[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905298":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},905298,585,2,"多选题","关于固结灌浆施工工艺及技术要求，下列说法错误的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","灌浆孔的施工按分序加密的原则进行",false,{"key":16,"text":17,"correct":18},"B","灌浆压力大于5MPa的工程，灌浆孔应分段进行灌浆",true,{"key":20,"text":21,"correct":18},"C","灌浆孔灌浆前的压水试验采用五点法",{"key":23,"text":24,"correct":14},"D","灌浆质量压水试验检查，孔段合格率应在80%以上",{"key":26,"text":27,"correct":18},"E","在规定的压力下，当注入率不大于0.41\u002Fmin时，继续灌注60min","BCE","A项，灌浆孔的施工按分序加密的原则进行，可分为二序施工或三序施工。每孔采取自上而下分段钻进、分段灌浆或钻进终孔后进行灌浆。B项，灌浆孔基岩段长小于6m时，可全孔一次灌浆。当地质条件不良或有特殊要求时，可分段灌浆。灌浆压力大于3MPa的工程，灌浆孔应分段进行灌浆。C项，灌浆孔灌浆前的压水试验应在裂隙冲洗后进行，采用单点法。D项，灌浆质量压水试验检查，孔段合格率应在80%以上，不合格孔段的透水率值不超过设计规定值的50%，且不集中。E项，在规定的压力下，当注入率不大于0.41\u002Fmin时，继续灌注30min，灌浆可以结束。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]