[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-585-12":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":609},{"id":5,"name":6,"category":7,"favorite":8},585,"建设工程技术与计量（水利）","建筑工程",0,12,50,1200,[13,34,46,58,69,81,90,102,114,126,138,150,162,174,186,198,210,222,234,246,258,265,275,287,299,311,323,335,347,359,371,383,395,407,419,431,441,453,465,477,489,501,513,525,537,549,561,573,585,597],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":24,"analysis":33},904721,1,"单选题","施工导流方式，大体上可分为两类，即分段围堰法导流和（ ）。",[19,23,27,30],{"key":20,"text":21,"correct":22},"A","明渠导流",false,{"key":24,"text":25,"correct":26},"B","全段围堰法导流",true,{"key":28,"text":29,"correct":22},"C","涵管导流",{"key":31,"text":32,"correct":22},"D","淹没基坑法导流","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":31,"analysis":33},904722,"水利水电工程中，分期围堰导流不适用于（ ）。",[38,40,42,44],{"key":20,"text":39,"correct":22},"河床宽的工程",{"key":24,"text":41,"correct":22},"流量大的工程",{"key":28,"text":43,"correct":22},"工期较长的工程",{"key":31,"text":45,"correct":26},"岸坡平缓的平原河道",{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":20,"analysis":33},904723,"下列不属于底孔导流缺点的是（ ）。",[50,52,54,56],{"key":20,"text":51,"correct":26},"挡水建筑物上部的施工可以不受水流干扰",{"key":24,"text":53,"correct":22},"坝体内设置了临时底孔，使钢材用量增加",{"key":28,"text":55,"correct":22},"导流流量往往不大",{"key":31,"text":57,"correct":22},"若封堵不好会影响坝的整体性",{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":24,"analysis":33},904724,"在修建大体积混凝土坝时常采用的导流方式是（ ）。",[62,64,66,67],{"key":20,"text":63,"correct":22},"束窄河床导流",{"key":24,"text":65,"correct":26},"坝体缺口导流",{"key":28,"text":21,"correct":22},{"key":31,"text":68,"correct":22},"隧洞导流",{"id":70,"libraryId":5,"type":15,"typeLabel":16,"stem":71,"options":72,"answer":20,"analysis":33},904725,"下列指标中，不属于施工导流建筑物级别的确定依据的是（ ）。",[73,75,77,79],{"key":20,"text":74,"correct":26},"洪水标准",{"key":24,"text":76,"correct":22},"保护对象",{"key":28,"text":78,"correct":22},"失事后果",{"key":31,"text":80,"correct":22},"工程规模",{"id":82,"libraryId":5,"type":15,"typeLabel":16,"stem":83,"options":84,"answer":28,"analysis":33},904726,"在河床狭窄、山岩坚实的地区宜采用的施工导流方式是（ ）。",[85,87,88,89],{"key":20,"text":86,"correct":22},"分段围堰法导流",{"key":24,"text":29,"correct":22},{"key":28,"text":68,"correct":26},{"key":31,"text":21,"correct":22},{"id":91,"libraryId":5,"type":15,"typeLabel":16,"stem":92,"options":93,"answer":31,"analysis":33},904727,"下列关于水利水电工程围堰分类不正确的是（ ）。 A.