[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905111":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},905111,585,2,"多选题","施工损耗量包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","施工附加量",false,{"key":16,"text":17,"correct":18},"B","运输损耗量",true,{"key":20,"text":21,"correct":18},"C","操作损耗量",{"key":23,"text":24,"correct":14},"D","施工超挖量",{"key":26,"text":27,"correct":18},"E","体积变化损耗量","BCE","本题考查的是水利水电工程设计工程量计算。施工损耗量包括运输及操作损耗，体积变化损耗及其他损耗。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]