[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-905093":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},905093,585,2,"多选题","下列关于地下洞室开挖顺序说法正确的有（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","变高洞为低洞",true,{"key":16,"text":17,"correct":18},"B","变小跨度为大跨度",false,{"key":20,"text":21,"correct":14},"C","先拱部后底部",{"key":23,"text":24,"correct":18},"D","先核心后外缘",{"key":26,"text":27,"correct":18},"E","自下而上分部开挖与衬砌支护","AC","本题考查的是地下洞室开挖。大断面洞室的施工，一般都考虑变高洞为低洞，变大跨度为小跨度的原则，采取先拱部后底部，先外缘后核心，自上而下分部开挖与衬砌支护的施工方法，以保证施工过程中围岩的稳定。",{"id":6,"name":31,"category":32,"favorite":33},"建设工程技术与计量（水利）","建筑工程",0]