则不包括（ ）。",[470,472,474,476],{"key":20,"text":471,"correct":22},"厂址宜设于当地交通运输和水电供应方便处",{"key":24,"text":473,"correct":22},"应研究利用当地企业的生产设施，并兼顾梯级工厂施工需要",{"key":28,"text":475,"correct":22},"生活区宜与生产区分开",{"key":31,"text":477,"correct":26},"施工工厂的规划与设置无需考虑工程实施阶段的分标因素",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":20,"analysis":33},904810,"当汽车保养数量在50～300辆时，汽车保养站宜（ ）。",[482,484,486,488],{"key":20,"text":483,"correct":26},"集中设置",{"key":24,"text":485,"correct":22},"分散设置",{"key":28,"text":487,"correct":22},"分散设置或集中设置",{"key":31,"text":489,"correct":22},"无需设置",{"id":491,"libraryId":5,"type":15,"typeLabel":16,"stem":492,"options":493,"answer":31,"analysis":33},904811,"下列关于施工供电系统的说法错误的是（ ）。",[494,496,498,500],{"key":20,"text":495,"correct":22},"用电负荷分为一类负荷、二类负荷和三类负荷",{"key":24,"text":497,"correct":22},"大中型工程应具有两个以上的电源",{"key":28,"text":499,"correct":22},"井、洞内的照明属于一类负荷",{"key":31,"text":501,"correct":26},"竖井的土石方开挖施工主要设备属二类负荷",{"id":503,"libraryId":5,"type":15,"typeLabel":16,"stem":504,"options":505,"answer":20,"analysis":33},904812,"关于施工仓库的布置，下列说法错误的是（ ）。",[506,508,510,512],{"key":20,"text":507,"correct":26},"服务对象单一的仓库、堆场，必须靠近工程施工地点",{"key":24,"text":509,"correct":22},"服务于较多企业和工程的仓库，一般作为中心仓库",{"key":28,"text":511,"correct":22},"易爆易燃材料，应布置于不会危害企业、施工现场、生活福利区的安全位置",{"key":31,"text":513,"correct":22},"仓库的平面布置应尽量满足防火间距要求",{"id":515,"libraryId":5,"type":15,"typeLabel":16,"stem":516,"options":517,"answer":28,"analysis":33},904813,"关于施工管理办公建筑以及公共建筑的规划布置，下列说法错误的是（ ）。",[518,520,522,524],{"key":20,"text":519,"correct":22},"公共建筑规划布置的主要工作是合理确定公共建筑的项目内容、核定面积定额、计算指标及合理配置三个方面",{"key":24,"text":521,"correct":22},"局机关所在地一般设在位置适中，交通方便，且较为独立的地方",{"key":28,"text":523,"correct":26},"分局或工区机关应尽可能远离本单位生产区",{"key":31,"text":525,"correct":22},"工段或施工队一般设在车间、工段内部或本单位单职工宿舍区中",{"id":527,"libraryId":5,"type":15,"typeLabel":16,"stem":528,"options":529,"answer":28,"analysis":33},904814,"在施工场地区域规划后，进行各项临时设施的具体布置。下列关于分区布置原则的说法错误的是（ ）。",[530,532,534,536],{"key":20,"text":531,"correct":22},"主要物资仓库、站（场）等储运系统可布置在场内外交通干线衔接处",{"key":24,"text":533,"correct":22},"以混凝土建筑物为主的枢纽工程，施工区布置宜以砂石料开采、加工、混凝土拌和、浇筑系统为主",{"key":28,"text":535,"correct":26},"施工管理及生活区应远离主体工程施工区",{"key":31,"text":537,"correct":22},"生产、生活设施应有明显界限",{"id":539,"libraryId":5,"type":15,"typeLabel":16,"stem":540,"options":541,"answer":24,"analysis":33},904815,"关于施工总布置应遵循的原则，下列说法错误的是（ ）。",[542,544,546,548],{"key":20,"text":543,"correct":22},"施工场地布置应与交通运输线路布置相结合",{"key":24,"text":545,"correct":26},"施工总布置应紧凑合理，节约用地，尽量避开坡地",{"key":28,"text":547,"correct":22},"施工总布置方案宜采用有利于施工封闭管理的布置方案",{"key":31,"text":549,"correct":22},"尽量提高工程施工机械化程度",{"id":551,"libraryId":5,"type":15,"typeLabel":16,"stem":552,"options":553,"answer":28,"analysis":33},904816,"棚式仓库的棚顶高度应不低于（ ），以利于搬运和通风。",[554,556,558,560],{"key":20,"text":555,"correct":22},"3.5m",{"key":24,"text":557,"correct":22},"4.0m",{"key":28,"text":559,"correct":26},"4.5m",{"key":31,"text":561,"correct":22},"5.5m",{"id":563,"libraryId":5,"type":15,"typeLabel":16,"stem":564,"options":565,"answer":20,"analysis":33},904817,"施工场地选择的步骤如下，其正确顺序为（ ）。 ①确定临时建筑项目，初步估算各项目的建筑物面积和占地面积； ②对各方案进行初步分区布置，估算运输量及其分配，初选场内运输方式，进行场内交通线路规划； ③初步考虑其内部的区域划分，拟订可能的区域规划方案； ④研究方案的防洪、排水条件； ⑤布置方案的供风、供水和供电系统； ⑥进行技术经济比较，选定施工场地； ⑦初步估算方案的场地平整工程量，主要交通线路、桥梁隧道等工程量及造价。",[566,568,570,572],{"key":20,"text":567,"correct":26},"①→③→②→⑤→④→⑦→⑥",{"key":24,"text":569,"correct":22},"①→③→②→⑤→⑦→④→⑥",{"key":28,"text":571,"correct":22},"③→①→②→⑤→④→⑦→⑥",{"key":31,"text":573,"correct":22},"③→①→②→⑤→⑦→④→⑥",{"id":575,"libraryId":5,"type":15,"typeLabel":16,"stem":576,"options":577,"answer":20,"analysis":33},904818,"在区域规划中，利水电工程一般多采用（ ）。",[578,580,582,584],{"key":20,"text":579,"correct":26},"混合式布置",{"key":24,"text":581,"correct":22},"集中布置",{"key":28,"text":583,"correct":22},"分散布置",{"key":31,"text":585,"correct":22},"区域布置",{"id":587,"libraryId":5,"type":15,"typeLabel":16,"stem":588,"options":589,"answer":31,"analysis":33},904819,"仓库按结构形式可分为三类，其中不包括（ ）。",[590,592,594,596],{"key":20,"text":591,"correct":22},"露天式",{"key":24,"text":593,"correct":22},"封闭式",{"key":28,"text":595,"correct":22},"棚式",{"key":31,"text":597,"correct":26},"半封闭式",{"id":599,"libraryId":5,"type":15,"typeLabel":16,"stem":600,"options":601,"answer":31,"analysis":33},904820,"土石方平衡的原则不包括（ ）。",[602,604,606,608],{"key":20,"text":603,"correct":22},"料尽其用",{"key":24,"text":605,"correct":22},"时间匹配",{"key":28,"text":607,"correct":22},"容量适度",{"key":31,"text":609,"correct":26},"安排合理",{"id":611,"libraryId":5,"type":15,"typeLabel":16,"stem":612,"options":613,"answer":24,"analysis":33},904821,"关于土石方平衡，下列说法正确的是（ ）。",[614,616,618,620],{"key":20,"text":615,"correct":22},"土石方调配可按非线性规划理论进行计算",{"key":24,"text":617,"correct":26},"堆存原则是易堆易取",{"key":28,"text":619,"correct":22},"堆存位置最好远离用料点或料场",{"key":31,"text":621,"correct":22},"弃渣场选择与堆弃原则是尽可能位于库区外",[623,626,629,632,635,638],{"id":15,"name":624,"category":7,"favorite":625},"领导干部任职前廉政法规知识测试题",92,{"id":627,"name":628,"category":7,"favorite":15},595,"建筑结构与设备",{"id":630,"name":631,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":633,"name":634,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":636,"name":637,"category":7,"favorite":8},534,"BIM工程师",{"id":639,"name":637,"category":7,"favorite":8},535]