按围堰所使用的材料可分为土石围堰、草土围堰、袋装土围堰、胶凝砂砾石（CS",[94,96,98,100],{"key":20,"text":95,"correct":22},"围堰、钢板桩格型围堰和混凝土围堰等",{"key":24,"text":97,"correct":22},"按围堰与水流方向的相对位置可分为横向围堰和纵向围堰",{"key":28,"text":99,"correct":22},"按导流期间基坑淹没条件可分为过水围堰和不过水围堰",{"key":31,"text":101,"correct":26},"按围堰基本构造可分为混凝土板护面过水土石围堰和加筋过水土石围堰",{"id":103,"libraryId":5,"type":15,"typeLabel":16,"stem":104,"options":105,"answer":31,"analysis":33},904728,"地下水在纯重力作用下流入井中，被水泵抽走的人工降低地下水位的方法是（ ）。",[106,108,110,112],{"key":20,"text":107,"correct":22},"集水坑降水",{"key":24,"text":109,"correct":22},"轻型井点降水",{"key":28,"text":111,"correct":22},"喷射井点降水",{"key":31,"text":113,"correct":26},"管井降水",{"id":115,"libraryId":5,"type":15,"typeLabel":16,"stem":116,"options":117,"answer":28,"analysis":33},904729,"坝壳料的主要压实机械包括振动平碾和气胎碾，下列关于压实机械以及碾压要求的说法错误的是（ ）。",[118,120,122,124],{"key":20,"text":119,"correct":22},"气胎碾可用于压实砂、砂砾料、砾质土",{"key":24,"text":121,"correct":22},"除坝面特殊部位外，碾压方向应沿轴线方向进行",{"key":28,"text":123,"correct":26},"分段碾压时，相邻两段交接带的碾迹应垂直碾压方向，搭接宽度应不小于1.0～1.5m",{"key":31,"text":125,"correct":22},"振动碾压实功能大，碾压遍数少",{"id":127,"libraryId":5,"type":15,"typeLabel":16,"stem":128,"options":129,"answer":31,"analysis":33},904730,"关于人工开挖土方，下列说法错误的是（ ）。",[130,132,134,136],{"key":20,"text":131,"correct":22},"不具备采用机械开挖的条件时，可采用人工开挖",{"key":24,"text":133,"correct":22},"渠道宜采用分段施工的平行流水作业组织方式进行开挖",{"key":28,"text":135,"correct":22},"开挖冻土时，可采用爆破松土与装载机配合来提高开挖效率",{"key":31,"text":137,"correct":26},"处于河床以下的建筑物基础开挖过程中，临近设计高程时，应留出0.1m的保护层暂不开挖",{"id":139,"libraryId":5,"type":15,"typeLabel":16,"stem":140,"options":141,"answer":20,"analysis":33},904731,"适用于料场和基坑的大规模、高强度开挖的爆破方法为（ ）。",[142,144,146,148],{"key":20,"text":143,"correct":26},"深孔爆破",{"key":24,"text":145,"correct":22},"浅孔爆破",{"key":28,"text":147,"correct":22},"光面爆破",{"key":31,"text":149,"correct":22},"预裂爆破",{"id":151,"libraryId":5,"type":15,"typeLabel":16,"stem":152,"options":153,"answer":24,"analysis":33},904732,"在土层较薄，土料层次少且相对均质、天然含水量偏高需翻晒减水的情况下，宜采用（ ）。",[154,156,158,160],{"key":20,"text":155,"correct":22},"陆上开采方法",{"key":24,"text":157,"correct":26},"平面开采方法",{"key":28,"text":159,"correct":22},"立面开采方法",{"key":31,"text":161,"correct":22},"水下开采方法",{"id":163,"libraryId":5,"type":15,"typeLabel":16,"stem":164,"options":165,"answer":31,"analysis":33},904733,"20世纪60年代以后，土砂松坡接触平起法已成为趋于规范化的施工方法，下列说法错误的是（ ）。",[166,168,170,172],{"key":20,"text":167,"correct":22},"土砂松坡接触平起法一般分为先砂后土法、先土后砂法、土砂交替法几种",{"key":24,"text":169,"correct":22},"工程较多采用先砂后土法",{"key":28,"text":171,"correct":22},"土砂松坡接触平起法允许反滤料与相邻土料“犬牙交错”",{"key":31,"text":173,"correct":26},"先砂后土法，当反滤层宽度较小（＜3m）时，铺2层反滤料，填2层土料",{"id":175,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":177,"answer":24,"analysis":33},904734,"常用的土方挖桩机械中，同时具有运输和摊铺功能的是（ ）。",[178,180,182,184],{"key":20,"text":179,"correct":22},"推土机",{"key":24,"text":181,"correct":26},"铲运机",{"key":28,"text":183,"correct":22},"装载机",{"key":31,"text":185,"correct":22},"拉铲挖掘机",{"id":187,"libraryId":5,"type":15,"typeLabel":16,"stem":188,"options":189,"answer":24,"analysis":33},904735,"以下哪种情况可直立开挖而不加支护（ ）",[190,192,194,196],{"key":20,"text":191,"correct":22},"水文地质状况良好且开挖深度为4m",{"key":24,"text":193,"correct":26},"水文地质状况良好且开挖深度为1.5m",{"key":28,"text":195,"correct":22},"水文地质状况良好且开挖深度为6m",{"key":31,"text":197,"correct":22},"基坑较深、水文地质情况较为复杂",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":28,"analysis":33},904736,"在地质条件较好的地下厂房中，顶拱开挖采用（ ）的方法。",[202,204,206,208],{"key":20,"text":203,"correct":22},"两侧扩挖先行掘进，中导洞跟进",{"key":24,"text":205,"correct":22},"边导洞分块开挖",{"key":28,"text":207,"correct":26},"中导洞先行掘进，两侧扩挖跟进",{"key":31,"text":209,"correct":22},"边导洞超前开挖",{"id":211,"libraryId":5,"type":15,"typeLabel":16,"stem":212,"options":213,"answer":31,"analysis":33},904737,"正铲挖掘机采用正向开挖、侧向装土法时，铲臂卸土回转角度应（ ）。",[214,216,218,220],{"key":20,"text":215,"correct":22},"大于45°",{"key":24,"text":217,"correct":22},"大于60°",{"key":28,"text":219,"correct":22},"小于60°",{"key":31,"text":221,"correct":26},"小于90°",{"id":223,"libraryId":5,"type":15,"typeLabel":16,"stem":224,"options":225,"answer":31,"analysis":33},904738,"在完成壁后注浆之后，需要进行二次注浆的情况不包括（ ）。",[226,228,230,232],{"key":20,"text":227,"correct":22},"隧道成形后地面沉降仍有较大的变化趋势",{"key":24,"text":229,"correct":22},"局部地层较软",{"key":28,"text":231,"correct":22},"同步注浆注浆量不足",{"key":31,"text":233,"correct":26},"压浆时未对称",{"id":235,"libraryId":5,"type":15,"typeLabel":16,"stem":236,"options":237,"answer":24,"analysis":33},904739,"采用钻孔爆破法进行地下洞室的开挖的施工工序如下，其正确顺序为（ ）。 ①钻孔；②堵塞；③起爆；④装药；⑤通风散烟；⑥安全检查与处理；⑦出渣运输；⑧初期支护。",[238,240,242,244],{"key":20,"text":239,"correct":22},"①→④→②→③→⑤→⑧→⑥→⑦",{"key":24,"text":241,"correct":26},"①→④→②→③→⑤→⑥→⑧→⑦",{"key":28,"text":243,"correct":22},"④→①→②→③→⑤→⑧→⑥→⑦",{"key":31,"text":245,"correct":22},"④→①→②→③→⑤→⑥→⑧→⑦",{"id":247,"libraryId":5,"type":15,"typeLabel":16,"stem":248,"options":249,"answer":24,"analysis":33},904740,"关于土方开挖的一般要求，下列说法错误的是（ ）。",[250,252,254,256],{"key":20,"text":251,"correct":22},"确保设计的开挖轮廓尺寸",{"key":24,"text":253,"correct":26},"应依据设计确定开挖顺序，开挖顺序包括自上而下、自下而上和上下同时开挖",{"key":28,"text":255,"correct":22},"防止地表水和地下水影响开挖作业",{"key":31,"text":257,"correct":22},"制订合理的边坡支护方案，确保施工安全",{"id":259,"libraryId":5,"type":15,"typeLabel":16,"stem":176,"options":260,"answer":24,"analysis":33},904741,[261,262,263,264],{"key":20,"text":179,"correct":22},{"key":24,"text":181,"correct":26},{"key":28,"text":183,"correct":22},{"key":31,"text":185,"correct":22},{"id":266,"libraryId":5,"type":15,"typeLabel":16,"stem":267,"options":268,"answer":20,"analysis":33},904742,"土石坝料场开采应采用的挖桩机械为（ ）。",[269,271,272,274],{"key":20,"text":270,"correct":26},"斗轮挖掘机",{"key":24,"text":183,"correct":22},{"key":28,"text":273,"correct":22},"反铲挖掘机",{"key":31,"text":185,"correct":22},{"id":276,"libraryId":5,"type":15,"typeLabel":16,"stem":277,"options":278,"answer":20,"analysis":33},904743,"下列各项中，不属于反铲挖掘机的开挖方法的是（ ）。",[279,281,283,285],{"key":20,"text":280,"correct":26},"正向开挖、侧向装土法",{"key":24,"text":282,"correct":22},"端向开挖法",{"key":28,"text":284,"correct":22},"侧向开挖法",{"key":31,"text":286,"correct":22},"多层接力开挖法",{"id":288,"libraryId":5,"type":15,"typeLabel":16,"stem":289,"options":290,"answer":20,"analysis":33},904744,"根据施工场地的不同，铲运机常用的开行路线不包括（ ）。",[291,293,295,297],{"key":20,"text":292,"correct":26},"圆形开行路线",{"key":24,"text":294,"correct":22},"“8”字形开行路线",{"key":28,"text":296,"correct":22},"大环形开行路线",{"key":31,"text":298,"correct":22},"连续式开行路线",{"id":300,"libraryId":5,"type":15,"typeLabel":16,"stem":301,"options":302,"answer":31,"analysis":33},904745,"关于坝基的开挖方式，下列说法错误的是（ ）。",[303,305,307,309],{"key":20,"text":304,"correct":22},"坝基开挖的一般原则是自上而下地顺坡开挖",{"key":24,"text":306,"correct":22},"开挖深度大于4m时，一般采用分层开挖",{"key":28,"text":308,"correct":22},"基岩开挖深度小于4.0m时，采用薄层开挖",{"key":31,"text":310,"correct":26},"基岩开挖深度小于4.0m时，根据不同部位，可单独采用有劈坡开挖、大面积浅孔爆破开挖、结合保护层开挖、一次爆除开挖方法等",{"id":312,"libraryId":5,"type":15,"typeLabel":16,"stem":313,"options":314,"answer":20,"analysis":33},904746,"平洞开挖主要采用下列哪种爆破方法控制开挖轮廓？（ ）",[315,317,319,321],{"key":20,"text":316,"correct":26},"光面爆破法",{"key":24,"text":318,"correct":22},"欲裂爆破法",{"key":28,"text":320,"correct":22},"深孔爆破法",{"key":31,"text":322,"correct":22},"浅孔爆破法",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":24,"analysis":33},904747,"评价光面爆破效果的主要标准不包括（ ）。",[327,329,331,333],{"key":20,"text":328,"correct":22},"开挖轮廓成型规则，岩面平整",{"key":24,"text":330,"correct":26},"围岩壁上的半孔壁保存率不低于60%",{"key":28,"text":332,"correct":22},"孔壁上无明显的爆破裂隙",{"key":31,"text":334,"correct":22},"超欠挖符合规定要求，围岩上无危石",{"id":336,"libraryId":5,"type":15,"typeLabel":16,"stem":337,"options":338,"answer":31,"analysis":33},904748,"关于地下厂房洞室群开挖，下列说法正确的是（ ）。",[339,341,343,345],{"key":20,"text":340,"correct":22},"地下厂房开挖分层高度在6～8m范围内",{"key":24,"text":342,"correct":22},"地下厂房洞室群中洞室采用立体作业为主，平面作业为辅",{"key":28,"text":344,"correct":22},"一般每方混凝土中钢纤维添加量为70～80kg",{"key":31,"text":346,"correct":26},"厂房顶拱层的开挖高度一般在7～10m范围内",{"id":348,"libraryId":5,"type":15,"typeLabel":16,"stem":349,"options":350,"answer":31,"analysis":33},904749,"地下厂房洞室群施工时废水不包括（ ）。",[351,353,355,357],{"key":20,"text":352,"correct":22},"开挖期间含油污和含氮氧化合物的废水",{"key":24,"text":354,"correct":22},"混凝土施工时产生的废水",{"key":28,"text":356,"correct":22},"山体渗水",{"key":31,"text":358,"correct":26},"开挖期间用于工人清洗的废水",{"id":360,"libraryId":5,"type":15,"typeLabel":16,"stem":361,"options":362,"answer":24,"analysis":33},904750,"关于各类岩石隧道掘进机的适用范围，下列说法错误的是（ ）。",[363,365,367,369],{"key":20,"text":364,"correct":22},"敞开式TBM适用于围岩整体较完整，且有较好的自稳能力",{"key":24,"text":366,"correct":26},"当隧道以软弱围岩为主，抗压强度较低时，双护盾TBM较为合适",{"key":28,"text":368,"correct":22},"单护盾TBM主要适用于复杂地质条件的隧道",{"key":31,"text":370,"correct":22},"当围岩有软有硬、同时又有较多的断层破碎带时，双护盾TBM具有更大的优势",{"id":372,"libraryId":5,"type":15,"typeLabel":16,"stem":373,"options":374,"answer":24,"analysis":33},904751,"TBM到达掘进的最后（ ）要根据围岩的地质情况确定合理的掘进参数并做出书面交底。",[375,377,379,381],{"key":20,"text":376,"correct":22},"15m",{"key":24,"text":378,"correct":26},"20m",{"key":28,"text":380,"correct":22},"25m",{"key":31,"text":382,"correct":22},"30m",{"id":384,"libraryId":5,"type":15,"typeLabel":16,"stem":385,"options":386,"answer":31,"analysis":33},904752,"关于顶管开挖的分类，下列说法错误的是（ ）。",[387,389,391,393],{"key":20,"text":388,"correct":22},"按顶管口径大小可分为大口径、中口径、小口径和微型顶管",{"key":24,"text":390,"correct":22},"按一次顶进长度可分为普通距离顶管和长距离顶管",{"key":28,"text":392,"correct":22},"按管材可分为钢筋混凝土顶管、钢管顶管以及其他材料的顶管",{"key":31,"text":394,"correct":26},"按顶管机的破土方式可分为直线顶管和曲线顶管",{"id":396,"libraryId":5,"type":15,"typeLabel":16,"stem":397,"options":398,"answer":28,"analysis":33},904753,"错缝拼装是使相邻衬砌圆环的纵缝错开管片长度的（ ）。",[399,401,403,405],{"key":20,"text":400,"correct":22},"1\u002F8～1\u002F4",{"key":24,"text":402,"correct":22},"1\u002F4～1\u002F3",{"key":28,"text":404,"correct":26},"1\u002F3～1\u002F2",{"key":31,"text":406,"correct":22},"1\u002F2～3\u002F4",{"id":408,"libraryId":5,"type":15,"typeLabel":16,"stem":409,"options":410,"answer":20,"analysis":33},904754,"盾构掘进为循环性的工艺，步骤如下，其正确顺序为（ ）。 ①盾构开始掘进前，须根据掘进指令设定各种参数； ②掘进行程达到管片拼装条件后，停止掘进，开始拼装管片，1号列车驶离盾构机； ③开始盾构掘进，同步注浆与掘进并行； ④拼装管片，2号列车待1号列车出隧道后，驶入盾构机处； ⑤继续下环推进； ⑥2号列车浆液转驳，管片吊装； ⑦安装、延长盾构机台车后方的管路、走道、照明； ⑧安装轨枕、延长电瓶车与台车轨道。",[411,413,415,417],{"key":20,"text":412,"correct":26},"①→③→②→④→⑥→⑤→⑧→⑦",{"key":24,"text":414,"correct":22},"①→③→②→④→⑥→⑧→⑤→⑦",{"key":28,"text":416,"correct":22},"③→①→②→④→⑥→⑧→⑤→⑦",{"key":31,"text":418,"correct":22},"③→①→②→④→⑥→⑤→⑧→⑦",{"id":420,"libraryId":5,"type":15,"typeLabel":16,"stem":421,"options":422,"answer":28,"analysis":33},904755,"开敞式TBM掘进施工过程中需要的施工材料以及TBM消耗品等的运输都是（ ）。",[423,425,427,429],{"key":20,"text":424,"correct":22},"无轨运输",{"key":24,"text":426,"correct":22},"连续皮带机运输",{"key":28,"text":428,"correct":26},"有轨运输",{"key":31,"text":430,"correct":22},"门式运输",{"id":432,"libraryId":5,"type":15,"typeLabel":16,"stem":433,"options":434,"answer":20,"analysis":33},904756,"当土层较厚，天然含水量接近填筑含水量，土料层次较多，各层土质差异较大时，宜采用的涂料开采方式是（ ）。",[435,436,438,439],{"key":20,"text":159,"correct":26},{"key":24,"text":437,"correct":22},"混合开采方法",{"key":28,"text":157,"correct":22},{"key":31,"text":440,"correct":22},"分期分区开采方法",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},904757,"关于坝体填筑工艺流程，下列说法错误的是（ ）。",[445,447,449,451],{"key":20,"text":446,"correct":22},"坝体填筑工艺流程包括测量放样、卸料、摊铺、压实和质检",{"key":24,"text":448,"correct":26},"小区、垫层和过渡层采用进占法卸料",{"key":28,"text":450,"correct":22},"在洒水过程中，坝内洒水对中低坝一般用高位水池、布设水管的洒水方法",{"key":31,"text":452,"correct":22},"在压实过程中，应采用进退错距法碾压",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":24,"analysis":33},904758,"关于料场规划的基本要求，下列说法错误的是（ ）。",[457,459,461,463],{"key":20,"text":458,"correct":22},"料场规划应考虑充分利用永久和临时建筑物基础开挖的渣料",{"key":24,"text":460,"correct":26},"反滤料应根据筛后有效方量确定，一般不宜小于2",{"key":28,"text":462,"correct":22},"料场规划应对主要料场和备用料场分别加以考虑",{"key":31,"text":464,"correct":22},"在规划料场实际可开采总量时，应考虑料场查勘的精度、料场天然密度与坝体压实密度的差异",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":28,"analysis":33},904759,"关于土料的开采与加工，下列说法错误的是（ ）。",[469,471,473,475],{"key":20,"text":470,"correct":22},"在进行反滤料的开采和加工时，若无砂砾石料可供使用，可用开采碎石加工制备",{"key":24,"text":472,"correct":22},"水下开采，一般采用采砂船配索铲",{"key":28,"text":474,"correct":26},"块石料开采方法一般采用洞室爆破",{"key":31,"text":476,"correct":22},"超径块石料的处理方法，主要有浅孔爆破法和机械破碎法两种",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":31,"analysis":33},904760,"关于反滤料的铺填，下列说法正确的是（ ）。",[481,483,485,487],{"key":20,"text":482,"correct":22},"当反滤层宽度大于5m时，可采用推土机摊铺平整",{"key":24,"text":484,"correct":22},"当铺料宽度小于2m时，可选用10t以下后卸式汽车运料",{"key":28,"text":486,"correct":22},"当反滤层宽度大于2m时，可沿反滤层以后退法卸料",{"key":31,"text":488,"correct":26},"填土与反滤料的“犬牙交错”带宽度一般不得大于填土层厚的1.5倍",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":20,"analysis":33},904761,"厚度大于20cm，长、宽各为厚度的2～3倍，上下两面平行且大致平整，无尖角、薄边的石块为（ ）。",[493,495,497,499],{"key":20,"text":494,"correct":26},"块石",{"key":24,"text":496,"correct":22},"卵石",{"key":28,"text":498,"correct":22},"片石",{"key":31,"text":500,"correct":22},"毛条石",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":31,"analysis":33},904762,"砌石体的胶凝材料中，混凝土常用的标号强度不包括（ ）。",[505,507,509,511],{"key":20,"text":506,"correct":22},"10.0MPa",{"key":24,"text":508,"correct":22},"15.0MPa",{"key":28,"text":510,"correct":22},"20.0MPa",{"key":31,"text":512,"correct":26},"25.0MPa",{"id":514,"libraryId":5,"type":15,"typeLabel":16,"stem":515,"options":516,"answer":31,"analysis":33},904763,"关于土料压实工序，下列说法错误的是（ ）。",[517,519,521,523],{"key":20,"text":518,"correct":22},"防渗体土料压实机械主要用凸块振动碾",{"key":24,"text":520,"correct":22},"凸块振动碾用于黏性土料、砾质土及软弱风化土石混合料",{"key":28,"text":522,"correct":22},"气胎碾适用于黏性土、砾质土，含水量范围偏于上限的土料",{"key":31,"text":524,"correct":26},"压实后填土表面需刨毛处理",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":31,"analysis":33},904764,"关于常用土方施工机械的经济运距，下列说法错误的是（ ）。",[529,531,533,535],{"key":20,"text":530,"correct":22},"履带式推土机的推运距离为15～30m时，可获得最大的生产率",{"key":24,"text":532,"correct":22},"履带式装载机运距不超过100m",{"key":28,"text":534,"correct":22},"自卸汽车在运距方面的适应性较强",{"key":31,"text":536,"correct":26},"牵引式铲运机的经济运距一般为200m",{"id":538,"libraryId":5,"type":15,"typeLabel":16,"stem":539,"options":540,"answer":20,"analysis":33},904765,"土石坝中，最为普遍的一种类型是（ ）。",[541,543,545,547],{"key":20,"text":542,"correct":26},"碾压式土石坝",{"key":24,"text":544,"correct":22},"抛填式堆石坝",{"key":28,"text":546,"correct":22},"定向爆破式堆石坝",{"key":31,"text":548,"correct":22},"水利冲压坝",{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":24,"analysis":33},904766,"关于黏性土和非黏性土的填筑标准，下列说法错误的是（ ）。",[553,555,557,559],{"key":20,"text":554,"correct":22},"含砾和不含砾的黏性土的填筑标准应以压实度和最优含水率作为设计控制指标",{"key":24,"text":556,"correct":26},"1级、2级坝和高坝的压实度应为100%",{"key":28,"text":558,"correct":22},"土质防渗体分区坝的堆石料，孔隙率宜为20%～28%",{"key":31,"text":560,"correct":22},"砂砾石的相对密度不应低于0.75",{"id":562,"libraryId":5,"type":15,"typeLabel":16,"stem":563,"options":564,"answer":20,"analysis":33},904767,"关于压实系数，下列说法正确的是（ ）。",[565,567,569,571],{"key":20,"text":566,"correct":26},"土料填筑压实参数主要包括碾压机具的重量、含水量、碾压遍数及铺土厚度等",{"key":24,"text":568,"correct":22},"黏性土料压实含水量可取土料塑限并上下浮动1%进行试验",{"key":28,"text":570,"correct":22},"单位压实遍数的压实厚度最小者最为经济、合理",{"key":31,"text":572,"correct":22},"对黏性土料的试验，只需作铺土厚度、压实遍数和干密度的关系曲线",{"id":574,"libraryId":5,"type":15,"typeLabel":16,"stem":575,"options":576,"answer":31,"analysis":33},904768,"坝面土料含水率仅在特殊情况下，可做出调整，其调整方法不包括（ ）。",[577,579,581,583],{"key":20,"text":578,"correct":22},"土料加水",{"key":24,"text":580,"correct":22},"土料的干燥",{"key":28,"text":582,"correct":22},"在干燥和气温较高天气，应做喷雾加水养护",{"key":31,"text":584,"correct":26},"添加土料",{"id":586,"libraryId":5,"type":15,"typeLabel":16,"stem":587,"options":588,"answer":24,"analysis":33},904769,"适用于施工场面小，施工强度低的情况的土料加水方式为（ ）。",[589,591,593,595],{"key":20,"text":590,"correct":22},"汽车洒水",{"key":24,"text":592,"correct":26},"管道加水",{"key":28,"text":594,"correct":22},"喷雾加水",{"key":31,"text":596,"correct":22},"人工洒水",{"id":598,"libraryId":5,"type":15,"typeLabel":16,"stem":599,"options":600,"answer":20,"analysis":33},904770,"钢筋中心线同直线的偏差不应超过其全长的（ ）。",[601,603,605,607],{"key":20,"text":602,"correct":26},"1%",{"key":24,"text":604,"correct":22},"2%",{"key":28,"text":606,"correct":22},"3%",{"key":31,"text":608,"correct":22},"4%",[610,613,616,619,622,625],{"id":15,"name":611,"category":7,"favorite":612},"领导干部任职前廉政法规知识测试题",92,{"id":614,"name":615,"category":7,"favorite":15},595,"建筑结构与设备",{"id":617,"name":618,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":620,"name":621,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":623,"name":624,"category":7,"favorite":8},534,"BIM工程师",{"id":626,"name":624,"category":7,"favorite":8},535]