[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905297":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},905297,585,2,"多选题","在灌浆前应进行钻孔、钻孔冲洗、孔壁冲洗、裂隙冲洗和压水试验等工序，下列说法正确的有（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","钻机立轴和孔口管的方向必须与设计孔向一致",true,{"key":16,"text":17,"correct":14},"B","孔内沉积厚度不得超过20cm",{"key":19,"text":20,"correct":14},"C","灌浆孔宜选用较小的孔径",{"key":22,"text":23,"correct":14},"D","灌浆前宜采用压力水进行裂隙冲洗",{"key":25,"text":26,"correct":27},"E","冲洗压力可为灌浆压力的70%",false,"ABCD","AC两项，钻孔质量要求有：①钻孔位置与设计位置的偏差不得大于10cm。②孔深应符合设计规定。③灌浆孔宜选用较小的孔径，钻孔孔壁应平直完整。④钻孔必须保证孔向准确。钻机安装必须平正稳固；钻孔宜埋设孔口管；钻机立轴和孔口管的方向必须与设计孔向一致；钻进应采用较长的粗径钻具并适当地控制钻进压力。BDE三项，灌浆孔（段）在灌浆前应进行钻孔冲洗，孔内沉积厚度不得超过20cm。同时在灌浆前宜采用压力水进行裂隙冲洗，直至回水清净时止。冲洗压力可为灌浆压力的80%，该值若大于1MPa，采用1MPa。冲洗时，可将冲洗管插入孔内，用阻塞器将孔口堵紧，用压力水冲洗、压力水和压缩空气轮换冲洗或压力水和压缩空气混合冲洗。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]