[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905331":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},905331,585,2,"多选题","下列关于土石方的开挖工程量，说法正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","开挖工程量将不同等级的土石方分开分别计算，以实体方计量",false,{"key":16,"text":17,"correct":18},"B","土方开挖工程分为明挖工程和暗挖工程",true,{"key":20,"text":21,"correct":18},"C","砌筑工程量以建筑物砌体方计量",{"key":23,"text":24,"correct":14},"D","现行概算定额中填方按自然方计量",{"key":26,"text":27,"correct":14},"E","现行概算定额中土石方的运输按实体方计量","BC","A项错，土石方的开挖工程量，应根据工程布置图切取剖面按土类分级表、岩石类别分级表划分的十六级分类标准，将不同等级的土石方分开分别计算，以自然方计量。 DE两项错，现行概预算定额中，土石方的开挖、装卸、运输是按自然方计量的，填方则是按实体方体积计量的。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]