[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905100":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},905100,585,2,"多选题","骨料生产过程的损失系数包括（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","开挖作业",true,{"key":16,"text":17,"correct":14},"B","加工过程",{"key":19,"text":20,"correct":14},"C","运输堆存",{"key":22,"text":23,"correct":14},"D","混凝土生产",{"key":25,"text":26,"correct":27},"E","混凝土运输、浇筑",false,"ABCD","本题考查的是骨料生产及加工。骨料生产过程的损失系数包括开挖作业、加工过程、运输堆存和混凝土生产等环节的损失系数。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]