[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905112":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},905112,585,2,"多选题","（ ）工程计价属于市场行为，执行《水利工程工程量清单计价规范》（GB 50501—2007）",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","规划阶段",false,{"key":16,"text":17,"correct":14},"B","可行性研究阶段",{"key":19,"text":20,"correct":21},"C","招标投标阶段",true,{"key":23,"text":24,"correct":21},"D","施工建设阶段",{"key":26,"text":27,"correct":21},"E","完工阶段","CDE","本题考查的是水利水电工程设计工程量计算。招标设计阶段、招标投标阶段、施工建设阶段，以及完工阶段中涉及工程计价属于市场行为，执行2007年水利部编制的《水利工程工程量清单计价规范》（GB 50501—2007）。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]